Text
_ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
,
.
~re
December 24,1997
Mr. K. Greesser
Site Vice President
Byron Station
Commonwealth Edison Company
4450 N. German Church Road
Byron, IL 61010
SudJECT:
NRC INSPECTION REPORT NO. 50-454/97022(DRP); 50-455/97022(DRP)
Dear Mr. Graesser:
On December 1,1997, the NRC completed an inspection at your Byron 1 and 2 reactor
facilides. The enclosed report presents the inspection results.
,
L
'
Control room operations continue to be very good. Observations included consistent three-
way communications between operators and formal command and control by the unit
supervisor and shift manager. Operators responded appropriately to each annunciator
alarm. The operators minimized the number of personnel in the control room, and the work
execution center resulted in a significant reduction in the amount of distractions in the main
control room.
We are concerned that your corrective action program failed to adequately resolve identified
issues and take appropriate corrective action. Several issues were identified and
documented by your staff related to the 2B chemical and volume control (CV) pump wo k.
.
However, our review of your corrective actions showed that very little action had been
taken. The scope of the root cause that was done was not adequate. This resulted in a
violotion for an inadequate procedure.
A second violation was issued for a failure to follow your foreign material exclusion (FME)
procedure. We identified two uncovered openings in the containment floor drain sump,
which was identified as an FME area, with construction debris in the area and immediately
outside the area. Due to the construction activities during the steam generator replacement
and refueling outage, we are concemed that proper FME controls must be in place and
'
appiied appropriately. Foreign material intrusion can cause significant equipment reliability
problems and potentially lead to more serious problems.
/f
The violations discussed above are cited in the enclosed Notice of Violation. The
If
circumstances surrounding the violations are described in detail in the enclosed report.
Please note that you are enquired to respond to the violations and should follow the
instructions specified in the enclosed Notice when preparing your response. The NRC will
use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
'16nn02
lll g l Q y ll
9902060054 971224
ADOCK 05000454
G
,,,,,.,,
-
_ _ _ _ _ _ _ _ _ _
l
_ - _ _ _ _ _ _ _ _ _
.
,
K. Graesser
-2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
/s/ G. E. Grant
Geoffrey E. Grant, Director,
Division of Reactor Projects
Docket Nos. 50-454; 50-455
,
I
Enclosures:
1.
2.
Inspection Report
Nu. 50-454/97022(DRP);
50-455/97022(DRP)
cc w/encis:
O. Kingsley, Nuclear Generation Group
President and Chief Nuclear Officer
M. Wallace, Senior Vice
President, Corporate Services
H. G. Stanley, Vice President
PWR Operations
Liaison Officer, NOC--BOD
D. A. Sager, Vice President,
Generation Support
D. Farrar, Nuclear Pagulatory
Services Manager
I. Johnson, Licensing
Operations Manager
Document Control Desk-Licensing
K. Kofron, Station Manager
D Brindle, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaisor Officer
State Liaisc i Officer, Wisconsin
Chairman, Ilinois Commerce
Commission
1
-
. - . - - . _ . -
- - . -
- - . - - . - . -
--
.- - .-
. -
K. Gr=ss:r .
2-
.
In accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
.
Sincerely,
Geoffrey E. Grant, Director,
Division of Reactor Projects
Docket Nos. 504 54; 50-465
'
License Nos. NPF 37; NPF-66
Enclosures:
1.
2.
Inspection Report
No. 50-454/97022(DRP);
.
50-455/97022(DRP)
cc w/encis:
O. Kingsley, Nuclear Generatio- Group
President and Chief Nuclear Officer
M. Wallace, Senior Vice
President, Corporate Services
H. G. Stanley, Vice P,esident
PWR Operations
,
D. A. Sager, Vice President,
Generation Support
D. Farrar, Nuclear Regulatory
-
Services Manager
1. Johnson, Licensing
Operations Manager
Document Control Desk Licensing
K. Kofron, Station Manager
>
D. Brindle, Regulatory Assurance
Supervisor
Richard Hubbard
'
Nathan Schloss, Economist
Office of the Attomey General
4
State Liaison Officer
State Liaison Officer, Wisconsin
Chairman, Illinois Commerce
Commission
DOCUMENT NAME: G:\\BYRO\\BYR97022.0RP
To receive a copy of rhle docurrent. indicate In the boa *C'
Copy without ettschment/ enclosure *E' = Copt with attechenentlenclosure
- N" = No copy
l
OFFICE
Rlli
l
Rlli
l
Rlli
Rill
l
NAME
Tongue /et
Shear
Jordan
Grant
-'
Section R1
DATE
02/ /98
02/ /98
02/ /98
02/ /98
OFFICIAL RECORD COPY
_
. . .
_ _ - .
_
_
_
_
.
.
.
'
K. Graesser
3-
Distribution:
Docket File w/encle -
D R P w/e n cls
PUBLIC lE 01 w/encls
TSS w/encls
- A. Beach w/encle
DRS (2) w/encis
Deputy RA w/encic
Rlli PRR w/encls
Rlll Enf. Coort:. w/oncis -
' RAC1 (E Mail)
SRI Byron w/encls
CAA1 (E Mall)
Project Mgr., NRR w/encle
DOCDESK (E Mail)