Forwards SE Re Safety Classification of Instrument Air Tubing & Components for Safety Related Valve Top Works. Request for Exception from RG 1.26 Classification Acceptable Provided New IA Tubing & Components Satisfy Requirements
ML20199H619
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/21/1999
From: Chandu Patel
NRC (Affiliation Not Assigned)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20199H624 List:
References
RTR-REGGD-01.026, RTR-REGGD-1.026 TAC-M99161, NUDOCS 9901250251
Download: ML20199H619 (4)


Text

_. -. - . . .- . - . -.- -_ _ .

r 9* g.urg#'

g UNITED STATES

. [ g NUCLEAR RESULATORY COMMISSION E

f WASHINGTON. D.C. 20666-0001 V*****/ January 21, 1999 S& W.2 l Mr. Charles M. Dugger l Vice President Operations l Entergy Operations, Inc.

j P. O. Box B

Killona, LA 70066 i

SUBJECT:

SAFETY CLASSIFICATION OF INSTRUMENT AIR TUBING AND l COMPONENTS FOR SAFETY RELATED VALVE TOP WORKS AT l WATERFORD STEAM ELECTRIC STATION, UNIT 3 (TAC NO. M99161)

Dear Mr. Dugger:

The staff 2.as reviewed the Entergy Operations, Inc. (EOl), letter dated July 3,1997, as supplemented by letter dated November 13,1998, for an exception to Nuclear Regulatory Commission Regulatory Guide (RG) 1.26, " Quality Group Classifications and Standards for Water, Steam and Radioactive Waste-Containing Components of Nuclear Power Plants,"

regarding the safety classification of instrument Air (IA) tubing and components of safety- i related valve top assemblies at Watarford Steam Electric Station, Unit 3 (Waterford 3). Based i on the enclosed Safety Evaluation, the staff has concluded that your request is acceptable for the lA tubing and components of safety-related valve top assemblies currently installed at l l

Waterford 3. However, the staff has also determined that your request is not justifiable for future installation of simitar components at Waterford 3. Therefore, for future installation or l replacement of IA tubing and components of safety-related valve top assemblies at Waterford 3, the request for exception from the RG 1.26 classification is acceptable, provided .

l the new lA tubing and components of safety-related valve top assemblies at Waterford 3 satisfy l l all Division 1 construction requirements, defined in American Society of Mechanical Engineers /

(ASME) Code Section lil, Subarticle NCA-1110, Article NCA-9000, and Subsection ND, with the following exceptions: 1 0

1. The design may be based on the rules of ANSI B31.1, except that the tubing

(-o/

supports should be designed as Seismic Category 1.

2. The tubing and components may be exempted from the Authorized Nuclear inspection requirement.

The exception from RG 1.26 for installed components represents a non-conformance with the ASME Code and therefore, constitutes a deviation from the plant licensing commitments. The staff therefore, recommends that EOl revise its licensing basis for Waterford 3, to permit incorporation of the change summarized above.

4 9901250251 990121 PDR ADOCK 05000382 P PDR

,} j')gO RQO rn p p rm '

nMD U LL us & t. ., c y 5

-,--~.u

Vr .

I L

Mr. Charles M. Dugger This completes our review of your request. If you have any questions regarding this response please contact me at (301) 415-3025.

l 4 Sincerely, ORIGINAL SIGNED BY:

Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

As stated cc w/ encl: See next page

)

DISTRIBUTION:

,,. Docket File ; PUBLIC PD4-1 r/f C. Patel J.Hannon C.Hawes K. Brockman E. Adetsam (EGA1) ACRS M. Gamberoni T. Harris (TLH3)

Document Name: LTW99161. // ,

OFC PD4-1 PM/PD4-1 LA/PD4-1 EMEB , PD/bih-1 NAME MG oni/vw CPa Cda es KMfny JHannon l DATE / 9\ l /I9 /99 i //b/99 //0 /99 ///[ /99 COPY /ES/NO

\ O/NO YES/NO YES/NO f u

SbO i OFFICIAL RECORD COPY I

l

. . . _ . . . _ _ . _ . . _ _ _ . . ~ _ . . . _ _ . . . _ . _ - . . . _ _ _ _ _ _ . _ _ _ . -_ _ . --

v .

Mr. Charles M. Dugger -

l This completes our review of your request. If you have any questions regarding this response please contact me at (301) 415-3025.

Sincerely, h0f Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

As stated cc w/ encl: See next page l

f 1

i i

i i

1 l

~

Mr. Ch: ries M. Dugger Entergy Operations, Inc. Waterford 3 cc:

Administrator Regional Administrator, Region IV Louisiana Radiation Protection Division U.S. Nuclear Regulatory Commission Post Office Box 82135 611 Ryan Plaza Drive, Suite 1000 Baton Rouge, LA 70884-2135 Arlington,TX 76011 Vice President, Operations Resident inspector /Waterford NPS Support Post Office Box 822 Entergy Operations, Inc. Killona, LA 70066 P. O. Box 31995 Jackson, MS 39286 Parish President Council St. Charles Parish Director P. O. Box 302 Nuclear Safety & Regulatory Affairs Hahnville, LA 70057 Entergy Operations, Inc.

P. O. Box B Executive Vice-President Killona, LA 70066 and Chief Operating Officer Entergy Operations, Inc.

Wise, Carter, Child & Caraway P. O. Box 31995 ,.

P. O. Box 651 Jackson, MS 39286-1995 a Jackson, MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Commission Entergy Operations, Inc. One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825-1697 Killona, LA 70066 Licensing Manager Entergy Operations, Inc. .

P. O. Box B Killona, LA 70066 Winston & Strawn i 1400 L Street, N.W.

Washington, DC 20005-3502 l

i J

.