ML20199G814
| ML20199G814 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/20/1997 |
| From: | Rainsberry J SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9711250303 | |
| Download: ML20199G814 (5) | |
Text
,._.4
%Ot;f HI kN 04i11ORN1 A EDISON L' C t 1,
l.a l!%0% l%1t i:\\ 41HA SL'" Cuwpaus hovember 20, 1997 U. S. Nuclear Regulatory Commi,,sion Attention: Document Control Desk Washington, D.C.
20555 Gentlemen
Subject:
Docket Nos. 50-361 and 50-362 Emergency Core Cooling System Annual 10 CTR 50.46 Report San Onofre Nuclear Generating Station Units 2 and 3 This letter transmits the San Onofre Units 2 and 3 Annual Report for 1996 requiredby10CFR50.46(a)(3)(ii).
Provided as Enclosure 1 is the " Annual Report on ABB CE ECCS Performance Evaluation Models, CENPD-279, Supplement 8" dated February 1997. is the Loss of Ccalant Accident (LOCA)
Margin Summary for San Onofre Nuclear Generating Station Units 2 and 3. (CENPD-279, Supplement 8)indicatestherewerenochangesor errors made to the Asea Brown Boveri Comb stion Engineering (ABB CE) evaluation models or application of the models for the large break, small break, or post-LOCA long term cooling calculations in 1996.
The sum of the absolute niagnitudes of the peak fuel cladding temperature (PCT) changes for the large break LOCA from all reports through the end of 1996 continues to be less than l'F.
~
There were no additional changes made to the plant specific input assumptions for the limiting large break LOCA evaluated under 10 CFR 50.59 for the 1996 h
calendar year.
Therefore, the limiting large break LOCA PCT as of the end of 1996 is 2160'F, which is below the 10 CFR 50.46 acceptance criterion of 2200'F.
' provides a summary of the effect on PCT uf the errors or changes to the ECCS evaluation model reported under 10 CFR 50.46 for 1996 and the changes in 1996 to plant specific input assumptions for the limiting large s
break LOCA evaluated under 10 CFR 50.59.
The arithmetic sum of the PCT
\\
effects of both the 10 CFR 50.46 and 10 CFR 50.59 changes is a 0.0'T effect on
(
the 2160'F-large break LOCA analysis PCT.
h 971t250303 97tt20 T PDR ADOCK 05000361?
P PDR a
- San Om.fre Nwlem Gr eming Smkm ih k unt.CA 42674-0128-
+
I l
t 1
Do,cument Control Desk !
If you have any questions or need additional infonnation on this report.
l please let me know, i
i Sincerely, i
1
~
- \\
a i
Enclosures f'
cc E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 4
I r
h b
t I
1 i
i
i l
f i
j t
E i
i i
4 I
t i
t i
t i
1 i
i e
L Annual Report on ABB CE ECCS i
i Performance Evaluation Models f
CENPD-279 Supplement 8 i
e t
t t
I
~
f
., -, ~. -....
._. - ~ _.. - -, _ -., -...
.... _ _..,. ~.. _ _
. ~...,. _.. ~,, _.. '~
Q cr@R
. h COMBUSTION ENGINEERING OWNERS GROUP 1
r CENPD-279 i
SUPPLEMENT 8 i
i l
i l
ANNUAL REPORT ON ABB CE ECCS l
PERFORMANCE EVALUATION MODELS I
l FINAL REPORT i
CEOG TASK 975 I
I prepared for the l
C-E OWNERS GROUP l
February 1997 j
\\BB Combustion Engineering Nuclear Operations i
Corynght IW7 Comtcutam Engurenng, Inc. All nghu reserved EM DWk io ( (.
I LEGAL NOTICE This report was prepared as an account of work sponsored by the C4.mbustion Engineering Owners Group and ABB Combustion Engineering.
Neither Combustion Engineering, Inc. nor any person acting on its behalf:
A.
makes any warranty or representation, express or implied including the warranties of fitness for a particular purpose or merchanttbility, with respect to the accuracy, completeness, or usefulness of the information contained in this report, or that the use of any information, apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B.
assmnes any liabilities with respect to the use of, or for damages resulting from the use of, any information, apparatus, method or process disclosed in this report.
l l
Combustion Engineering, Inc.
l l
l l
l l
)
m
l
[
l l
. i ABSTRACT This report describes changes and errors in the ABB Combustion Engineering evaluation models -
for ECCS performance analysis in 19% per the requirements of 10CFR$0.46. For this reponing f
period, there were no changes or errors in the evaluation models or application of the models.
f The sum of the absolute magnitude of the PCT changes for large break LOCA from all reports to date continues to be less than l'F. No change occured in the PCT for small break LOCA or post.
[
LOCA long term cooling. Per the criteria of 10CFR50.46, no action beyond this annual report is required.
i e
s
+
i i
- "+--e+
-"ww'w--
..w-_a,MJ+
354 4
-4
-.&--J._ - -M_.
-w+-A.A A m a-,
e-.LA,c-4mm
-4 u-AdA-,sA*-
1,
-Aa._.;__
e4-.*.,,
..a3.o a%ma_s.AsA..su,4-.u--
_a-4~4
_m-4-4.-
-+w_-
-*L A
e t
t g
i' TABLE OF CONTENTS
- 1.0 -
INTRODUCTION 1
1 2.0 ~
ABB CE CODES USED FOR ECCS EVALUATION 3
3.0 EVALUATION MODEL CHANGES AND ERROR CORRECTIONS 4
4.0 CONCLUSION
S 3
a
5.0 REFERENCES
6 N
s O
V k
r
..Y' v
E
=
4
u.w a
h' o
p a
Hp e
1.0 INTRODUCTION
s N
This report addresses the NRC requirement to report changes or errors in ECCS performance e
evaluation models. The ECCS Acceptance Criteria, Reference 1, spells out reporting requirements and actions required when errors are corrected or changes are made in an evaluation model or in the application of a model for an operating licensee or construction permittee of a nuclear power plant.
The action requirements in 10CFR50.46(a)(3) 3re:
1.
Each applicant for or holder of an operating license or construction permit shall estimate the effect of any change to or error in an acceptable evaluation model or in the application of such a model to determine if the change or error is significant.
For this purpose, a significant change or error is one which results in a calculated peak fuel cladding temperature (PCT) different by more than 50'F from the temperature calculated for the limhing transient using the last acceptable model, or is a cumulation of changes and errors such that the sum of the absolute magnitudes of the respective temperature changes is greater than 50'F.
2.
For each change to or error discovered in an acceptable evaluation model cr in the application of such a model that affects the temperature calculation, the applicant or licensee shall report the nature of the change or error and its estimated effect on the limiting ECCS analysis to the Commission at least annually as specified in 10CFR50,4.
I t
3.
If the change or error is significant, the applicant or licensee shall provide this report within 30 days and include with the report a proposed schedule for providing a reanalysis or taking other action as may be needed to show compliance with 10CFR$0 46 requirements. This schedule may be developed using an integrated scheduling system previously approved for the facility by the NRC. For those facilities not using an NRC approved integrated scheduling system, a schedule will be established by the NRC stalTwithin 60 days of receipt of the proposed schedule.
4.
Any change or error correction that results in a calculated ECCS performance that does not conform to the criteria set forth in paragraph (b) of 10CFR50,46 is a reportable event as described in lkiR50.55(e),50.72 and 50.73. The affected applicant or licensee shall propose immediate steps to demonstrate compliance or bring plant design or operation into compliance with 10CFR50.46 requirements.
This report documents all the errors corrected in and/or changes to the presently licensed ABB CE ECCS performance evaluation models, made in the year covered by this report, which have not been reviewed by the NRC staff. This document is provided to satisfy the reporting requirements of the second item above. ABD CE reports for earlier years are given in References 2-9.
)
I 2.0 ABB CE CODES USED FOR ECCS EVALUATION ABB CE uses several digital computer codes for ECCS performance analysis that are described in topical reports, are licensed by the NRC, and are covered by the provisions of 10CFRSO.46.
Those for large break LOCA calculations are CEFLASH-4A, COhfERC-II, HCROSS, PARCH, STRIKIN II, and COMZIRC. CEFLASH-4AS is used in conjunction with COMPERC II, STRIKIN II, and PARCH for small break LOCA calculations. The codes for post LOCA long term cooling anlysis are BORON, CEPAC, NATFLOW, and CELDA.
. 4 3
l
l i
5 I
3,0
- EVALUATION MODEL CHA'JPES AND ERROR CORRECTIONS This section discusses all error corrections and model changes to the ABB CE ECCS performance f
evaluation models which may affect the calculated PCT.
l There were no changes to the ECCS evaluation models or changes to their application for calendar year 1996, t
6 I
e 1
4 1
a
=
c u
a.
au p
t 4.0 -.
CONCLUSIONS -
There were no changes or errors m the evaluation models or their application for large break LOCA, rmall break LOCA, or post LOCA analysis during 1996; consequently, there was no change in the PCT. The sum of the absolute magnitude of the changes in PCT calculated using the CE ECCS evaluation models, including those from previous annual reports, References 2-9, remants less than l'F.
Based on ' he results reponed here, there was no significant change in the sense of 10CFR50.46 in 6
t calendar year 1996 and no action beyond the submission of this report is needed.
S y
5.0 -
REFERENCES 1.
" Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors," Code of Federal Regulations, Title 10, Part 50, Section 50.46.
2.
" Annual Repon on C-E ECCS Codes and Methods for 10CFR50.46," CENPD-279, April, 1989.
3.
" Annual Report ori C-E ECCS Codes and Methods for 10GR50.46," CENPD-279, Supplement 1, February,1990.
4.
" Annual Report on C-E ECCS Codes and Method., br 10CFR50.46," CENPD-279, Supplement 2, April,1991.
5.
" Annual Report on C-E ECCS Codes and Methods for 10CFR50.46," CENPD-279, Supplement 3, April,1992.
6.
" Annual Report on C-E ECCS Codes and Methods for 10CFR50.46," CENPD-279,
{
Supplement 4, April,1993.
i 7.
" Annual Report on C-E ECCS Codes and Methods for 10CFR50.46," CENPD-279, Supplement 5, February,1994.
8.
" Annual Report on ABB C-E ECCS Performance Evaluation Models," CENPD-279, Supplement 6, February,1995.
9.
' Annual Report on ABB C-E ECCS Performance Evaluation Models," CENPD-279, Supplement 7, February,1996.
I I
i 4
f 6
d
d i
1 Loss of Coolant Accident Margin Summary for i;
-San Onofre Nuclear Generating. Station-Units 2 and 3 4
4 J
i J
Z 4
1
,, _.,.. ~ -..., _ _ -., _
- LOSS OF COOLANT ACCIDENT (LOCA) MARGIN
SUMMARY
L SAN ONOFRE NUCLEAR GENERATING STATION :-
- UNITS 2 AND 3 APCT PCT-A!
Limiting LBLOCA PCT (prior to 1996) 2160'F 2
' B.
Cumulative 10 CFR 50.46 Changes / Errors (Prior to 1996) <l*F :
C.
10 CFR 50.46 Changes / Errors Discovered (1996) 0.0' f D?
Limiting LBLOCA 10 CFR 50.59 Changes (1996) 0.0
- F E.
Current Limiting LBLOCA PCT (1996) 2160*F
~(Arithmetic Sum of the 10 CFR 50.46 changes and errors and the 10 CFR 50.59 changes for 1995) e l
a 3
o
)
f
,,v
...N.-
s
--.w,-.,
e,
- - ~,
e
-