ML20199F331

From kanterella
Jump to navigation Jump to search
Discusses Discrepancy in NRC SER on 970825.Amend Will Clarify Various Concerns Including Single Failure Vulnerabilities That Would Result in One Pump 2 Train Configuration
ML20199F331
Person / Time
Site: Pilgrim
Issue date: 01/27/1998
From: Wang A
NRC (Affiliation Not Assigned)
To: Olivier L
BOSTON EDISON CO.
References
NUDOCS 9802030138
Download: ML20199F331 (4)


Text

.

56.293

.. p m p

  • 4 UNITED STATES

}

NUCLEAR REGULATORY COMMISSION WAtsHINGTON, D.C. 300eH001

[

January 27, 1998 Mr. Leon J. Olivier Vice President - Nuclear / Station Director Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, MA 02360

SUBJECT:

DISCREPANCY IN NRC SAFETY EVALUATION REPORT (SER) DATED AUGUST 25, 1971. PILGRIM NUCLEAR POWER STATION

Dear Mr. Olivier:

By letter dated October 16, 1997, Boston Edison Company (BECo or the licensee) noted a discrepancy in a NRC SER dated August 25, 1971.

In this letter you note that the NRC SER states that, "On a loss of a.c. power the loops are automatically isolated by redundant valves." BECo noted that this is inconsistent with the Final Safety Analysis Repoi't (FSAR) which states that the middle pump will be pre-selected for a particular loop and only one isolation valve will receive a signal to close.

In addition. BECo noted that the valves are not and never were intended to be redundant. The FSAR states that the SSW system is designed to be independent and redundant (URI 97 06). While tho as-built configuration is properly described in the FSAR, the l[

staff has identified potential single failure vulnerabilities that do not I

appear to have been considered during the licensing phase. During a special inspection (Inspection Report 95-05), a single failure vulnerability was identified by the NRC involving the malfunction of a selector switch for the g[4)

" swing" (or fifth) SSW pump (EEI 97-05-03). The failure causes both headers to remain cross-tied and fed by a single pump. BECo closed one of the isolation valves in the interim to ensure independence and redundancy while l

the issue was being reviewed.

BECo has determined other scenarios which could j

lead to a one pump 2 train configuration and that operation in this configuration is an unreviewed safety question (USQ),

BECo has proposed a FSAR update by amendment.

FR" Han M8aiha ME Fd.E CENTE!! COPY

.l.lll.lllllillIIll

,,, c og

,ma

i L. Olivier '

The amendment will clarify various concerns including single failure vulnerabilities.that would result in a one pump 2 train configuration and the FSAR with respect to the following phrases " sufficient redundancy" and

" independent loops" as described SSW section of the FSAR. The licensee has proposed to submit the amendment by February 15, 1998. The staff will amend the original SER to reflect the results of the amendment at that time.

If you have any questions please call me at 301-415-1445.

Sincerely.

Original signed by Alan B. Wang, Project Manager Project Directorate I-3

' Division of Reactor Projects - I/II l

Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION y p 's TClark LPrividy PUBLIC THarris (TLH3)

JWiggins PDI-3 Reading OGC APal JZwolinski ACRS REaton CHehl, RI AWang EKelly DOCUMENT NAME: G:\\PILGRIMt I.SER l

m:_m,1~ :.m,7 " c' - ~v ~ ~~~~~ *v - ~v ~~

OFFICE PDI-3/PM PDI-3/LA S. PDIh$AD/

n NAME AWang@;/

TClart M C ; REatof DATE 1 / M 98

//AI//98 l /1) /98 OWCIAUlBECORD1COM l

l L

' ~

Mr. Leon J. Olivier Boston Edison Company Pilgrim Nuclear Power Station cc:

Mr. Ron Ledgett Executive Vice President Mr. Jeffery Keene 800 Boyleston Street Licensing Division Manager Boston MA 02199 Boston Edison Company 600 Rocky Hill Road Resident Inspector Plymouth. MA 02360-5599 U. S. Nuclear Regulatory Comission Pilgrim Nuclear Power Station Ms. Nancy Desmond Post Office Box 867 Manager. Reg. Affairs Dept.

Plymouth. MA 02360 Pilg#1 Rocky Hill Road rim Nuclear Power Station RFD Chairman Board of Selectmen Plymouth MA 02360 11 Lincoln Street Plymouth. MA 02360 Mr. David F. Tarantino Nuclear Information Manager Chairman. Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall RFD #1. Rocky Hill Road 878 Tremont Street Plymouth. MA 02360 Duxbury. MA 02332 Ms. Kathleen M. O'Toole Office of the Commissioner Secretary of Public Safety Massachusetts De)artment of Executive Office of Public Safety Environmental Protection One Ashburton Place One Winter Street Boston, MA 02108 Boston. MA 02108 Mr. Peter LaPorte. Director Office of the Attorney General Attn:

James Muckerheide One Ashburton Place Massachusetts Emergency Management 20th Floor Agency Boston. MA 02108 400 Worcester Road P.O. Box 1496 Mr. Robert M. Hallisey. Director Framingham. MA 01701-0317 Radiation Control Program Massachusetts Department of Chairman. Citizens Urging Public Health Res P.O. ponsible Energy 305 South Street Box 2621 Boston, MA 02130 Duxbury. MA 02331 Regional Administrator Region I Citizens at Risk U. S. Nuclear Regulatory Commission P.O. Box 3803 475 Allendale Road Plymouth, MA 02361 King of Prussia. PA 19406 W.S. Stowe, Esquire Ms. Jane Fleming Boston Edison Company 8 Oceanwood Drive 800 Boyleston St.

36th Floor Duxbury. MA 0233 Boston, MA 02199

~

cc:

(cont.)

Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Mr. William D. Meinert Nuclear EP)ineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 h

_ _ _ _ - _ _ _ _. -.. -. -. -..