knuary 27. 1998 Mr. Richard R. Grigg DISTRIBUTION Chief Nuclear Officer Docket Fib (50 266,301)
J.McC rmick Barger Wisconsin Electric Power Company PUBLIC M.Siemien (& MPS) 231 West Michigan Street, Room P37g PD3-1 Rdg C.L. Miller i
Milwsukee, WI 53201 E.Adensam (FGA1)
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2)
Dear Mr. Grigg:
By letter dated December 12,1997, Wisconsin Electric Power Company (WEPCO) submitted a copy of a temporary change to a procedure for the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual and noted that portions of the procedure containing names and telephone numbers were marked for NRC use only and not for public disclosure. We assume WEPCO is requesting that this information be withheld from public disclosure pursuant to 10 CFR 2.790 of the Commission's regulations. Your December 12,1997, submittal also provided a nonproprietary version of the procedure.
We have reviewed your request in accordance with the req'Jirements and criteria of 10 CFR 2.790 and have determined that the submitted information sought to be withheld contains privacy information. Therefore, the privacy information so identified in your December 12, 1997, letter will be withheld trom public disclosure pursuant to 10 CFR 2.790(a)(6) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons p;operly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to ocr consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information, if the basis for withholding this information from public inspection should change in the th such that the information could then be made avellable for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review -
this determination in the future, for example, if the scope of a Freedom of information Act f
request includes your information, in all review situations, if the NRC makes a determination p
adverse to the above, you will be notified in advance of any public disclosure.
O na signed by Linda L. Fundrum, Project Manager Project Directorate Ill-1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50 266,50 301 cc: See next page __
g gg g DOCUMENT NAME: G:\\WPDOCS\\PTBEACH\\PB971212. PRO w.e.w. em e,. omm nonoe m. do c c= #o.wwnveneme. r cmem enemnvenewe, w No ce OFFICE LA:PD31 5
PM PD31 E
BC:PERB A
OGO d.
(A)D.PD31 NAME CJamerson C/ LGun&um MN CLM Mr %
MPSiemieMfh CCarpenter CM DATE 01/ J l /98 f) 01/.4 /98 01/(( /98 01/ N/98 01/ 2 7 /98 OFFICIA' RECORD COPY PDR ADOCK 05000266 C,s PDR
- C8099k yo UNITE 3 STATES f,* p}
),
NUCLEAR RESULATORY COMMISSION s*
WASHINGTON. D.c. 30146-0001
%,[
January 27, 1998 Mr. Richard R. Grigg Chief Nuclear Officer Wisconsin Electric Power Company 231 West Michigan Street, Room P379 Milwaukee,WI 53201
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2)
Dear Mr. Grigg:
By letter dated December 12,1997, Wisconsin Electric Power Company (WEPCO) submitted a copy of a temporary change to a procedure for the Point Beach Nuclear Plant Emergency Plan implementing Procedures Manual and noted that portions of the procedure containing names and telephone numbers were marked for NRC use only and not for public disclosure. We assume WEPCO is requesting that this information be withheld from public disclosure pursuant to 10 CFR 2//90 cf the Commission's regulations. Your December 12,1997, submittal also provided a nonproprietary version of the procedure.
We have reviewed your request in accordance with the requirements and criteria of 10 CFR 2.790 and have determined that the submitted information sought to be withheld contains privacy information. Therefore, the privacy information so identified in your December 12, 1997, letter will be withheld from public disclosure oursuant to 10 CFR 2.790(a)(6) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information, in all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely,
$bt)k 4tb2una Linda L. Gundrum, Project Manager Project Directorate ill 1 Division of Reactor Projects - Ill/lV Office of Nuclear Reactor Regulation Docket Nos. 50 266,50-301 cc: See next page
I Mr. Richard R. Grigg Point Beach Nuclear Plant Woconsin Electric Pow.ir Company UnN Nos.1 and 2 cc:
Emest L Blake, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mr. Scott A. Patuiski Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company 6810 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, Wisconsin 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission -
801_Warrenville Road -
Lisle, Illinois 60532-4351 Resident inspector's ONice
. U.S. Nuclear Regulatory Commission 8612 Nuclear Road Two Rivers, Wisconsin 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854
.._