ML20199E855

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/86-10 & 50-368/86-10 on 860428-0502.No Violation or Deviation Noted
ML20199E855
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/19/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20199E859 List:
References
NUDOCS 8606240130
Download: ML20199E855 (2)


See also: IR 05000313/1986010

Text

_

,_ 7

__

_

_

_ __

.

.

'

. . .

!

JUN I 91986

'

4

In. Reply. Refer To:

Dockets:

50-313/86-10

50-368/86-10

'

4

4

'

Arkansas Power & Light Company

ATTN:

Mr. Gene Campbell

Vice President, Nuclear

Operations

'

P. O. Box 551

Little Rock, Arkansas 72203

'

Gentlemen:

This refers to the inspection conducted by Mr. H. D. Chaney of this office

during the period April 28 through May 2,1986, of activities authorized by NRC

.

Operating Licenses DRP-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2,

j

and to the discussion of our findings with Mr. J. M. Levine, and other members

l

_of your staff at the conclusion of the inspection.

i

Areas examined during the inspection included portions of the radiation

j

protection program. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspector.

The inspection findings are

'

documented in the enclosed inspection report.

1

Within the scope of the inspection, no violations or deviations were

identified.

'

i

We have also examined actions you have taken with regard to previously

!

l

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

!

l

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

I

!

8'Duginal Signed by;"

J E. Gagliardo, Chief

Reactor Projects Branch

'

Enclosures:

(see next page)

RIV:FRhS

C:FR

D:Dl

C:

B

C:RPB j/ b

i

DChaney/ w

Murr y

R Btn rt

DRHu ter

JEGagli q do

4/n/86

4 /a/86 [ Q /86

y/\\ ,86

b/J

5,

!

[

8606240130 860619

b

PDR

ADOCK 05000313

G

PDR

/ b

/

1

'

V

t

!

//

I

!

-

(

'

-

,. -

.

.

Arkansas Power & Light Company

-2-

Enclosures:

Appendix - NRC Inspection Report

50-313/86-10

50-368/86-10 with two attachments

cc w/ enclosures:

J. M. Levine, Director

Site Nuclear Operations

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bcc to DMB (IE06)

bcc distrib. by RIV:

  • RPB
  • Resident Inspector

R. D. Martin, RA

  • R&SPB
  • Section Chief (RPB/B)
  • D. Weiss, LFMB (AR-2015)
  • RIV File

DRSP

  • RSB
  • MIS SYSTEM
  • RSTS Operator
  • H.

D. Chaney

  • B. Murray

R. L. Bangart

  • w/766

4

-

.

.

. -

.