ML20199E415

From kanterella
Jump to navigation Jump to search
Forwards Rev 8 to AP-961, Earthquake & Rev 6 to EOP-06, SG Tube Rupture
ML20199E415
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/23/1998
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199E419 List:
References
NUDOCS 9802020151
Download: ML20199E415 (1)


Text

..

~ _. _

Documeid Transmittal #: 84861 Date: 1/23/98 (D

t t

Ta

NRC (DC DESK)

MAC: N/A Destination:

==

Description:==

Copy Copy Totals

^

Document:

Revision:

Comment:

INFO CNTL MSTR AP0961 08 7

1 0

0 EOP0006 06 7

1 0

L e'%

i Instructions to the Addressee:

Please verify the document (s) received agrees with the above information.

Operations department must attach old document (s) or portions of document (s) superseded by the above to this trancmittal.

Th2 signature indicates acknowledgment of receipt of the above document (s) and that documents have been updated Retum signed and dated transmittal to Document Control within 15 working days of Th I

transmittal date to mail code:

\\/

NA1C Flonda Power Carporaten Document Control, NA1C I,l!1,1!I,lill,il!! ll ll c-a- ~ c--

1s760 W. Power Line St.

[N Crystal River, FL 344284708 7'

7

.n q

(

O vVJ Signature of Addressee: ______

_ Date:

9902020151 900123 ADOCKOSOg32 PDR P

i

>