Text
.e
/j' *' c o, ultef tD sT Af ts
. ' ' +.
NUCLEAR REGULATORY COMMISSION E
R E GloN ov 611 RY AN PLAZA oRiva, sulTE 400 N,
./
AR LINoToN. T E X As 760118064 C Randy Hutchinson, Vice President-Operations Arkansas Nuclear One
' Entergy Operations, Inc.
1448 S.R. 333 Russellville, Arkansas 72801 0967
SUBJECT:
SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) ARKANSAS NUCLEAR ONE Dear Mr. Hutchinson On October 8,1997, the NRC staff completed the Semiannual Plant Performance
-Review (SPPR) of Arkansas Nuclear One. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance The results are used by NRC management to facilitste planning and allocation of inspection resources. The SPPR for Arkansas Nuclear One involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period April 1997 through September 1997, SPPRs
. provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment oi Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Arkansas Nuclear One SPPR review. It is provided to minimize the resource impact on your staff anc' to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for tha next 8 rnonths, The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature, We willinform you of any changes to the inspection plan, if you have any questions, i
please contact Elmo Collins at (817) 860 8291, I
Sincerely, k
u' omas P Gw n, Di ecto Division of Rea tot ojec s 1
9711210108 971134
[
Entergy Operations, Inc. :
Docket Nos.: 50-313 50 368 License Nos.: DPR 51 NPF 6
Enclosure:
Inspection Plan cc w/ enclosure:
Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286 1995 Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502 David D. Snellings, Jr., Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205 3867
..=..
.4 f
Enteroy Operations, Inc.
3-i Manager Rockville Nuclear Licensing Framatome Technologies.
1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 s
--1
i
?
\\
Entergy Operations, Inc.
4 NOV l d 1997 bcc to DCD (IE01) bec distrib, by RIV:
red onal Administrator Resident inspector i
DRP Director MIS System Branch Chief (DRP/C)
RIV File Project Engineer (DRP/C)
DRS PSB Branch Chief (DRP\\TSS)
DOCUMENT NAME: R:\\_ANO\\ANSP9704.LTR To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy we e,nclosures "N" = No copy RIV:PE:()RP/C C:Qlf/C D:DRS
//
D:DRP A./,
l CS$drsWV;df EEC6flins ATHowell/{"i TPGwynn /7 10/ ] \\ /97 '
10/34/97 1$/ (3/97 b '
14//T /97 l
OFFICIAL RECORD CDhY
.i i
s
"~
Entergy Operations, Inc.
4-i.
bcc to DCD (IE01) bec distrib. by RIV:
Regional Administrator Resident inspector DRP Director MIS System -
Branch Chief (DRP/C)
RIV Filo Project Engineer (DRP/C)
DRS-PSB Branch Chief (DRP\\TSS)
I t
DOCUMENT NAME: R:\\_ANO\\ANSP9704.LTR
!To receive copy of document, indicate in r 07: "C" = Copy without enclosures *E" = Copy with e,nclosures "N" = No copy RIV:PE:pRP/C j C:QRf'/C l
- D:DRS l,'
D:DRP l A),
l
' CShMrshtiaTI;dt EEC611 ins ATHowell.
TPGwynn[I 7 10//g n /97 10/'7{/97 1$/
/97 14//7/97' OFFICIAL RECORD COfsy
!NSPECTION l"w%N ARV ASAS NUCLEAR ONE m
IP - Inspection Procedure Tl - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE /
NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS l-IP 83750 Radiation Protection 1
11/17-21/97 Care, both units IP 81700 Physical Security Program 1
11/17-21/97 Core, both units IP 62706 Maintenance Rule Inspection 3
01/26-30/98 Maintenance Rule Baseline inspection IP 7353 incervice inspection 1
03/30-Core 04/03/98
.-