ML20199E126

From kanterella
Jump to navigation Jump to search
Forwards Rev 5 (IC 01) to EOP-03, Inadequate Subcooling Margin, Rev 4 (IC 01) to EOP-04, Inadequate Heat Transfer & Rev 2 (IC 01) to EOP-14, Emergency Operating Procedure Enclosures
ML20199E126
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/24/1998
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199E131 List:
References
NUDOCS 9802020096
Download: ML20199E126 (1)


Text

.. -.

Document Transmittal #: 85302 Date: 1/24/98 To:

NRC (DC DESK)

MAC: N/A Destination:

==

Description:==

Copy Copy Totals Document:

Revision:

C_omment:

INFO CNTL MSTR EOP0003 05 IC 01 7

1 0

0 EOP0004 04 IC 01 7

1 0

0

- - ~ ~

n n.

EOP0014 02 IC 01 7

1 0

0 k

O/

anj Instructions to the Addressee:

PlGase verify the document (s) received agrees with the above information.

Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal.

The signature indicates acknowledgment of receipt of the above document (s) and that documents have been updated. Retum signed and dated transmittal to Document Control within 15 working days of transmittal date to mail code:

NA1C uyp Fionda Power Corporation l} ; !

Document Control. NA1C V.. V V d,{#

~'

. e 'u Crysta! Rtser Energy Complex 15760 W. Power une St Crystal Ruer. FL 34423-6703 Signature of Addressee:

Date:

9802020096 980124 PDR ADOCK 05000302 P

PDR

-