ML20199D986

From kanterella
Jump to navigation Jump to search
Advises of Planned Insp Effort Resulting from Plant Semianuual Plant Performance Review.Details of Insp Plan for Next 8 Months Encl
ML20199D986
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/14/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 9711210076
Download: ML20199D986 (7)


Text

f.

t.

[.

_ j""G%

uNITEo STATES L 3 ! 11-_

,.bk, NUCLEAR REGUL'ATORY COMMISSION

[j 8 - REcioN iv k,M(('

I 611 RY AN PLAZA oRivF.SutTE 400

[

6; +..'.,.

AR LING ton. T E xAS 760118064 NOV - l 41997

- Harold B. Ray,' Executive Vice President

~

Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 -

San Clemente, California 92674-0128

SUBJECT:

' SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) SAN ONOFRE NUCLEAR GENERATING STATION

Dear Mr. Ray:

-On October 9,1997, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of San Onofre. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources.

The SPPR for San Onofre involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from March through September 1997, SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the San Onofre SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reasen for emphasis in these program areas. The regional initiative inspection schedaled is consistent with the recent SALP assessment. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. if you have any questions, please contact Dennis Kirsch at (510) 975-0319.

Sincerel ^

/

1 Thomas P. Gwynp, Pro

  • cts Direc or Division of Reac or I

Docket Nos.: 50-361 50 362.

f

. License Nos.
NPF-10 i

9711210076 971114 gDR ADOCK 05000361 IIIl Rill 5lRMlli

r:

.'s.

2-Southern California Edison Co.

~

p..-

.t

Enclosure:

Linspection Plan _.

cc w/ enclosure:

i Chairman, Board of Supervisors:

-County of San Diego.

1600 Pacific Highway, Room 335 =

San Diego, California 92101

. Alan R. Watts, Esq.

Woodruff, Spradlin & Smart -

701 S. Parker St. Suite 7000 Orange,- Ca!ifornia 92868-4720 Sherwin' Harris, Resource Project Manager..

Public Utilities Department

' City of Riverside 3900 Main Street Riverside, California 92522 R. W Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O.' Box 128.

San Clemente, California 92674-0128 Dr. Harvey Collins, Chief Division of Drinking Water and --

Environmental Management California Department of Health Services P.O. Box 942732 Sacramento,-California 94234-7320 Terry Winter, Manager

Power Operations San Diego Gas & Electric Company P.O. Box 1831 San Diego, California 92112 Mr. Steve Hsu -

Radiological Health Branch State Department.of Health Services P.O. Box 942732

. Sacramento, California 94234 La; s-w-

w 9

tw

4 '

- e j '

41 s~i 3 --

1^

Southern California Edition Co; v

' Mayor.

- City of San Clemente

- 100 Avenida Pr'esidio -

San Clemente, California 92672-'

- Mr. Truman Burns \\Mrl Robert Kinosian-

- California Public Utilities Commission -

-=

505 Van Ness, Rm.-4102-

- San Francisco, California 94102

..~

+-

7 k

h i

~

t s

+

y-w w.,

_v-w-y w.,,

yye,-

n w

ee W

<>'--,- +

ea,-

e

=-

e e

c-M

_. ~

M

[:;

f(q7 i-FI Southern Californla Edison'Coi.

-4 _

4 t

bec to DCD (IE01)-

-- bec distrib. by RIV:

l Regional Administrator.

Resident inspector _:

j DRP Director:.

DRS-PSB.

- Branch Chief (DRP/F, WCFO):

MIS System

.. Senior Project inspector (DRP/F, WCFO)-

RIV File'

~!

- Branch Chief (DRP/TSS)-

M. Haminond (PAO, WCFO)

WCFO File a

t

$ ~

F e

e O

-DOCUMENT NAME: R:\\ ISO 23\\SOSP9704.LTR To receive ccpy of document, isidicate in. box: "C" t Copy without enclosures T' = Copy w:th encksures "N" = No copy l

RIV:C:DRP/F D:DRS -

-_g D:DRP.

f) e

_ y \\g ATHowell 99, TPGwynn 7 f CFKirach;df 10/15/97 oj@pl) 1$/ ($/97 /W 10//87/97 ' - (/

OFFICIA. RECORD COPY-o.,,

=nt.

I if2 9.

n

,. ~.. -

'9 7

.. 4' J.

LNOV L 4 RTT

-i

Southern California ~ Edison' Co.)

-4

-y, _.

t A

.jllc r

i 9

-t l

bec to DCD (IE01)--

- bec distribc by RIV:..

Regional Administrator-Resident inspector.

DRP Director DRS-PSB '

' Branch Chief (DRP/F, WCFO)':

MIS System

~ Senior. Project inspector (DRP/F, WCFO)

RI V File Branch Chief (DRP/TSS)

M. Hammond (PAO, WCFO).

'f l

WCFO File

--s 4

e 11 DOCUMENT NAME: @\\_SO23\\SOSP9704.LTR i To receive copy of document, indicate In box: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy illV:C:DRP/F D:DRS.

D:DRP

-M g.-

'DFKirsch;dt - { g \\g ATHowell TPGwynn f7 10/15/97 -ohQiQ 1$/

/97 1$//'f/97 ' (/

OFFIClAL RECORD COPY

7 SAN ONOFRE NUCLEAR GENERATING STATION INSPECTION PLAN IP - Inspection Procedure Ti - Temporary instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE /

NUMBER OF PLANNED TYPE OF l'

PROGRAM AREA INSPECTORS INSPECTION DATES INSPECTION CCMMENTS IP 81700 Physical Security Program for 1

11/17-11/21/97 Core Inspection Power Reactors IP 50002 Steam Generators 1

12/97 Regional Initiative Inspection (exact dates TBD)

IP 62706 Maintenance Rule Team 7

12/01-12/05/97 Regional Team Inspection IP 82701 EP Ops Status 1

12/08-12/12/97 Core inspection