d DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 4/7/86 COMPLs1m M D.
B.
PRATTF TELEPHONE 114 /6 76-R4 60 PART A OPERATIONS
SUMMARY
The plant was shut down for refueling operations for the entire month of March 1986. Mode 6 was entered on March 6, 1986 and exited on March 29, 1986.
i PART B PORV AND SAFETY VALVE
SUMMARY
None l
i l
I 4
8606230047 860331 PDR ADOCK 05000483 R
PDR CA-#804 04/10/85 QDP-ZZ-04204
\\
Page 1 of 4
=
==
5 Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT Callaway DATE 4/7/86 D. B. PRATTE COMPLETED BY 314/676-8460 TELEPHONE l
MARCH 1986 MONTH i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1 0
1 gy 0
0 0
2 g
0 O
3 3,
0 0
I 4
g 0
0 s
O 0
e n
l 7
0 0
g 0
0 8
g 0
0 9
5 to o
28 m
11 0
27 n
12 0
g n
13 0
g o
14 0
3 0
1s 0
0 31 0
16 Page 2 of 4 G-#804 04/19/85 QDP-ZZ-04204
-P $.PMW4g1t j f,
7
- r VT-.
(M P#*.t.fim f.ep9 p g g p g ggg-tg
+-p g g M 9 pgg =gp g-g wy
+-.
p p.-
ye p-mtw %.n,,awp,m. w wg-p d ww w.w p
'Nw
-T-yT-
'?Nw
%9-7T-*y err-W
- 'e*
-' ar
.e ParC D
' OPERATING DATA REPORY 50-483 DOCKET NO.
UNIT 4/7/86 DATE D. B. PRATTE COMPLETED BY 314/676-8460 TELEPHONE OPERATING STATUS
( YTD CUFF )
Fiarch 1986 744 (2160 11222.5)
- 1. REPORTING PERiCo:
Gross HOURS IN REPORTING PERICO.
3411 1120
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWti:
Max. OEPEND. CAPACITY thl:
oEslGN ELECTRICAL RATING (MWo.Neo:
1171*
- At stretch power level which is not currently
- 2. NE tchEt. E CERhRib85fNAN"Y$tgse.
100'/
- 4. REASONS FOR RESTRICTION llP ANYl:
THIS MONTH YR TO DATE CUMUI.ATIV E 0
1415.8 9879.3
- 5. NuMsER OF Hours REACTOR WAS CRITICAL 0
0 0
E. REACTOR RESERVE SHUTDOWN HOURS 0
1413.5 9600.9
- 7. Hours GENERATOR ON uNE.
0 O
G~~
- s. umiT RESERVE sMutoOWN wCUR2....
0 4,606.741 30.674.?so
- 9. GROSS THERMAL ENERGY GENERATED (MWHI 10.1RQ.46R O
1,s76.075
- 10. Gross ELECTRICAL ENERGY GENER ATED (MWHO,..
0 1,500.363 9,869.150
- 11. NET ELECTRICAL ENERGY GENERATED IMWHI 0.0%
65.5%
R R. O*r
- 12. REACTOR SERVICE PACTOR.........
0.0%
65.5%
88.07d
- 12. REACTOR AVAILAst uTY PACTOR._.....................
0.0%
65.4Y 85.67
- 14. UNIT SERVICE PACTOR..........
0.0%
65.4%
85.6%
- 15. uMIT AvAiLAsi uTY PACTom........................
0.0%
62.0%
78.5%
iE. UNIT CAPAC'fY PACTOR (Uang McC1.
0.0%
59.3%
75.17
- 17. _ UNIT CAPACITY P ACTOR (Ueng Dougn MWH,.......,.......
O.0%
- 0. 0*/
91r
- 18. UNIT PORChD OUTAGE RATE.........................
- 19. SHUTDOWNS SCHEDULED OVER NEXT E MONTHS (TYPE.DATE. ANO DURATION OF EACMI: None i
4 /19 /A6
- 20. IP SMUT DOWN AT END OF REPORT PERICO. ESTIMATED DATE OF STARTUP:
CA-#804 Page 3 of 4 04/10/85 QDP-ZZ-04204
M
- 1 i
l Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE 4/7/86 COMPLETED BY D.
B. PRATTF REPORT MONTil MARCH 1986 TELEPHONE 314/676-8460_
4, METHOD OF i 1 TYPE SHUTTING DOWN i
F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED IHOURSI REASON REDUCING POWER CORRECTIVE ACTIONS /COM0ENTS 1
5.
3/1/86 S
744 C
1 Refueling Outage.
'I l
l.
.o J
1 4
i i
SuedMARY:
1 j
REASON BETM00 A: EQUBF00ENT FA8 LUBE (EEFLAlge I: MAIRIAL 3: bdA8ItE.ORTEST 2: BAA80UAL SCRAld C: REFUEUSIG 3: AUTOt84TICSCRAts oon yQ D: REGULATOSY.RESTR8CTIO91 4: OFIER(EEFLAsp4
[
U a P e.
E: OPERATOR TRA300ING AleD NO*
L9CEleSE EIARIINAT1080 000 F: ADesteISTRATIVE 8
O C: OfERAT9000AL ESSOR(EIfLA8N)
II OFIERGEEFLAlp4
+
Page 4 of 4 i
UNION ELECTRIC COMPANY l
Colkway Plant April 9, 1986 l
Director, Resource Management l
Nuclear Regulatory Commissier l
Washington, DC 20555
~
ULNRC-1290
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MARCH 1986 The enclosed Monthly Operating Report for March 1986 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1
~
Technical Specifications.
~
/
G. L. Randolph Manager, Callaway Plant d k @/IPS/DBP/drs T9h W MET /RDA Enclosure cc: Distribution attached h
Mailing Address: RO. Box 620 Futton, MO 65251
cc distribution for ULNRC-1290 with enclosures Mr. C. W. Hehl, Chief Project Section 2A U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102 l