Text

b

(

9 oom

~

^

G Eo

[

EO Table 3.2-1 8.

2 Rs INSTRtMENTATION WHICH INITIATES REACTOR VESSEL AND PRIMARY A

S CONTAllMENT ISOLATION gg g

oo u@$

Required Action to be taken if gg-Trip Operable number of channels is

%jlo.

Condition Channels Trip Setting ef.

not met for both trip Remarks (d)

Instrument Nomenclature per Trip systems (c)

.f a)

System (b)

InitiatesGroup2&6l~

Initiate an orderly 1

Reactor Vessel Low (Level 3) 2 1 10.0 inches shutdown and achieve isolation.

Water Level Narrow Range the Cold Shutdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or isolate the shutdown cooling system.

Initiate an orderly Starts the SGTS, l

Low Low 2

1-47 inches shutdown and achieve initiates Group 5 isolation, and (Level 2) the Cold Shutdown Condition within 24 initiates Iw

'L secondary containment hours.

j4 isolation.

l Initiates Group 1 l

Initiate an orderly Low Low Low 2

3-113 inches shutdown and achieve isolation.

(Level 1) the Cold Shutdown Con-dition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Isolates the shutdowd 2

Reactor Vessel Steam Low Perinissive 1

<145 psig Isolate shutdown cooling, suction valves cooling.

of the Rt!2 system.

Dome Pressure (Shut-down Cooling Mode)

Starts the standby l

Initiate an orderly

_. 1.92 psig shutdown and achieve gas treatment system, 2

'l Drywell Pressure liigh initiates Group 2 the Cold Shutdown isolation and second-Condition within 24 ary containment isolation.

l hours

,A A

i Table 3.2-1 (Cont.)

l Required Ref.

Trip Operable Action to be taken if gMo.

I Instrument Condition Channels Trip Setting number of channels is not met for both trip Remarks (d) f(a)

Nomenclature per Trip f

System (b) systems (c)

.s E

y4 h in Steam Line High 2

$3 times normal Initiate an orderly load Initiates Group 1 Radiation full pouer back-reduction and close MSIVs isolation.

l ground (e) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

j y

y5 hin Steam Line Low 2

>825 psig Initiate an orderly load Initiates Group 1 reduction and close isolation. Only Pressure MSIVs within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

required in RUN mode, l

h therefore activated when Mode Switch is in i

m RUN positlon.

l 6

hin Steam Line High 2

5138% rated flow Initiate an orderly load Initiates Group 1 l

Flow (sil5 pslJ) reduction and close MSIVs isolation.

within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

T 7

h in Steam Line High 2

$194*F Initiate an orderly load Initiates Group 1 reduction and close MSIVs isolation Tunnel Temperature within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

w 1

l 8

Reactor h ter High 1

20-80 gpa Isolate reactor water Final trip setting cleanup system.

wiH be determined Cleanup System during startup test l

Differential Flow program.

9 Reactor h ter High 2

1124*F Isolate reactor water j

cleanup system.

Cleanup Area Temperature 4

l 10 Reactor Water High 2

$67'F Isolate reactor water cleanup system.

Cleanup Area f

4 Ventilation 1

Differential Temperature l

31 Condenser Vacuum Low 2

>J" Hg. vacuum Initiate an orderly load Initiate Group'1 t

reduction and close MSIVs isolation within 8 hrs.

!