Text
-
,
9
.
J
JUN 131936
Docket No. 50-341
The Detroit Edison Company
ATTN:
Frank E. Agosti
Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
.
This refers to the routine safety inspection conducted by Messrs. N. Choules,
W. Rogers and R. Sutphin of this office on April 7-11 and 21-25, 1986, of
activities at the Fermi Nuclear Power Plant authorized by NRC Operating License
No. NPF-33 and to the discussion of our findings with Mr. Lenart and others of
your staff at the conclusion of the inspection.
It also refers to the
enforcement conference held on May 30, 1986, in the Region III office.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities-appeared to be in violation
.
of NRC requirements, as described in the enclosed Notice. A written response
is required.
The enforcement conference was held to discuss the two violations identified
in the enclosed report. The violations involved the failure to perform
functional tests and calibrations as required by the Technical Specifications.
'
During the meeting, we discussed your surveillance program and your planned
corrective actions to improve it.
Your plans appear to be appropriate.
In the
future, we will look to see what improvements the corrective actions have made
in your surveillance program.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
r
l
this letter, the enclosures, and your response will be placed in the NRC
Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
8606180237 860613
~
ADOCK 05000341-
O
5\\
%2L
.
4
The Detroit Edison Company
2
JUN 131986
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Or
6C
Carl J' Pa riello, Director
.
Division of Reactor Safety
Enclosures:
1.
Notice.of Violation
2.
Inspection Report
No. 50-341/86011(DRS)
cc w/ enclosures:
L. P. Bregni, Licensing
Engineer
P. A. Marquardt, Corporate
Legal Department
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Harry H. Voigt, Esq.
Nuclear Facilities and
Environmental Monitoring
Section
Monroe County Office of
Civil Preparedness
YA
m"fb
N
(9'O
"I
E
W
" [
Harrhson
tello
Choules/mj
Sutphin
Hdwkids
it
lllblTY
SlI3IE0
f$/ O