Forwards Safety Insp Rept 50-341/86-11 on 860407-11 & 21-25 & Notice of Violation.Enforcement Conference on 860530 Re Failure to Perform Functional Tests & Calibrs Also Discussed
ML20199C745
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/13/1986
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
Shared Package
ML20199C748 List:
References
NUDOCS 8606180239
Download: ML20199C745 (2)


See also: IR 05000341/1986011

Text

- ,

9 .

J

JUN 131936

Docket No. 50-341

The Detroit Edison Company

ATTN: Frank E. Agosti

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen: .

This refers to the routine safety inspection conducted by Messrs. N. Choules,

W. Rogers and R. Sutphin of this office on April 7-11 and 21-25, 1986, of

activities at the Fermi Nuclear Power Plant authorized by NRC Operating License

No. NPF-33 and to the discussion of our findings with Mr. Lenart and others of

your staff at the conclusion of the inspection. It also refers to the

enforcement conference held on May 30, 1986, in the Region III office.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

. During this inspection, certain of your activities-appeared to be in violation

of NRC requirements, as described in the enclosed Notice. A written response

is required.

The enforcement conference was held to discuss the two violations identified

in the enclosed report. The violations involved the failure to perform

'

functional tests and calibrations as required by the Technical Specifications.

During the meeting, we discussed your surveillance program and your planned

corrective actions to improve it. Your plans appear to be appropriate. In the

future, we will look to see what improvements the corrective actions have made

in your surveillance program.

r In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

l this letter, the enclosures, and your response will be placed in the NRC

Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

~

8606180237 860613

PDR ADOCK 05000341-

O PDR

5\

%2L_

.

4

The Detroit Edison Company 2 JUN 131986

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Or 6C

Carl J' Pa riello, Director

.

Division of Reactor Safety

Enclosures:

1. Notice.of Violation

2. Inspection Report

No. 50-341/86011(DRS)

cc w/ enclosures:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

Nuclear Facilities and

Environmental Monitoring

Section

Monroe County Office of

Civil Preparedness

YA

m"fb

Choules/mj