ML20199B865
| ML20199B865 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/23/1998 |
| From: | FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20199B869 | List: |
| References | |
| NUDOCS 9801290033 | |
| Download: ML20199B865 (1) | |
Text
-
Document Transmittal #: 84699 Date: 1/23/98 Tc:
NRC (DC DESK)
MAC: N!A Destination:
==
Description:==
Copy Copy Totals Document:
Revision:
Comment:
INFO CtifL MSTR AR0303 28 24 1
0 0
AR0703 12 24 1
0 0
Instructions to the Addressee:
Please verify the document (s) received agrees with the above information.
Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal, The signature indicates acknowledgment of receipt of the above document (s) and that documents have
[k' been updated. Retum signed and dated transmittal to Documerit Control within 15 working days of transmittal date tc mail code:
NA1C Flonda Pcwer Corporaten Document Control, NA1C Crystal Rrver Energy Complex if )f
,I,
!f l
15760 W. Power Line St.
' ['
I', i Crystal Rwer, FL 34428-6708
- y21, Signature of Addressee:
Date:
9801290033 990123 PDR ADOCK 05000302 P
PDR a