ML20199B490
| ML20199B490 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 06/11/1986 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20199B494 | List: |
| References | |
| NUDOCS 8606170162 | |
| Download: ML20199B490 (2) | |
See also: IR 05000456/1986019
Text
'
- -
..
JUN 111986
-
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. W. B. Grant
of this office on May 19-22, 1986, of activities at Braidwood Nuclear Power
Station, Units 1 and 2 authorized by NRC Construction Permits No. CPPR-132
and No. CPPR-133 and to the discussion of our findings with Mr. E. Fitzpatrick
p and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas exaniined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection. We are concerned, however, that recent personnel losses within the
health physics program may significantly weaken the effectiveness of that
program to address both preoperational and operational activities.
Please
respond within 30 days of the date of this letter informing us of your actions
to address this concern.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
l
this letter, the enclosures, and your response to this letter will be placed
l
in the NRC Public Document Room.
l
05
A,y(;+
-
-
-
8606170162 860611
i
l
ADOCK 05000456
ik i
i
G
PDR-
4\\ t
l
-
.
.
.
G
m
-_
-
Commonwealth Edison Company
2
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
"# rig ~inal dened by W,0. $hefer"
W. D. Shafer, Chief
Radiological Protection Branch
Enclosure:
Inspection Reports
No. 50-456/86019(DRSS)
No. 50-457/86017(DRSS)
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management-Branch
'
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
,
j
General's Office, Environmental
l
Control Division
l
D. W. Cassel, Jr., Esq.
'
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
!
The Honorable Herbert Grossman, ASLB
l
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
RIII
R
RII
R
kh
%Y
Grant /kst
G
LittTe
S
r
l
li