Forwards Safety Insp Repts 50-456/86-19 & 50-457/86-17 on 860519-22.No Violation Noted.Requests Actions to Be Taken Re Recent Personnel Losses within Health Physics Program within 30 Days
ML20199B490
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/11/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20199B494 List:
References
NUDOCS 8606170162
Download: ML20199B490 (2)


See also: IR 05000456/1986019

Text

'

- -

..

JUN 111986

-

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. B. Grant

of this office on May 19-22, 1986, of activities at Braidwood Nuclear Power

Station, Units 1 and 2 authorized by NRC Construction Permits No. CPPR-132

and No. CPPR-133 and to the discussion of our findings with Mr. E. Fitzpatrick

p and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas exaniined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection. We are concerned, however, that recent personnel losses within the

health physics program may significantly weaken the effectiveness of that

program to address both preoperational and operational activities.

Please

respond within 30 days of the date of this letter informing us of your actions

to address this concern.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

l

this letter, the enclosures, and your response to this letter will be placed

l

in the NRC Public Document Room.

l

05

A,y(;+

-

-

-

8606170162 860611

i

l

PDR

ADOCK 05000456

ik i

i

G

PDR-

4\\ t

l

-

.

.

.

G

m

-_

-

Commonwealth Edison Company

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

"# rig ~inal dened by W,0. $hefer"

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure:

Inspection Reports

No. 50-456/86019(DRSS)

No. 50-457/86017(DRSS)

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management-Branch

'

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

,

j

General's Office, Environmental

l

Control Division

l

D. W. Cassel, Jr., Esq.

'

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

!

The Honorable Herbert Grossman, ASLB

l

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

RIII

R

RII

R

kh

%Y

Grant /kst

G

LittTe

S

r

l

li