I; O
Arizona Nuclear Power Project P o BOX 52034 e PHOENIX, ARIZONA 85072-2034 May 21, 1986 CORRECTED COPY OF:
ANPP-36653-EEVB/JRB/94.04 IEITER ANPP-27154 DATED MAY 16, 1986 Mr. John B. Martin Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region V 1450 Fbria Lane, Suite 210 Walnut Creek, CA 94596-5368
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 (License NPF-51)
Certification of the Operability of All Required Systems for Initial Entry Into Mode 1 File: 86-F-056-026; 86-C-056-026
Reference:
PVhGS Unit 2 Operating License NPF-51
Dear Mr. Martin:
As required by the Palo Verde Nuclear Generating Station Unit 2 Operating License, NPF-51, I am hereby certifying that item 1.a of Attachment 1 to the license has been completed for initial entry into Mode 1.
We have installed and verified operable a Post Accident Sampling System which meets the provisions of NUREG-0737 (II.B.3). The operability of all systems required for Mode 1 entry has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications. This has been accomplished by the completion of the applicable surveillance tests or by pre-operational testing, which verifies the meeting of requirements of the Technical Specifications and which was performed within the required surveillance interval or by operability as demonstrated for Modes 2, 3, 4, 5 and 6.
Very truly yours, 8606170036 860521 f
DR ADOCK 0500 9
(Q E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/JRB/rw cc: