January 22, 1998 gg a

MEMORANDUM TO: Thomas H. Essig Acting Chief Generic Issues and Environmental Projects Branch Divisloa of Reactor Program Management, NRR FROM:

Eileen M. McKenna, Senior Reactor Engineer Original Signed By:

Generic issues and Environmental Projects Branch Division of Reactor Program Management, NRR SUDJECT:

SUMMARY

OF WORKSHOP HELD ON JANUARY 1213,1998, BY THE NUCLEAR ENERGY INSTITUTE (NEI) ON LICENSING ISSUES Members of the NRC staff attended a workshop sponsored by the Nuclear Energy Institute concerning NEl initiatives on development of guidance documents for various licensing issues, including implemention of the 10 CFR 50.59 process, and updating of safety analysis reports in accordance with 10 CFR 50.71(e). The workshop was open to the public. Attachment 1 is the agenda for the workshop. A list of NRC attendees are provided as A*tachment 2; about two hundred nuclear industry representatives were also in attendance.

During the workshop, Mr, Frank Miraglia of NRC made a presentation about staff actions in these Ersas; a copy of his presentation materials are included in Attachment 3.

Project No. 689 Attachments: As stated cc w/ atts: See next page DISTRIBUTION w/ attachments (Hard coovt PUBLIC Docket::

PGEB r/f SMagruder EMcKenna OGC ACRS E-Mail: SCollins/Fmiraglia BSheron RZimmerman JRoe/DMatthews GTracy, OEDO

/

Document Name: g:\\emm\\mtsum11M OFC PGEBhh SC:PGE) h (A)C:PGEB NAME EMcKenna FAksdle\\

TEssigh GI-/7 DATE 16/98 1/I/98 1/2h8 OFFICIAL RECORD COPY W

m m u zzE3BCPY pw3, He 9001290000 990122 PDR REVGP ERONUMRC PDR

hhff, fY N *; b L

..-.-.. ~

%,\\

UNITED SDTES y=~

l h}'

NUCLEAR REGULATCdY COMMIS810N WASHINGTON, D.C. acceH001 January 22, 1998 MEMORANDUM TO: Thomas H. Essig, Acting Chis!

Generic issues and Environmental Projects Branch Division of Reactor Program Management, NRR Eileen M. McKenna, Senior Reactor Engineer h /)[d FROM:

Generic lasues and Environmental Frojects Branch k

Division of Reactor Program Management, NRR

SUBJECT:

SUMMARY

OF WORKSHOP HELD ON JANUARY 12-13,1998, BY THE NUCLEAR ENERGY INSTITUTE (NEI) ON LICENSING ISSUES Members of the NRC staff attended a workshop sponsored by the Nuclear Energy Institute concoming NEl initiatives on development of guidance documents for various licensing issues, including implemention of the 10 CFR 50.5g process, and updating of safety analysis reports in accordance with 10 CFR 50.71(e). The workshop was open to the public. Attachment 1 is the agenda for the workshop. A list of NRC attendees are provided as Attachment 2; about two hundred nuclear industry representatives were also in attendance.

During the workshop, Mr. Frank Miraglia of NRC made a presentation about staff actions in these areas; a copy of his presentation materials are included in Attachment 3.

Project No. 689 Attachments: As stated cc w/ atts: See next page s

Y 4

4 4

1

-e e -g

,e nn.

e,

't

(

i NEILicensingIssues Workshop I

January 12-13,1998 **.* Biscayne Bay Marriott + Miami, FL PROGRAM SUNDAY. J ANUARY 11.1998 4:00 PM 5:30 PM Registration. Sunse ! stand Foyer 7:00 PM - 8:30 PM Welcoming Reception - Bay Front Terrace MONDAY. J ANU ARY 12.1998 - Grand Ballroom. Salons E &F 7:30 A M Registration and Continental Breakfast Tony Pietrangelo, NEl 3:30 Welcome Tom PlunAen, TP&L 8:35 Opening Remarks 8:50 Current Licensing Issues Tony Pietrangelo 9:06 Panet Discussion on 10 CFR 50.59 Doug H' alters, NEl Scott Bauer, APS Steve Bennett Entergy AlPasswater, Union Elec.

10:15 Break 10:30 Panet Discussion on FSAR Updates Russ Bell, NEI Guy Darsnt, Entergr Joe llegner, l'irginia Power Dave Hhitcomb, HPPSS 12:00 Noon Lunch (On your own) 1:30 PM Breakout Session on 10 CFR 50.59 Region 1 - Salons E & F Region II. Hibiscus Island Room Region Ill-Salons A & B Region IV - Salons C & D 3:00 Break 3:30 Dreakout Session on FSAR Updates

e,

- O 5:00 Adjourn TUESDAY. J ANUARY 13.1995 - Grand m.ncoom. Lions E & F -

7:30 AM Coatisestal Breakfast 3:30 Highlights of Breakout Session s Tony Mettsagele, NEI Frank Mireglia, NRC 8:45 NRC Perspective 9:30 Executive Perspective NeveldRey SCE 10:15 Break 10:30 Regulatory Process Issues

- Tony Merrsagele

.9ew Floy4, NEl Current Licensing Basis Potential Changes to 10 CFR 50.59 Design Bases, NEl 97-04 Commitment Management Risk informed Regulatory Framework NRC Assessment Process Enforcement Policy 1i.45 Closing Rtmarks Ralph Reedle, NEl 12:00 Noom Adjourn

-)

q

x

.t.

.,n.--.

..a n

.u.

e i

o LIST OF NRC ATTENDEES AT NEl WORKSHOP ON LICENSING ISSUES HELD IN.

MIAMI, FLORIDA ON JANUARY 12-13,1998 NAME AFFILIATION F. Miraglia Deputy Director, Office of Nuclear Reactor Regulation, NRC F, Akstulewicz Section Chief, Generic lasues :.d Environmental Projects Branch (PGEB),NRR, NRC E. McKenna Senior Reactor Engineer, PGEB, NRC T. Bergman Senior Project Manager,PGEB, NRC 4

't' pR R Eg g 1

O*

A>

4

~

g.

++**+

l lNTEGRATION AND EVALUATION OF RESULTS FROM RECENT LESSONS-LEARNED REVIEWS x

3 January 13,1998 Office of Nuclear Reactor Regulation i

f

o S

.g e

i l

  1. 4 CONCERN 4

L h

1 CONFIGURATION CONTROL 9

t 3

e i,

e CONTRACT i

s

-i I

i L

  • ' r i

i l

L k

I i

i

a 1 '

CONFIGURATION CONTROL CONFORMITY l

  • COGNIZANT - DO YOU KNOW IT?

4 CHANGE - MODS, PROCEDURES j

CONTROL PROCESSES - 50.59/FSAR/50.71e l

CODES /50.55 i

i REGS TECH SPECS i

COMMITMENTS - NEl i

t

, 2,

~

INTEGRATION Regulatory

~

Process

+

Activities 50.59 Underway Process Issues Regulatory Future inspections Integration H

Process

+

l Actions and Reviews Process /

Policy issues Millstone Lessons Learned Other Regulatory Process issues I

l 1

' I i

4 INTEGRATION PROCESS I

  • ldentify NRR CommitmentsAssues j
  • Resolve near-term regulatory problems j

i

  • Establish process for synthesis of issues j

i i

f

  • Establish process for evaluation of options
  • Develop options that target regulatory issues in a cohesive and comprehensive manner O

r s

t COMMISSION PAPER (SECY-97-205)

  • Contains an assessment of public comments on NUREG-1606
  • Discusses progress made on short-term Millstone Lessons-Learned actions
  • Presents options for regulatory improvements
  • Provides a recommendation on how to proceed (Option 5) 2

a e

4 t

i KEY ISSUES F' ROM COMMENTS 1

i i

l l

e Use of 50.59 for degraded and nonconforming conditions j

e Plant restart if a USQ is involved i

i e USQ threshold criteria

- margins and bases for any TS

- probability may be increased

- consequences may be increased l

- malfunction of a different type i

e Definition of a change to the facility l

l l

j

! RULEMAKING ON 10 CFR 50.59 I

e Purpose is to provide stability and clarity

  • Elements being developed for proposed i

rulemaking:

1 i

l 2 revision to USQ threshold criteria

- clarification of definition of margin of safety, including " basis for any technical specification" j

- elimination of term "USQ" t

- clarification of " change to the facility as described" e

i GUIDANCE /RULEMAKING ON SAR CONTENT

  • Staff proposed to develop approach on SAR updating:

l

-- to incorporate changes since initial licensmg J o include a process by which information could be t

eliminated from SAR

- to update more risk-significant information first

- to consider enforcement discretion for full completion

  • Current Status

\\

- NEl Draft guidance on SAR updating submitted;

! understaff review

- Staff developing generic letter for public comment I

!~

RISK-INFORMED FRAMEWORK

  • Increased use of risk-informed regulatory approaches and graded requirements
  • Develop common scope of systems, structures l and components subject to operational rules
  • Requirements for corrective action processes, promptness and closure
  • Staff to provide framework and ANPR to Commission to issue for public comment

~

l l

I;)Il lll!;

l il!

ro s

~

R f

n A

rd o

o S

f e

t i

e a

dd s n l

Y en e

o l

ha vd v

i C

s e na 9

9 i

l I

l L

b 5 ys 5

t a0 nQ 0

O s5 eS t

5 P

er vU o

r o

nf e

f T

os sg l

n ni e

N se ov n

i l

E iv a

v l

M el yo P

e r

cv in w

y E

yt oi e

l ci r

p9 C

i i

v es l

5 e

R ovn f

Peo o0 R

O 6

t si n5 t

9f a

of n

F 9ol o

it e

o N

1 si asn m

r ev uno E

elpe a oi e

l t

b t

vt e

c i

r oma ea c

o r

t ad l

f c xp eos n

i i Oeu Rvd E

l e

,l1lllll ll' lll l

l

~

I OPTION 5 l

(a) GL 91-18/IMC 9900 Guidance on 50.59 role in resolution of degraded or nonconforming j conditions (b>10 CFR 50.59 Rulemaking (c) Examination of enforcement policy for j

10 CFR 50.59 (d) Guidance /rulemaking on SAR updating (e) Development of risk-informed framework to revise existing regulations

  1. 4

_ _..._ - _ -. ~... _ _ _ _ _.

o 1:'

- Nuclear Energy. institute Project No. 68g ec:

Mr. Ralph Beedle Ms. Lynnette Hendedec, Director Senior Vice President Plant Support and Chief Nuclear Omcor Nuclear Energy Instituto Nuclear Energy institute Suite 400 Suite 400 1776 i Street, NW 17761 Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr Alex Marion, Director Programs Nuclear Energy institute Suite 400

1776 i Street, NW Washington, DC 20C06-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Instituto Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. Nicholas'J. Liparuto, Manager Nuclear Safety and Regulatory Acuvities Nucicar ano Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director
Operations

. Nuclear Energy institute

.. Suite 400 1776 i Street, NW Washington, DC 20006-3708 1

.,.4

January 22. 1998 MEMORANDUM TO: Thomas H. Essig. Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management, NRR FROM:

Eileen M. McKenna, Senior Reactor Engineer Original Signed By:-

Generic issues and Environmental Projects Branch Division of Peactor Program Management, NRR

SUBJECT:

SUMMARY

OF WORKSHOP HELD ON JANUARY 12-13,1998, BY THE NUCLEAR ENERGY INSTITUTE (NEl) ON LICENSING ISSUES Members of the NRC staff attended a workshop sponsored by the Nuclear Energy Institute concerning NEl initiatives on development of guidance documents for various licensing issues, including implemention of the 10 CFR 50.59 process, and updating of safety analysis reports in accordance with 10 CFR 50.71(e). The workshop was open to the public. Attachment 1 is the agenda for the workshop. A list of NRC attendees are provided as Attachment 2; about two hundred nuclear industry representatives were also in attendance.

During the workshop, Mr. Frank Miraglia of NRC made a presentation about staff actions in these areas; a copy of his presentation materials are included in Attachment 3.

Project No. 689 Attachments: As stated cc w/ atts: See next page DISTRIBUTION w/ attachments (Hard coovt PUBLIC' Docket PGEB r/f SMagruder EMcKenna OGC ACRS E-Mail: SCollint-Niraglia BSheron - RZimmerman JRoe/DMatthews GTracy, OEDO Document Name: g:\\emm\\mtsum11d OFC PGEB b SC:PGF[h (A)C:PGEB NAME EMcKenre.

FAksfute\\c TEssig h DATE 1 6/98 1/N/98 1/2h8 OFFICIAL RECORD COPY

~jjg i % 'd W

.G.ff

o terug r

y-t UNITED STATES j

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 3066H001

's.,,,,,,/

January 22, 1998 MEMORANDUM TO: Thomas H. Essig, Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management, NRR Eileen M. McKenna, Senior Reactor Engineer h /)[g FROM:

Generic issues and Environmental Projects Branch Division of Reactor Program Management, NRR

SUBJECT:

SUMMARY

OF WORKSHOP HELD ON JANUARY 12-13,1998, BY THE NUCLEAR ENERGY INSTITUTE (NEI) ON LICENSING ISSUES Members of the NRC staff attended a workshop sponsored by the Nuclear Energy Institute concerning NEl initiatives on development of guidance documents for various licensing issues, including implemention of the 10 CFR 50.59 process, and updating of safety analysis reports in accordance with 10 CFR 50.71(e). The workshop was open to the public. Attachment 1 is the agenda for the workshop. A list of NRC attendees are provided as Attachment 2; about two hundred nuclear industry representatives were also in attendance.

During the workshop, Mr. Frank Miraglia of NRC made a presentation about staff actions in these areas; a copy of his presentation materials are included in Attachment 3.

Project No. 689 Attachments: As stated cc w/ atts: See next page d

l NEILicensingIssues Workshop I

January 12-13,1998 + Biscayne Bay Marriott + Miami, FL

~

PROGRAM SUNDAY. JANUARY 11.1998 4:00 PM 5:30 PM Registration - Sunset !sland Foyer 7:00 PM 8:30 PM Welcoming Reception Bay Front Terrace htOND AY. J ANU ARY 12,1998 - Grand Ballroom. Salons E & F 7:30 A M Registration snd Continental Breakfast Tony Pietrangelo, NEl 8:30 Welcome Tom PlunAert, FP&L 8:35 Opening Remarks 8:50 Current Licensit.d ssues Tony Pietrangelo i

9:00 Panel Discussion on 10 CFR 50.59 Doug H' alters, NEl Scott Bauer, APS Steve Bennett, Entergy AlPasswater, Union Elec.

10:15 Break 10:30 Panel Discussion on FS AR Updates Russ Bell, NEl Guy Davant, Entergy Joe llegner, Virginia Power Dave Hhitcomb, HPPSS 12:00 Noon Lunch (On your own) 1:30 PM Breakout Session on 10 CFR 50.59 Region 1 - Salons E & F Region II-Hibiscus Island Room Region 111 - Salons A & B Region IV - Salons C & D 3:00 Break 3:30 Breakout Session on FSAR Updates

e' 5:00 Adjourn TUESD AY. J ANUARY 13.1998 - Grand Ballroom. Salons E & F 7:30 AM ContinentalBreakfast 8:30 Highlights of Breskout Sessions Tony Pierr."agela, NE1

.8:45 NRC Perspective frank Miraglia, NRC 9:30 Executive Perspective Harold Ray, SCE 10:15 Break 10:30 Regulatory Process issues Tony Pierrengelo Sten iloyd, NE!

Current Licensing Basis Potential Changes to 10 CFR 50.59 Design Bases, NEl 97-04 Commliment Managemest Ilisk Informed Regulatory Framework NRC Assessment Process Enforcement Policy 11:45 Closing Remarks R e/p h Reedle, N EI -

12:00 Noon Adjoura

LIST OF NRC ATTENDEES AT NEl WORKSHOP ON LICENSING ISSUES HELD IN MIAMl, FLORIDA ON JANUARY 1213,1998 NAME AFFILIATION F. Miraglia Deputy Director, Office of Nuclear Reactor Regulation, NRC F. Akstulewicz Section Chief, Generic issues and Environmental Projects Branch (PGEB),NRR, NRC E. McKenna Senior Reactor Engineer, PGEB, NRC T. Bergman Senior Project Manager,PGEB, NRC

l-i ga "a u,<>

v

  1. o e

1 i

n, d

,f i

g,**D j

  • ++

l INTEGRATION AND EVALUATION i

l OF RESULTS FROM RECENT i

LESSONS-LEARNED REVIEWS x

O i

il 1

January 13,1998 Office of Nuclear Reactor Regulation 1

1

(

1 CONCERN 1

f CONFIGURATION CONTROL i

i, 3

CONTRACT k

i 1

l i

l

~

1 I.

i v

CONFIGURATION CONTROL l

t CONFORMITY l

i L

COGNIZANT - DO YOU KNOW IT?

CHANGE - MODS, PROCEDURES l

  • CONTROL PROCESSES - 50.59/FSAR/50.71e l

t CODES /50.55 l

i REGS f

i TECH SPECS i

COMMITMENTS - NEl i

i l

l

INTEGRATION

)

Regulatory '

l Process l

l Activities U%

50.59 Process n

Issues l

InspNtions Integrat ReguWory Future es

+

and Reviews Process Actions Policy issues n

r a

Millstone t

Lessons Learned l

i j

Other Regulatory Processissues 1

i i

i l

l

,l

I ll!

l1 s

e s

u r

s n

s e e

o s n i

i s.

u t

S m

s p

yn r

a S

e s

o om i

l f

t E

s b

f o

a e e

o o

l n

uv C

u r

s i

s p

o gs i

O s

y e

a r

s t

en i

A r

e R

s o

h u

teh t

t t

l P

n a

n a

gre y

v r

e lu s

e ap N

m g

t m

r r

O t

e o

o a o t

i r

m f

f hc ITA m

m s

s t

d r

s s

sn o

e e

e na

~

R C

t-c c

o r

o o

e G

R a

r r

t v

i E

R e

p p

pios T

N n

h h

e e

s s

ph N

y v

oo i

i l

l f

I t

o b

b ec i

l l

n s

a a

v a e

e s

s e

t t

n d

R E

E.

Di I

li !

il!

!i!:

l;!iIi,Ii l it!

ijIlllI!i 1

ll e

)

n n

5 o

o d

t s

e 0

s s

t e

s n

c l

2 t

l e

o n

i 7-l W

e 1

m rp 9

m m

e r

v o

Y-m e

o t

o t

r C

c t-p w

E c

o m

o r

h i

i h

l S

b s

y n

(

u r

o p

n o

R e

t n

f a

o E

o e

u t

l i

ds t

P n

a n g

a o

e d

A e

mi r

n P

m t

s s c r

e N

s s a o

m f

e ed s

m r

O s

ge n

o n

s or o

c I

a S

6 r

i a

t e

n0 pe p

r S

a6 sL o

a)

I s1 e-n-

s s s

s5 M

t en iG s n n

d M

aE u o e

io O

nR c s s

vit t

oU s s e

op e

r r

C CN DL P

P (O i

r I!!!'

i:

!l i li; l:

i<

j !!!i t!

ll:i ji; S

T d

y N

e t

i l

s e c

E d

S i

e T d ap a

M d

v e ey r

f ys ct e

l n

o na nt h

M a

s v

aein O

dn n

r e

t c er o

r i

eo o nb e

t C

di s

f f

ai a

iyi e

t i

f s

M rd Q

r i

e ebead g

gn S

t s

ma n

O eo a

dc U

r ay i

c b

a sf h

R eo c

r g

a d

d mc F

o n f

n a

o nyn o

f f

i l

i at ei o

t S

9 m

r h

ut i

E 5

r a

s si l

c f

s e

nb qn n

0 o

t ae u

o U

5n e

h gb sf t

r i

i r

f o

t r

S o c t

ao nl i

a n

r o

n Q

mpcmi S

en f

a S

e so I

l Y

Un P

U D

E K

l ji i

i:! l:4l l;1jl l!

,ll!;l,!!!ilijl<{

"n o

y, i t

9 a

t 5

ec i

f f ai s

0 y

s c a

5 t

d e

f r

e op y

i t

R a

s s

i l

F c

o nl l

i p

aia c

g i

c a

C d

o r

r i

f e

a n e

n r

t 0

a p

mh h

ir 1

y r

c c

t t

o f

f d

oe" o

i t

Qt N

l i

l b

d onyS e

O a

e h

on U

g t

p sia" n

t s

o einr a

G e

e h

l r

omh i

f N

d v

t ef r

K o

d Q ds e "c iv e

I i

f st f

r S

oaf o

A p

g o

U nb n

M o

n n o" o o "g i i

t e:

o id t

i E

s bg t

t e L

sin n

ant ab a

i ci o ciid nir e

t k i

U s

n a siuif f

mic o

e rs i

rl R

p m mv aci a e r

e el nl l

u el r

ci e

cd u

l P

E r;l l

l!

!i i

I

!1

!l

~

7 GUIDANCE /RULEMAKING i

l ON SAR CONTENT l

  • Staff proposed to develop approach on SAR updating:

- to incorporate changes since initial licensing

- to include a process by which information could be eliminated from SAR

- to update more risk-significant information first l

to consider enforcement discretion for full completion

  • Current Status l

- NEl Draft guidance on SAR updating submitted; i

' understaff review l

l

- Staff developing generic letter for public comment i

I

t I

RISK-INFORMED FRAMEWORK

  • Increased use of risk-informed regulatory approaches and graded requirements
  • Develop common scope of systems, structures and components subject to operational rules
  • Requirements for corrective action processes, promptness and closure
  • Staff to provide framework and ANPR to Commission to issue for public comment I

Iljlll ro s

^

R f

n A

rd o

o S

f e

t i

e a

dd s n l

Y en e

o l

ha v: d v

i C

s e na 9

i9 l

I l

L b 5 ys 5

t a0 rQ 0

O s5 eS i

t 5

P er vU o

r o

nf e

f T

os sg l

nin e

N se ov n

i l E

v v i

a l

M el yo P

e r

cv y

n w

i E

yt oi e

l ci r

p9 C

i i

v es l

5 e

R ovn f

Peo o0 R

O 6

t si n5 t

F 9f a

of n

o 9ol it e

o N

1 si asn m

r ev uno E

bpe a oi e

l el t

t vtie c

r oma el c

o r

a ad f

tc xp eos n

i i Oeu Rvd E

lll lll!

l

i l

1

\\

OPTION 5 l

i (a) GL 91-18/IMC 9900 Guidance on 50.59 role in resolution of degraded or nonconforming i

~

conditions

[

(b)10 CFR 50.59 Rulemaking i

(c) Examination of enforcement policy for 10 CFR 50.59 1

I p

l (d) Guidance /rulemaking on SAR updating l

l l

(e) Development of risk-informed framework t

to revise existing regulations

.I

o i

j s

l Nuclear Energy institute -

Project No. 68g

(

-i oc:

Mr. Ralph Boedle Ms. Lynnette Hendricks, Drector

}

Senior Vice President Plant Support and Chief Nuclear Omoor Nuclear Energy institute Nuclear Energy institute Sune 400 i

Sulk 400 1776 i Street, NW 1776 i Street, NW Washington, DC 20006 3706 Washington, DC 20006 3708 n

Mr. Alex Marion, Director Programs Nucieer Enerpy fr1stitule Suite 400 l

1776 i Street, NW Washington, DC 20006 3708 a

i Mr. David Modeon, Director

)

Engineering Nuclear Energy institute Suite 400 1776 i Street, NW Washington, DC 20006 3708 Mr. Anthony Pietrangelo, Director Lloonsing

~

- Nuclear Energy Institute Suite 400 1776 l Street, NW i

Washington, DC 20006-3700 Mr. Nicholas J. Liparuto, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Division c

Westinghouse Electric Corporation i

L

-- P.O.' Box 355 Pittsburgh, Pennsylvania 15230 -

Mr. Jim Davis, Director.

Operations m

Nuclear Energy institute :

Suite 400 1776 i Street, NW Washington, DC 20006-3708:

e i

d.. u.

J

...-.. -. u..

... _ - _ ~. _. -.,.... _. _.... _.. _... _ _ -., _. - _ _, - -. _,, -, _.,..

-