G,(A Sar gorm B::Lundy'*
/
me 317 ?M6018 January 23,1998 Project No. 9583100 Docket No. 50-423 Northeast Nuclear Energy Cong.my Millstone Nuclear Power Station, Unit No. 3 Independent Corrective Action Verification Program United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 I have enclosed the following thiny nine (39) discrepancy reports (DRs) identified during our review activities for the ICAVP. These DRs are being distributed in accordance with the Communications Protocol, PI MP3-01, DR No. DR MP3 0333 DR No. DR-MP3-0963 DR No, DR MP3 0645 DR No DR MP3-09C4 DR No DR-MP3 0885 DR No. DR-MP3-0965 DR No. DR MP3 0901 DR No. DR MP3-0966 DR No. DR MP3-0905 DR No DR MP3-0967 DR No. DR-Mp3-0915 DR No. DR-MP3-0968 DR No. DR-MP3-0916 DR No. DR MP3-0969 DR No, DR MP3 0920 DR No. DR MP3-0973 DR No. DR-MP3-0921 DR No. DR-MP3-0974 DR No. DR MP3 0923 DR No. DR MP3-0975 g\\
DR No. DR MP3-0924 DR No. DR-MP3-0976 DR No. DR MP3-0931 DR No DR MP3-0977 DR No DR-MP3-0951 DR No. DR MP3 0979
\\
DR No. DR MP3-0952 DR No. DR MP3 0980 i
DR No. DR-MP3 0953 DR No. DR-MP3-0981 DR No. DR MP3-0954 DR No DR MP3-0982 DRNo DR MP3-0956 DR No. DR-MP3-0983 DR No. DR MP3-0957 DR No. DR MP3-0984 DR No, DR MP3-0959 DR No DR-MP3-0985 DR No. DR-MP3-0986 9sjt2 joy ge g
.lllll l!lll1U1llIlllli.I 55 East MonrDe Street
- Chicago, IL 60603 5780 f.tSA
- 312 269-2000 y
e.
r
-..e
,.m
. - _ _. _. = _ _ _ - _. _ _ _. _ _ _ -
l
. - t United States Nuclear Regulatory Commission January 23,1998 Document Control Desk Proht No. 9583100 Page 2 i
I have also enclosed the following three (3) DRs for which the NU resolutions have been reviewed and accepted by S&L.
DR No. DR-MP3-0029 DR No. DR-MP3-0115 DR No. DR MP3 0300 I have also enclosed the two (2) ITRs for wNch the NU resolutions have been reviewed but not accepted. S&L comments on these resolutions have been provided.
DR No. DR-MP3 0315 DR No. DR-MP3 0589 Please direct any questions te me at (312) 269-6078.
Yours very truly, D.~Ji' y
D. K. SMpfer Vice President and ICAVP MaAigar DKS:spr Enclosures Copies:
L E. Imbro (1/l) Deputy Director,1CAVP Oversight
. T. Coccannon (1/l) Nuclear Energy Advisory Council J. ifougere (111) NU mwv_c=ain 4=
r s.-..-
1
.e
.1;
-f.
-. +.
.~...
.u..,
,.w.,
a.
~,,,..
A r
4 Northeast Utilities ICAVP DR No. DR-MP3 4333 Millstone unit.3 Discrepancy Repoft Moview Group: system DR VALID
. Paview Element: System Design Diecipline: Electrical Desig" Om E.; :y Type: Drawing gg SysterWProcese: N/A NRu signincance level: 3 Date faxed to NU:
Date Putnished: 1/2596 DeecroPeacy: Schematic and wiring drawing discrepancies for SWP, RSS, &
~
QSS swgr pump breakers.
DeecrWlon: Discrepancies between the pump breaker schematic and wiring drawings are noted below:
y
- 1) In the trip circuit of the Service Water Pump (3SWP*P1B) breaker, the schenutic diagram (ESK 5CK Rev.16) indicates a connection between terminal point BB 12 and point 67 on contact 67 68 of handswitch 52S 3SWP*P1B. T'1e corresponding wiring diagram 25212-39010 sht. 498 Rev. F, at terminal point BB 12, does not indicate this connection.
- 2) Schematic diagr%m (ESK SCN Rev.13) for 3RSS*P1 A indicates an electrical connection between terminal point AA 3 and handswitch 43-3RSS*P1 A (contact 5), in the closing circuit of the breaker. The corresponding wiring diagram (25212 39010 sht. 449 Rev. F) does not indicate a connection between these 4
two points.
- 3) The closing circuit of the RSS pump breaker (3RSS*PI A -
schematic diagram ESK 5CN Rev.13) Indicates a series
- permissive
- using handswitch 43-3RSS*P1 A (contset 10) and auxiliary relay 1X-3RSS*P1 A (contact 17). This portion of the schematic diagram doec not match the corresponding wiring diagram 25212 39010 sht. 449 Rev. F. As an example, this wiring diagram Indicates that both sides of contact 10 (43 3RSS*P1 A) are both connected to point 7 of auxiliary relay 1X-3RSS*Pi A.
- 4) Schematic diagram (ESK-5DH Rev.11) C 3S*P3B indicates a connection between handswitch (n.,QSS*P38) contact point 3C and handswitch (43-3QSS*P38) contact 13C.
The switchgear intemal wiring diagram 39010.sht. 484 Rev. E does not Indicate a connection between these two points. In addition, schematic diagram ESK-5DH Rev.11 Indicates a seal-in contact (12) on the reset coil of relay 86E. The switchgear inieman wiring diagram 39010 sht. 484 does not indicate a seal-in contact.
- 5) Schematic disgram ESK-6ALG Rev. 7 (3SWP*P3A &.
3SWP'P38) indicates the use of a General Electric CR120BL relay, which contains an " operate & reset
- coil. The corresponding wiring diagrams refers to wiring diagram EE-9JS Rev. 2, figure 11H, for the wiring of these relays (3 3SWP*P3A
- & 3-3SWP*P38). Figure 11H does not contain these types of relays.
Review Prhied 1/2311611:3tL26 AM Pege 1 or 2
('
i f
Northeast Utilities ICAVP DR No. DR MP34333 Millstone Unit 3 Discrepancy Report ved invenid Needed Date initletor: Morton, R.
Q Q
1/16S6 Q
1/16S6 VT Leed: Neri, Anthony A n
VT Mort Schophr, Don K O
O O
1'1SS8 MC Chmn: Singh, Anand K Q
1/2246 Date:
INVALID:
I Date:
RESOLUTION:
Previously Montefied by NUF Q vos @ No Non Diecrepent Condition?U Yes @ No R mison PendinetO va @ No Ru@thunroehod?O va @ No Review
'" *1'a =* Not Acceptable Needed Date g
VT Lead: Neri, Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K g
Date:
SL Conenents:
i a
i Printed 1/234611:E37 AM Page 2 of 2
l i
Northeast Utilities -
lCAVP DR No. DR-MP3 0645 Millstone Unit 3 Discrepancy Report Review Group: System DM VALID Review Element: System Doo6gn pg Diecipline: EW Deegn O va Discrepency Type: Calculaten gg SystemProceae: N/A NRC SigntAceewe level:3 Date 7 Axed to NU:
Date PutWehed: 1/2596 D6ecropency: Cable capacitive effects are not addressed (Calculation 02 LOE.
078E3)
D*ecription: This calculation was prepared to establish the maximum permitted cable lengths for use in iaotor control circuits. The calculation determines the maximum permitted cable lengths based only upon voltage drop.
Small control relays should also be reviewed because of their small holding current requirements to determine whether the capacfilve current contained in lengthy, multi-conductor cables may be a problem by preventing relay dropout after the circuit is interruptad. Mutual capacitance should be addressed in the calculation to determine the maximum allowed cable lengths.
Per CCN 2 of the calculation, the maximum allowable cable length for the Size 1 starterwhich has GE CR120B relays rated at 15 Holding VA is 5814 feet fur a #10 AWG cable.
For this application, S&L's standard would allow a maximum cable length (cable length being equal to 1/2 of the circuit length) of approximately 2400 feet (41% of the length allowed by NU).
Review Valid invalid Needed Date initletor: Crockett, Ed O
O O
VS8 VT Lead: Nort, Anthony A 8
O O
l'VS8 VT Mgr: Sctmpfer Don K G
O O
1'1 eros IRC Chmn: Singh, Anand K g
Q O
1/22,98 Date:
INVAllD:
Date:
RESOLUTION:
Previously Idemified by NU? O yes @ No Non Discrepant Condition?O vos @ No ~
~
ResolutionPending?O vos @ No ResolutionUntosolved?O ves @ No Review Acceptable Not Acceptable Needed Date VT Lead: Neri, Antnony A VT Men Schopfer, Don K IRC Chmn: Singh, Anand K O
O Date:
SL Commente:
Printed 1123r9611:36:36 (JA Page 1 of 1
i Northeast Utilities ICAVP DR No. DR MP3 0886 Mitistone unM 3 Discrepancy Report Review occup: Opershone & Maintenence and Toshng DR VAUD Review Element: Martenance Procedure Diecipl6ne:1 A C Design O Yee D6ecrepenc/ Type: 0 & M & T imp 6ementation g
Systemerecese: SWP NRC Sign 4AceAo level: 3 Date faxed to NU:
Date Published: if259e
~
D6ecrepency: Service water Stralner timers not in calibration program
==
Description:==
Plant Design Change Request (PDCR) # MP3-92-013 replaced four time delay relays in the Service Water Pump Strainers. The PDCR was identified as a AQ, Cat. I activity and that the new time delay relays were required to be qualified as class 1E devices. Further, the PDCR documented the requirement to up date procedure PT 31459A, MP3 Timing Device Calibration s
Program. Revision 2 CH 2 of this procedure which has an effective date of October 1,1997 does not include the replaced time delay relays.
NU's Quality Assurance Program (NUQAP) states that ' Periodic c9libration and adjustment of measuring rN test equipment is performed and controlled to assure accuracy is maintained within limits necesury to verify and control to assure accuracy is maintained within limits necessary to verify that design and s
operating condition requirements have been met. The ope ating requirements for these relays is identified in the PDCR as providing a safe and reliable means of allowing the system to remain in its automatic mode to provide automatic gross filtering of the service water system cooling water.
No documentation was provided that would verify the service water pump strainer timers were included in the Mill *one Unit 3 timini device calibration program or weie calibrated on a scheduled frequency.
The PMMS LOCAL ID for the timers in quer;1 ion are:
TDTSM105 TDU5M119 TDT 5M108 TDUSM120 Rev6ew vend invasid Needed Date init6etor: spear, R.
G O
O
/SS8 VT Leed: Bees, Ken O
O O
5/S/S8 VT Mgr: schop%r, Don K G
O O
1"SS8 IRC Chmn: singh. Anand K G
O O
ti22/se Dete:
INVAUo:
Date:
RESOLUTION' Previously identleed by NU7 O Yes (#) No Non "F
,-1 Condition?O Vee
(*) No r
Printed 1/23Se 11:37.41 AM Page 1 of 2
l l
Northear + Utilities ICAVP DR No. DR MP34445
)
Millston. Unit 3 Discrepancy Report ResolutionPendeg?O Yes T feo Resolutionunresolved?O Yes @ No
- Review
'"Y am Not Accepteble Needed Date gg g VT Lead: Bees, Ken VT Mgr: Schopfer, Don K tRC Chmn: Singh, Anand K noi.:
st Comnents:
{
l l
l l
Printed 1/2MI611:37A6 AM Pogs 2 of 2 i
i
Northeast Utilities ICAVP DR No. DR MP3 0901 Ministone unit 3 Discrepancy Report nevi oroup: conr,ur on DavAuD Revlow Element: System instemetson Diecipline: I & C Dwen O v.
06- ; ny Type:Irwan=han implementehon g
SysterrWProcese: DGX NRC SWReence level: 4 Date faxed to NU:
Date Published.1/2sS6 Diecrepency: Inadequate labeling of Instruments Ducription: Millstone Station Procedure OA 9 Revision 1 requires labeling for all plant components. Contrary to this requirement, the following labeling discrepancies were discover 6d during system walkdowns:
- 1. The following instruments are not labeled in the field 3EGS*TS30 3EGS*TS30B 3EGS-TS28B 3EGS-TC31B 3EGD-TE22B1 2
3 EGO-TE21B1 3EGD-TE22B2 3EGS-PS2781 3EGS-PS27B2 3EGD-TE26A1 3EGD-TE26B1 3EGD-TE26B2 3CES-RK12 08
- 2. Drawings 12179-ESK-4J-S Rev 11 and 12179-ESK-4J-6 Rev 15 show that the level indicators for the Emergency Generator Day Tank should have a scale of 0 - 550 gals. Levelindicators 3EGF Ll29A1,3EGF LI-29A2,3EGF-Ll2981, and 3EGF-Ll2982 do not meet this requirement, The scales presently installed on the referenced indicators show a range of 0 - 530 gals, they are hand written not machine printed, and have red printing on white scale plates, not the required black printing on white scales.
Rev6ew Valid invalid NeedM Date inr.6etor: Server, T. L 8
O O
$'13S8 VT Lead: Nort, Anthony A Q
Q Q
1/1446 VT Mer: Schopfer, Don K G
O O
1'1S'S8 IRC Chmn: singh, Anand K G
O O
ii22s6 Date:
INVALID:
Det9:
REsot.UTloN:
Previounty identmed by NU7 Q Yes @ No Non D6ecrepent Condition?Q Yes @ No n munoneeneno?O Y=
@ No ReeduuonUnroomved70 va @ No
- n. view Printed 1/23S611:36.30 AM PeGe 1 o' 2
1 o.
l Northeast Utilities lCAVP DR No. DR-MP34901 Ministone Unit 2 Dtacrepancy Report AcceptaWe Not AcceptaWe Needed Date O
O VT Land: Nort, Anthony A 0
0 0
vT por: senope.r.oon x IRC Chmn: Singh, Anand K Dele:
SL Comments:
(
Printed 1/2MI6 It3tk36 AM Page 2 of 2
Northeast Utilities ICAVP DR No. DR-MP3 0905 Millstone Unit 3 Discrepancy Report Review Group: ConAguraten DR VALID Review Element: Systeminatelletam Diecipline: 1 & C Design -
Ow Descrepency Type: Instalisten Implementation
@ No Systemerocess: HVX NRC SignWicence level: 4 Date faxed to NU:
Date Published. If2596 Descr*Pency: Component Labeling not in accordance with requirements.
Desertption: Procedure OA 9 Revision 1 requires the labeling of all plant components. Contrary to these requirements, the following discrepancies were observed during system walkdowns:
- 1. Recorders 3HVR*RR10A,3HVR*RR10B and 3HVR*RR16A located in panel 3RMS*RAK1 A and Recorders 3HVR*RR19A, 3HVR*RR198 and 3HVR*RR1SB located in panel 3RMS*RAK1B do not have an ide'itification tag showing this Numbers. These instruments have vendor identifications tag numbers RIC 1&4, RIC 2&5, and RIC 3&6, however, the vendor identification tag numbers called for on drawing 2474.030-C?.' 193 Rev F is REC 1&4, REC 2&S, and REC 3&6.
- 2. Based on design documents, the instruments listed below are in panel 3CES*lPNLl20 at the indicated locations. There is no nest identification and/or card identification as shown on drawing 2472.710 392-519 Rev C in the panel.
3HVP*TY29A2, Nest 1, Slot 3 3HVP*TY29A4, Nest 1, Slot 5 3HVP*TY29AS, Nest 1, Slot 6 3HVP*TY29A7, Nest 2, Slot 9 3HVP*TY29A8, Nest 2, Slot 10 3HVR*TY45A1, Nest 2, Slot 2 3HVR*TY45A10, Nest 1, Slot 9 3HVR*TY45A12, Nest 3, Slot 1 3HVR*TY45A2, Ne t 2, Glot 4 3HVR*TY45A6, Nest 2, Slot 8 3HVR*TY45A7, Nest 1, Slot 6 3HVR*PY104A1, Nest 2, Slot 6 3HVR*PY104A2, Nest 3, Slot 1 3HVR*TY29A6, Nest 1, Slot 7 3HVR*TY45A, Nest 2, Slot 3 3HVR*TS45A1 3HVR*TG45A2
- 3. The instruments listed below are located in panel 3CES*lPNLl21 and there is no nest identification and/or card identification as represented on drawing 2472.710-392-520 Rev D:
3HVR*PY104B2, Nest 1, Slot 10 3HVR*TC458, Nest 2, Slot 3 3HVR*TS45B1, Nest 4, Slot 1 3HVR*TS45B2, Nest 4, Slot 1
, cw, eu.u,o.,v u o.,, u.w,w
~
wi i i i i ww-s me
....m
Northeast Utilities ICAVP DR No, DR-MP3-0905 Millstone Unit 3 Discrepancy Report 3HVR*PY104B1, Nest 2, Slot 1 3HVR*TY45B10, Nest 2 Slot 7 3HVR*TY45811, Nest 1, Slot 9 3HVR*TY45812, Nest 1, Slot 10 3HVR*TY45813, Nest 3 Slot 7 3HVR*TY45B2, Nest 2, Slot 4 3HVR*TY4583, Nest 2, Slot 6 3HVR*1Y4584, Nest 2, Slot 5 3HVR"TY4585, Nest 2, Slot 6 3HVR*TY4586 Nest 2, Slot 8 3HVR*TY4587, Nest 2, Slot 6 3HVR*TY45B8, Ne'd 2 Slot 5 3HVP*TC298, Nest 1, Slot 2 3HVP*TY29B1, Nest 1, Slot 1 3HVP*TY2982, Nest 1, Slot 3 3HVP*TY2983, Nast 1, Slot 4 3HVP*TY2984, Nest 1, Slot 5 3HVP*TY29BS, Nest 1, Slot 6 3HVP'TY2986, Nest 1, Slot 7 3HVP*TY2987, Ned 2, Slot 9 -
3HVP*TY29B8, Nest 2, Slot 10 In addition, instrument cards marked 3HVR*PDS208A and 3HVP*TY45A13 were observed in nest 3, slot 3 and nest 1 slot 10 respectively. PDS208A was to be discontinued per PDCR 92-103 and TY45A13 is an *A* train component. These instruments are not shown in these location on the referenced drawing.
- 4. Instruments 3HVR TC185A and 3HVR TC1858 are not identified correctly in the field.
S. Procedure OA 9, paragraph 1.14 provides the specific i
instructions forlabeling of abandon equipment, instruments 3HVR*FS27A,3HVR*PDT208A, and 3HVR*PDT208B have been abandoned in place and they do not have the required labelir g.
- 6. The following differences between the installed components that the requirement of the referenced design documents were noted during system walkdowns for field installed instruments:
3HVR TIS 109A,1098,109C, and 110. Vendor drawing 1179-2472.900-609-249, Rev. B, Indicates that an expanded metal (16 gauge) protective screen is to be mounted over the sensing bulb and that the sensing bulb is to be mounted using a % inch conduit clamp, with insulating tape sleeve, and in an upward direction. The protective screen could not be found and the instrument is not as described on the vendor drawin0s.
Review vend
- k. valid Needed Deee initiator: senw, T. L O
O O
in2/98 W Leed: Neri, Anthony A O
O O
id4S8 W Mgr: schapter, Don K G
O O
inse9e IRC Chmn: singh, Anand K O
O O
IfZtSe Date:
INVAUO:
l Prtnied 112881130-42 AM PeGe 2 of 3 w-
Northeast Utilities ICAVP DR No. DR-MP3 0906 MIIIstone Unit 3 Discrepancy Report Date:
RtsOLimON.
Prev 60ush identined by NUF Q Yes @ No NonDiscrepe1Condetion?O Yes (e) No lonPending70 vs. @ No sie.osotionunewfo v.
@w Review Acc@bh Not Acceptable Needed Date initletor: (none)
O O
O VT Lead: Nort, Antfany A 0
0 e
vi uor: sc w.<, con x O
8 ftC Chn: S@, Anand K O
O O
m.
st Coenments:
l l
1 1
emeotrasettm eau Page 3 of 3
Northeast Utilities ICAVP DR No. DR-MP3-0916 Millstone Unit 3 Discrepancy Report -
Review Grog: Progrommetic DR VALID Review Element: Corredhe Action Procese g
Diecipline: Mechanical Design O va N ;- :y Type: Correcthe Achon g
SysterWProcese: SWP NRC signWicence levet: 4 Date faxed to NU:
Date Putdehed: 1/ 598 Diecrepancy: No Corrective Acf n Plan included in ACR D*ecription: ACR M3-06-0721 does not conform to the requirements of the Corrective Action procedure, i.e., no corrective action plan is included which describes the actions being taken to correct the identified deficiency and t:fose the ACR. Additionally on Form RP 4-4, there is a statement saying 'Close Per MRT Comments." There are no MRT comments included in the ACR, Review Valid invalid Needed Date inittstor: Wrone, S. P.
g Q
1/21/9e VT Lead: Ryan, Thomse J g
Q 1/21/9e VT Mgr: Schopfer, Don K Q
O O
ii22/se IRC Chmn: Sin 0h. Anand K g
Q 1/22Se Date:
INVALID:
Date:
RESOLUTION:
Previously identMied by NU? O Ye0 @ No NonD6ecrepentcondition?U vee @ No R oiono P.nmaa?O vee @ No Res&uon Unroesed?O vos @ No Review Acceptable Not Acceptable Needed Date VT Leed: Ryan, Thomse J VT Mgr: Schopfer, Don K 1RC Chmn: Singh, Anand K Date:
SL Consnente:
i i
i i
Printed 1/234811:40:30 AM Page 1 of 1 l
l l
f Northeast Utilities ICAVP DR No. DR-MP3 4916 Miiiston. Unit 3 Discrepancy Report Review o,.up: nw.=
DR vAuD Review Elemme.i: Corrth Acten Process Diecipi,ne: Other O v.
W --
ny Type: Cerrectwo Action gg 8,-.C: =^ QGS NRC SWm level: 4 Date faxed to NU:
Date Putsehed: 1as/96 D e ropency: UIR Inappropriately identified as 'Stait-up Not Required
- and improperly cicsed Deecription: UIR 776 is incorrectly identified as not start-up requirtsd. This UIR states dat pump 3QSS*P3A was run dead headed for about 10 minutes (with indications of some increase in temperature, and that the pump had not been evaluated for potential damage.
The corrective action for the UIR was the init '3n of an AR for the system engineer to determine if additional action /surved!ance is required for the pump. The UIR was closed based on this AR, Closure of the UlR based on the identified corrective action is inadequate due to potential operability problems. The " potential damage evaluation" should be required PRIOR to startup.
Additionally, an ACR should have been initiated, tather than ar.
AR, as was done in a similar situation for pump 3Q.cS*P1 A tinder UiR 744.
Review Valid irrielid Needed Date initiator: Wrone, S. P.
8 O
O ta1/9e VT Leed: Ryan, Thomes J G
O O
inties VT Mgr: Schopfer, D-K G
O O
1a2tse IRC Chmn: Singh, Anand K Q
O Q
1a2/96 Date:
INVALID:
Date:
REs0LUTION:
Previouety identiAed by NU? Q vos @ No Non Discrapent Condstion?O vos t@ No R awson P.ndingtO vos @ No Reeduuonuareedved70 v.e
@ No R.vi.w A~Y am Not AccYa* Weeded Date O
O O
VT Leed: Ryan, Thomme J b
VT Mgt: Schopfer, Don K IRC Chmn: Singh, Anand A Date:
SL Commente:
Printed 1/23/9e 11:41:13 AM Page 1 of 1
Northeast Utilities ICAV[.
DR No. DR MP3-0920 Millstone Unk 3 Discrepancy Report Review Group: Confqursten DR VAUD Rev6ew Elemord: system instellation g
06ecipline: Electncel Design O va 06ecrepency Type: Drovnng
@ No systerWProcess: HVX NRC signiecenca level: 4 Date faxed to NU:
Date Published: 1/2s/9s
- D6screpancy: Electrical Physical Drawing Differences from installed conditions Deecription: The following anomalies between the electrical physical drawings, the Cable and Raceway Control Program and the field conditions.
- 1. The cable and raceway program (TSO2) indicates that the cables to 3HVR AE195A and 1958 (3FPWANX275 and 3FPWBNX275) are routed to Junction boxes 3FPW-JB06A and B respectively where they are connected to the vender supplied detector wire / block. Connection Diagram EE-18R Rev. 4 shows these cables routed to these boxes. Tha Conduit arrangement drawing, EE-48J Rev.11, shows the conduits contair:ing these cables (3CX937NE4 and NES) terminating at these junction boxes. Contrary to these design documents, the conduits are routed directly to and terminate in the filter units. 3HVR*FLT-1 A l
and B.
- 2. Conduit arrangement drawing, EE-48J Rev.11, shows the l
conduits 3CX128NB4 and NB5 containing the cables to 3HVR-AE193A and 1938 located within filter units 3HVR*FLT-3A and B terminating at junction boxes 3FPW-JB07A and B. Contrary to these design docunients, the conduits are routed directly to and i
terminate in the filter unit These junction boxes are located near or upon the units but appear to be abandoned (3FPW JB07A has no cover and by observation no cables within).
- 3. Drawing EE-63C Rev. 2 provides location information for RTDs 3 HTS-RTD169 and 169. These instruments could not be identified in the locations shown on this drawing i
Review
.d invalid Needed Date inM6etor: server, T. L O
O O
'15S8 VT Leed: Nort. Anthony A O
O O
1'15SS VT Mgr: schopfer, Don K G
O O
1'1S'se IRC Chmn: singh, Anend K B
O O
1i22,9s Date:
Date:
RESOLUTION:
Previously identteed by NU? O Yes (#) No Non Discrepent CondMion?Q Yes (#1 No Resolution Pending?O vee @ No ResolutionUnresolved?O yes @ No Review j
A~~rd h Not Acceptable Needed Date
{
Printed 1.C39s 11:41:55 AM Page 1 of 2 l
l
l e
i Northeast Utilities ICAVP DR NL DR MP3-0920 Millstone Unk 3 Discrepancy Report kAnthony A O
O G
- VT Lead:
O G-O
' VT Mgr: Schopfer. Don K O
O RC Chmn: S@ Anand K O
O O
Date:
SL Conenents:
l i
l l
\\
l Printed 112311611:4203 AM Pp 2 W 2
~
Northeast Utilities ICAVP DR No. DR-MP3-0921 Millstone Unit 3 Discrepancy Report Review Group: Conrguration DR VALlo Review Element: System inatellatoi Diecipl6ae: Electrical Ove6pn Ow F -- ;y type: Instellet6on trnpiementatm g
System?racess: HVX NRC Sigreconce level: 3 Date Faxed to NU:
Date Published.1/2598 Descrepency: Conduit Support Spans in Excess of Allowab;i DescrtPtnon: Drawing 12179-BE-52AS, Rev. 4, Note 65 provides guidance on the use of flexible conduit mid-run and requirements for such applications. The maximum allowable length of flex is 4 feet, maximum distance to the first support is 2 feet and the maximum distance to the next support Ic 3 feet ( the " rigid back span"). With resoect to these requirements, the following field conddlons were noted.
- 1. Rigid back span of conduits shown on FSK AB-3331, Rev.1 A is 4'-10". Rigid part of flex span is 1'.10" but is limited to 1'-0".
- 2. Conduit 3CC2070G 3" as shown on FSX-AB-3876, Rev.1 A has flex span of 5'-6" and the rigid back span is 4'-0".
- 3. Rigid back span for conduit shown on FSK AB-4253, Rev. 3A is 6*-0".
- 4. Rigid back spa i for conduit shown on FSK-AB-4936, Rev. 3 is 3'-8".
- 5. The conduit shown on FSK AB 5216, Rev.1 has a rigid back span of 44 inches.
- 6. P.igid back span of 3" conduit 3CX936PA as shown on FSK-AB-5669, Rev. 2 is 5'-0*
- 7. All conduits that transition to flex from support sho$vn on FSK-AB-5717, Rev. 2A have rigid back span of 5'-6"
- 8. Conduit 3CX104PF8 as shown on drawing FSK AB-5746, Rev.1B has rigid back span of 5' 0".
- 9. Conduit shown on drawing FSK AB-5972. Rev.1 has a rigid back span of 3'-6".
- 10. Conduit shown on drawing FSK-AB-6224, Rev.1 has a rigid back span of 5'-0"
- 11. Conduit 3CX935PQ shown on drawing FSK-AB 5623, Rev.
3A has a rigid back span of 3'-6".
- 12. Conduit shown on drawing FSK-AB-6509. Rev.1 has a rigid back span of 4'-6"
- 13. Conduit 3CX1060G1shown on drawing FSK-MA-693, Rev.
1B has a rigid back span of 7' 0".
Printed 1/39311:C35 AM Page 1 of 2
4 Northeast Utilities ICAVP DR No. DR-MP14921 Millstone Unit 3 Discrepancy Report
- 14. Conduit shown on drawing FSK MA 1063, Rev.1 has a rigid back span of 8' 6*.
- 15. Conduit shown on drawing FSK-MA 1137, Rev. 3 has a rigid back span of 6'-6".
- 16. Conduit shown on drawing FSK MA 1370, Rev.1 has a rigid and flex span of 6'-0" exceeding the allowable of 5'-0".
- 17. Conduit 9CC205 PDC has span of 2' 3' ligid with 2' 9" flex (Reference FSK AB 1291, Rev.1A). Genera! Note 65 limits rigid length to 2'-0".
- 18. Estimated spans for conduit shown on Dray /ing. 25212-34011 SH AB-8719, Rev.1are 7'-6" and 6'-0".
- 19. Rigid span of conduit 3CC207PH as shown on FSK-AB-525, Rev. 4 is 5' 2".
- 20. Rigid span of conduit 3CC935PD as shown on FSK AB-4805, Rev. 2 is 4'-2".
Review Valid invalid Needed Date initiator: server, T. L Q
Q Q
1/15/9e VT Lead: Neri, Anthony A G
O O
1'1ar9e VT Mgr: schopfer, Don K G
O O
'I1mse IRC Chmn: singh, Anand K Q
Q 1/22/98 Date:
INVALlo:
oste:
RESOLUTION:
Previously identised by NU7 O Yes (8) No Non Discrepent Cond4&on?Q Yes (9) No Reechdion Pending?O vee @ No ResolutionUnresolved?O Yee @ No Review Acceptable Not Acceptable Needed Date VT Lead: Neri, Anthony A VT Mgr: schopfer. Don K 1RC Chmn: singh Arand K O
O O
Date:
sL Consnents:
Printed 1/219611:42:44 AM Page 2 of 2
Northeast Utilities ICAVP DR No. DR-MP3 0923 Millstone Unit 3 Discrepancy Report Review Group: Configuraten DR VAllo Review Element: system insteinsten Diecipline: Electreal Deeg" Ow D6ecrepency Type: Instansten implementation
@ No systemerocese: Hvx NRC signl#cence level: 3 Date faxed to NU:
Date Published: 1/2590 Descrepeacy: CONDUlT SPANS EXCEED ALLOWABLE D*ecr6ption: Standard Conduit support detail drawings (12179-BE 52 series drawings) provide the criteria and generalinstallation notes for conduit supports. The following span criteria violations were observed during system walkdowns
- 1. Conduit shown on drawing FSK AB-6057, Rev.1has a span of 6* 0* exceeding the allowable 4'-6" for 1' AL conduit per table CA.
- 2. Conduit shown on drawing FSK AB-6078, Rev.1 A has spans of 8' 6' exceeding allowable of T-9" for 4' AL conduit per table CA.
- 3. Conduit shown on drawing FSK AB4124, Rev.1 has a span of 6' 0" exceeding allowable of 5' 6" for 1 %" AL conduit per table CA.
- 4. Conduit shown on drawing FSK AB4327, Rev. 2 has a span of 4' 10' exceeding allowable span of 4' 6" for 1" AL conduit per table CA. Conduit shown on drawing FSK-AB-6653 Rev.1 has a span of 4'-6* exceeding allowable of 4' 3* for %" STL conduit per table CA. Conduit shown on drawing FSK-MA 1290, Rev.1 has a span of 8'-0" exceeding allowable span of T-9" for 4" AL i
conduit per table CA.
- 5. Conduit shown on drawing FSK MA 1401, Rev.1 has a span of 7' 5" exceeding allowable span of 6'-6* for 2" STL conduit per table CA
- 6. Flex sDans for conduits snown on drawing FSK-AB-4564, Rev.
2 from box are estimated by field observation to be 5'-0".
Standard Detail Drawings (12179 BE52) General Note 24 limits spans to 4' 0".
- 7. The flex span from the box to conduit shown on drawing 25212 34011 SH AB-8738. Rev.1 is 4'-6*.
- 8. Conduit shown on drawing FSK AB-3905, Rev. 2 has a span to box of 4' 0*. Note 6 on drawing BE 52YS limits span to 3'-0".
- 9. The conduits shown on FSK AB-3603, Rev. 3G have estimated spans exceeding the limits for %" ard 1" conduits as listed in Table CA of drawirig 12179-BE 52CA.
- 10. The conduits shown on FSK-AB-1250, Rev. 2B has a span of 5'4' which exceeds maximum allowed for 1" AL per table CA of drawing 12179-BE 52CA. Allowablo is 4' 6".
Printed 1/234812-39 50 PM Page 1 of 2
i l
]
a
)
Northeast Utilities
!CAVP '
DR No. DR-MP3-0923 i
Millstone unit 3 Discrepancy Report
- 11. Spans for 3' AL conduit are limited to 7V" by Table CA.
Field estimated span for conduit shown on support drawing FSK-AB-8217, Rev. 3 is 7'-6".
- 12. Conduit shown on drawing FSK MA 937, Rev. 2 has a span of 8' 3* exceeding maximum allowai)le span of 8' 0" per General Note 3.
- 13. The first support on conduit 3CC133PA2 from 3JB*3663 is more than the allowable 3 feet as specified in the Electrical installation Specification E350.
Review Valid inveled Needed Date initiator: Server T.L O
O O
1/15/98 VT Lost Neri, Arthony A O
O O
trie/se VT Mgt: Schopfer, Don K Q
Q Q
i/IEV98 IRC Chmn: Shgh, Anand K G
O O
ir22/98 Dei.:
INVALID:
Date:
RESOLUTION:
Previously identined by NU7 U Yee @ No NonDiscrepentCondition?Q Yes @ No R duuonP.ndino70 ya @ No Reeduth unreedved?O va @ No Review Acceptable Not Acceptable Needed Date go,. g VT Lead: Nort, Arthony A VT Mgr: Schopter, Don K IRC Chmn: Singh, Anand K Date:
1' SL Commente:
PrWed 1/23/9812A0:08 PM Pege 2 of 2
Northeast Utilities ICAVP DR No. DR-MP3 0924 Millstone Unit 3 Discrepancy Report Review Group: Confgurshon DR VAs.lO Rev6ew Element: System instellehon p
Diecipl6ne: EW Da$n O va Diacropency Type: Installehon imp 6ementshon
@~ No systemerocese: Hvx NRC signincence level: 4 Date Faxed to NU:
Date Published: 1/2596 Diecrepency: Improper!.abeling of Raceway Dacripuon: Procedure OA-9 and Electrical Installation Specification E350, i
Rev. 9 require the correct labeling cf components and raceways. The following labeling anomalies were noted with regard to these requirements
- 1. %" conduit listed on drawing as 3CC834PB3 has no tag in field and is not listed on raceway schedule. Conduit routes to non-safety related box 3JB2522, yet also routes to box near equipment that also contains the "P" safety-related condult.
(Reference drawings FSK-AB-8005, Rev. 2 and FSK-AB-8113, Rev. 2)
- 2. Conduit is listed as 3CK1060G1on drawing FSK-MA-1017, Rev. 2A. TSO2 and field walkdown determine correct ID is 3CX1060G1.
- 3. The field !ag on this support is 1259 which is a duplication of another support nearby. (Reference drawing FSK MA-1039, Rev. 3)
- 4. J-Box is identified on support drawbg FSK-AB-1291 Rev.1 A as 3CCP*JB19A. Tag in field is 3CCP'JB197A.
5 Drawing FSK-AB-4484, Rev. 3 identifies supponed J-Box as 3JB-2624. Field tag is 3JB*2624.
- 6. Conduits 3CX9260G and 3CX9260G7 are not identified in field.
- 7. Junction box 3HVP*JB268 is not identified in the field.
- 8. The wire way 3CES-RK12 8 is not tagged in the field.
Conduits to this raceway from Instruments 3HVR-PDIS918,938, and 94 B,157A,157B do not shcw the wireway as a from/'o for the conduits; but shows the from/to as "end".
- 9. Conduit 3CC11500 did not have an identification tag installed.
10.-Junction boxes 3HVR*JB1-1 A and 3HVR*JB1-2A have erroneous instrument information listed on the box in the field.
The boxes are also mis-identified on drawing EB-45G Rev. 9.
Field and drawing indicate boxes are for 3HVR*TS175A-1/ A-2 and 3HVR*TS175A 3/ A.4 respectively. The correct designations for these boxes are 3HVR*TS175A 1 and A-2 respectively. Similar situation exists for instruments 3HVR*175B-1 and B-2.
Prtnted 1123,9612M43 PM Page 1 of 2
l Northeast Utilities ICAVP DR No. DR MP3-0924 Miiistone unM 3 Discrepancy Report
- 11. Junction boxes 3JB'2518 and *2516 appear to be mis-labeled in the field. Based on the Conduit attachments shown in the Cable and Raceway Control Program (TSO2) and on drawing 48H, Rev.10 the tags have been swapped.
Review Valid invalid Needed Date initiator: Servsr, T. L-0 0
O sissise VT Lead: Nort, Anthony A O
O O
Siird's VT Mgr: Schopfer, Don K O
O O
siisse O
1/22/De IRC Chmn: Singh, Anand K Date:
INVAUD:
Date:
'tESOLUTION Previously identelled by NU7 U Yee @ No Non Discrepard Condition?O ved @ No MesoM6on Ponding?O vee @ No Reedution UnreedvedtO vos @ No Review Acceptable Not Acceptable Needed Date VT Leed: Nort, Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Singh. Anand K O
G Date:
SL Comments:
E PrNed 1/219e 12AO.53 PM Pope 2 of 2
Northeast Utilities ICAVP DR No. DR MP3-0931 Millstone Unit 3 Discrepancy Report av.
DRVALlo Review Group: Con 4uration Review Element: system instanaten Mm Operm luue DiscW '4tcal D"96 O vee Discrepancy Type: Instansuon imp 6ementshon (5) No System &rocese: DGX NRC Signiscence level: 3 Date Faxed to NU:
Date Published: 1.25so Descrepancy: Conduit Supports not in accordance with design documents Ducripuora Standard Selsmic Conduit Support criteria are included in the 12179-BE 52 Series drawings. These drawings include allowable spans (i.e., the distance to the next support) for
'onduits. Contrary to the requirements of these standards, the fo. owing anomalies were observed during system walkdowns.
l
- 1. Conduit 3CX9260C has a span of 8 ft, to adjacent supports from that shown on Conduit Support Log 121790-FSK DG042, Rev. 4. This is greater than the allowed span for any conduit in any location.
- 2. Conduits 3CX95000 (identified as OC on CSL) and 3CX9500N4 are attached to support CB 1541 as shown on Conduit Support Log 12179-FSK-1541. The span tu adjacent supports for these conduits exceed the allowable as specific on drawing BE 52AN, Rev 5.
- 3. Conduit 3CX449NX3 is listed on Conduit Support log 12179-FSK DG-129, Rev. 4A, as attached to the support. This conduit is not attached and as a result its span of greater than 7 feet 4 inches exceeds the allowable.
- 4. Conduit Support Log 12179-FSK CB 555, Rev. 8, in Section 1 shows all conduits attached to the top of the horizontal members. This is not accarate; all conduits attached to de B member are below as is 2 of the 4 on the C member.
- 5. Drawing 12179-BE 52AS, Rev. 4, Note 65 provides guidance on the use of flexible conduit mid-run and requirements for such applications. The maximum allowable length of flex is 4 feet, maximum distance to the first support is 2 feet and the maximum distance to the next support is 3 feet ( the " rigid back span"). With respect to these requirements, the following field condMons were noted: Conduit 3CX9260G5 has a rigid back span of 4 feet -10 inches, Conduit 3CX9260A has a rigid back span of 4 feet-5 inches.
- 6. Conduit support log 12179-FSK-DG490, Rev. 4 shows two conduits for the support in section 1. only one conduit is listed as attached and field observations revealed only one conduit attached.
Review Valid invand Needed Date initiator: Server. T. L G
O O
t/15Se vT t e: w.n, Antnony^
G O
O 1/15Se VT Mgr: schopfer. Don K G
O O
1'1SS8 Printed 1/23Se 12'41.54 PM Page 1 of 2
I Northeast Utilities ICAVP DR No. DR MP3 0931 Millstone Unn 3 Discrepancy Report IRC Chmn: SWgh, Anand K g
g 1/22/96 De'.e:
INVALID:
Date:
RESOLUTION tveviovely identified by NU7 Q Yes ($ No Non D6ecrepent Condit6on?U Yes (@ No Resou6an reasnarO va @ No Raouwunramed70 va @ No Review Acceptable Not a,,.pah Needed Date VT Leed: Ned, Anthony A VT Mgt: Schopfer, Don K IRC Chmn: Sk"Jh, Anand K g
Deio:
SL Comments:
~-
Pnneed 1/23/9e 12 CO3 PM Page 2 of 2
Northeast Utilities ICAVP DR No. DR-MP3 0961 Millstone Unit 3 Discrepancy Report Review Group: System DR VNJD Potentie etely leeue -
Diecrepency Type: Calculaten gg Systenerocese: HVX NRC $6greconce level: 4 Date faxed to NU:
Date Putdiohed: if2596 Discrepency: Tubing Support Calculation Discrepancy Deecr5Gon: We have reviewed Tubing Support Calculation No.12179-NP(F)-
Z615A 003-H014, Rev.0.
Based on this review we have noted the following discrepancy.
We have requested a standard base plate calculation no.12179 NP(F)-Z600F 912 0 thru RF1 MP3-737 for base plate analysis. Per NU Response ID M3-IRF 1214, this calculation no. is not a valid no. Since tubing support calculation references the standard base plate calculation, qualification of the baseplate cannot be confirmed.
Review Vend invalid Needed Date initiator: Patel, A.
y Q
1S 96 VT Leed: Nort. Anthony A O
Q 1996 VT Mgr: Schopter, Don K 1/1296 IRC Chmn: $!ngh, Anend K y
O 1/22/96 Date:
INVALID:
Date:
RESOLUTION:
Previously identifled by NU7 O vos @ No Non D6screpent Condet60n?O Yes @ No ResolutionPendmg?O vos @ No Resoiutionunresoev.d70 vos @ No Review Acceptable Not Acceptable Needed Date VT Leed: Nort, Anthony A O
O G
W Mgt: Schopfer, Don K j
1RC Chmn: Singh, Anand K Date:
SL Commente:
Printed 1/239e 12.42'43 PM PeGe 1 of 1
l l
1 Northeast Utilities ICAVP DR No. DR MP3 0962 uliistone unit 3 Discrepancy Report Revww oroup: Sywom DHVAuo Review Element: System Design Diecipane: Strudural Desig" O Y=
. ;p Type: Calculation gg System 9tocese: HVX NRC Sigedhcance level: 4 Date faxed to NU:
Date Published: 1/2598 3
Diecrepency: Tubing Support Calculation Discrepancy poecription: We have reviewed Tubing Support Calculation No.12179-NP(F)-
Z812A 119-H004, Rev.0.
Based on this review we have noted the following discrepancy.
We have requested a standard base plate calculation no.12179-NP(F) Z918-0 thru RFI MP3-808.
Per NU Response ID M3-lRF 1281, this calculation no, is not a valid no. Since base plate loads of tubing support are compared with loads from standard base plate calculation, qualification of the base plate cannot be confirmed.
Review Valid invalid Needed Date initiator: Patel, A.
G O
SSSe VT Leed: Neri, Anthony A B
O 1sse a
VT Mgt: Schopfer, Don K Q
Q 1/1948 Q
il22S6 IRC Chmn: Singh, Anand K Date:
INVALIO:
Date:
RESOLUTmN:
Previously ident6eed by NU7 O Yes tel No Non Discrepent Condit6on?Q Yes (o) No ReeduimPenangtO Yes @ No Reduuonunrudved70 vos
@ No R. view initiator: (none)
VT Lead: Nort, Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Singh. Anand K O
O Date:
SL Commente:
Prtnled it2MD612-43.31 PM Page 1 of $
DR No. DR MP3 0963 Northeast Utilities ICAVP i
Millstone Unit 3 Discrepancy Report DR VAuD Review oroup: Syesem EW: Spern Mn Potential Operetsty leave Diecipline: Structurel Design O Y=
Discrepency Type: Celculaten
@ No SystemProcase: N/A NRC signHncence level: 3 Date faxed to NU:
Date Putnished: 1/2596 D6ecrepency: Reference Documents are not available from NU D*ecriptian: We have requested the microfiche for STRUDL & BASEPLATE runs to complete the review of the following calculations.
These documents are not available per NU ICAVP Response I.D. Nos as listed below. Therefore the review of the calculations 1
cannot be completed.
CALCULATION NO.
RFI NO.
IRF NO.
CFSK-736MA.E29 MP3 786 M3-IRF-1308 NP(B)-1041 XC MP3-786 M3-lRF-1308 NP(B) Z545E-697 MP3-786 M3-lRF-1308 NP(B) Z545B 214 MP3-786 M3-IRF-1308 NP(B)-Z5458-228 MP3-786 M3 lRF-1308 NP(B)-Z545C-365 MP3-786 M3-IRF-1308 NP(B)-Z545G 822 MP3-786 M3-IRF-1308 NP(F) Z612A 119-H004 MP3-786 M3-IRF 1308 NP(F)-Z615A 003-H033 MP3-808 M3-IRF-1281 NP(F) Z507A 084 (EQ. MT.) MP3-734 M3-IRF 1169 NP(B) Z545G-841 MP3-716 M3-lEF-1120 NP(B)-Z545J-1218 MP3-735 M3-IRF-1154 NP(B) 545H-972 MP3 735 M3-IRF-1154 l'.O-SE34.418 MP3--743 M3-lRF-1171 NP(B) 545J-1245 MP3-735 M3-IRF-1154 Review Valid invalid Needed Date initleter: Patel, A.
Q Q
1/1596 VT Lead: Neri Anthony A G
O O
trisse VT Mgt: Schopfer, Don K Q
Q Q
1/19G8 IRC CLmn: Sin 0h, Anand K O
O O
ti22/se Date:
INVAUD:
Date:
RESOLUTION:
Previously identifled by NU7 O Yec
(*) No NonDiscrepentCondition?Q Yes (e) No RehPending70 Yee @ No Renoiutionunresoeved70 vos @ No Review Acc ;" '
Not Acceptatne Needed Date g
VT Lead: Neri, Anttory A VT Mgt: Schopfer, Dc.i K IRC Chmn: Sirgh, Anand K Date:
Prtnted 1/234612 44Y4PM - ~ '
Psge 1 of 2
~
l Northeast UtilMies ICAVP DR No. DR4AP34963 Millstone unn 3 Discrepancy Report
]
1 i
l l
\\
s PHrsed 1!23961244.20 PM Page 2 of 2 l
e,
Northeast Utilities ICAVP DR No. DR MP3-0964 Millstone unit 3 Discrepancy Report Review oroup: System DRVAUD PotenHel Operability issue Diecipline: Structure' Desir,.'
O v.
- ;y Type: Calculation gg F---
System / Process: N/A
~
NRC Significence level: 4 Date faxed to NU:
Date Pubilshed 1/2MI6 F M my: Standard Tubing Support Calculation Discrepancy D*ecription: We have reviewed the Standard Tubing Support Calculation No.
12179 NP(B)-1037 XC, Rev.0.
Based on this review we have noted the follcwing discrepancy.
We have requested the refereince calculations Z-979-12-0 & Z-979-16-0 for base plate load comparlslon thru RFl No. MP3 786.
Per NU Response ID-M3-IRF-1216, these calculation nos. are not valid nos. Since these calculations are referenced in the standard tubing support calculation, quellfication of the base plate cannot be verified.
Review Valid invalid Needed Date O
1/M'8 initiator: Patel. A.
[
Q.
1/9/98 VT Lead: Nort, Anthony A 0
O tri9<9e VT Wy: Schepfer, Don K IRC Chmn: S&$i. Anand K G
O i22/9e Date:
INVALID:
Date:
RESOLUTION:
Previously identifled by NU7 Q Yes @ No NonDiscrepentCondition?Q Yes @ No ResolutionPending?O Yee @ No Resolutionunr..uv.s?O Yee @ No Review Acceptable Not Acceptable Needed Date g,.
VTiond: Nort, Anthony %
O O
O VT Mgr: Schopfer, Don K 1RC Chmn: S$ Anand K Date:
SL Comments:
(-
l Printed 1/23/9612AtL17 PM PJ0e 1 of 1 i
(
ICAVP DR No. DR-MP3-0966 Northeast Utilities Millstone Unn 3 Discrepancy Report Rev6ew Oroup: System DR VALID 0
Review Element: System Doogn Diecipline: Mechen6cel Deegn gy E
ay Type: C***wi Om SystemProcese: SWP NRC SignWicence level: 3 Date faxed to NU:
Date Published.1/2598 Discrepency: Englaeer supplied nozzJe loads to the vendor do not match with piping analysis loads.
==
Description:==
The vendor seismic qua'ification report for four strainers 3SWP*STR1 A/B/C/D was reviewed and following discrepancy was identified.
The engineer supplied nozzle loads to the vendor for the strainers qualification do not match with the nozzle loads determined in the piping stress analysis calculaiton#12179-NP(B)-X1900/X1901.
This may underestimate actual stresses, Review Valid invalid Needed Date initiator: Patel, Ramesh 1S 96 VT Lead: Nort, Anthony A G
O O
$/12.9e VT Mgr: Schopfer, Don K Q
Q Q
1/1M6 1RC Chmn: Singh, Anand K G
O 1r229e Date:
INVALID:
Date:
RESOLUTION:
Previously identifled by nut Q Yee @ No Non Descropont Condetion?Q Yee @f No ResolutionPend6ng10 vos @ No Resointionuaresoived?O vos @ No Review Acceptable Not Acceptable Needed Date gg; g O
G VT Leed: Nort, Anthony A VT Mgr: Schopfer, Don K 1RC Chmn: Sin 0h, Anand K Dele:
SL Commenta:
Printed 1/23981146.03 PM Page 1 of 1
Northeast Utilities ICAVP DR No, DR MP3 0967 Millstone UnN 3 Discrepancy Report Reyww oroup: sywom DR VAuD Revkw riemem sywom Demon I
05 culpt6ew: strwsure Design 06ecrepancy Type: Calculaten g) g systemProcese: HVX NRC sp*=ce level: 4 Date FAXe4 to NU:
Deta Pubil#ied: 1/2596 D6screpency: Duct Support Calculation Discrepancy D**ctl tion: We haVe reviewed Duct Support CalculP' ton No.12179-NP(F).
P Z545H 960, Rev.3.
Based on this review we have noted the followhg discrepancy.
I We have requested STRUDL run & STARDYNE outpot thru RFl no. MP3 705 (items 2,3,4 & 5) to complete the review of calculation. Since the computer disk sent by NU for the above request does not have the required computer data for base plate design, qualification of the base plate can not be confirmed.
Rev6ew Valid invalid Needed Date infilator: Palet, A.
O O
O tid 46 VT Lead: Nerl, Anthony A
[
Q 1/1296 VT Mgt: Schopfer Don K B
O O
5ligs0 IRC Chmn: Singh, Anand K B
D D
ii22S6 Date:
INVAUD:
Dele: -
REs0L'JTION:
Previously identi3ed by Nu? O Yes @ No Non Diecrepent Condition?O Yes T No Resolut6on Pending70 vos @ No ResolutionUnresolved?O ves @) No Aeview Acceptable Not Acceptable Needed Date gg g VT Leed: Nort, Anthony A 0
0 vr mer: schov.r, Don x 1RC Chmn: Singh, Anand K g
Date:
st Conenenta:
Printed ti2398124 47 PM -
Page 1 of 1
- n
Northeast Utilities ICAVP DR No. DR MP3 0969 utilstone unit 3 Discrepancy Report Rev6ew Group: System DR VAUD hv6ew Element: Byelem Dmign gp y,,,,,
w, m struotve' "'"
O vee D6ecre$ ency Type: C**
gg SystemProcess: HVX NRC sterwarm leveh 3 Date faxed to NU Date Putnehed: tr2598 E=
Jxy* Dud Support Calcolation Olscrepancy Dmertpenon: We have reviewed Pipe Support Calculation No.12179 NP(T).
Z545J 1235, Rev.2.
Based on this review we noted the following discrepancies.
- 1. On page#12, Angle 4x4x3/4 is analyzed and due to interference, Angle 4x3x1/2 is used in the field.
This is noted in the calculatioli and accep4d by engineering judgernent. Angle 4x3x1/2 has lower sectional properties and it is not structurally adequate as shown below.
Ratio of A,eas= 5.44/3.25=1.67 sq. In.
Therefore, actual axial stress =fa=11704x1.67=19590 psi KUr (min)=1.0x64/.639=100 Therefore, allowable axial stress =Fa=12.98 ksl < fa=19.59 ksi (NO GOOD)
- 2. Angle sections are not checked for r.ombined axial and bending stresses and also the AISC CODE check is not performed in STRUDL RUN.
- 3. On page#13, for Angle 6x4x1/2 axial stress ratio fa/Fa=.Pi>,15 and it is quahfied by engineering judgment.This is unacceptable methodology.
Rev6ew l
Valid invalid Needed Date initastor: Palet, A.
O O
O trisse VT Leed: Neri, Anthony ^
O O
O inase VT Mgr: Schopier DonK O
O O
it a,e IRC Chmn: Singh. Anand K Q
Q 1/2298 Date:
INVALID:
Date:
Maa0LUTION:
Previounty identeaed by NU7 U Yes (9) No NonD6ecrepentConditionfO Yes f9INo Rese4utionPending?O vos @ No R=e.iuiiaauareseevedrO vos @ No Moview
'"*f'8 ahia Not Acceptable Needed Date m.g O
O O
VT Lead: Nort, Anthony A O
O O
vT Mer: se. Don K b
iRC chmn: singh. Anand K Printed tr/1upt 12.47.43 PM Page t of 2
l Northeast UtilR6es ICAVP DR No. DR-MP34989 l
MlHetone UnN 3 Discrepancy Report O
O O
Oste:
SL Cowenents:
I I
e 3
k 5
I r
k I
l 1
I Pope 2 of 2 PrMed 1/234612.47;50 PM l
i
O Northeast Utilkies
!CAVP DR No. DR MP3 0943 Millstone UnN 3 Discrepancy Report ne*,
- cene,,si.on onvAuo ne* awisai: si*m o=en o,,,,,,,,,,,,,,,
ow mas: - Dawn o y, I
Dhopency Type: Drewq fi) No systesWProcese: HVX
~
NaC sionmcance level:J 0,se grAXed to NU:
2 Dele Putdehed: 1/2596 W -~
ny: Nameplate data differences.
Ducr946en: The following difference in vendor data from drawings and specifications as compared with the nameplate data on the installed components were noted.
Item i Specification 12179-2472.900-594 (sheet reference and revision as not xf) Indicates that the power consumption for the below listed motor operated dampers is 225VA. Pl
- icate a load current of 1.9 amps. Based on the rated voltag o,120 Vac this value is consistent. However, the nameplate data ivr each of the motors ind':,ates that the load current is 2.35 amps, thrafore power consumption may be higher than that provided by the vendor in the specification.
3HVR* MOD 28B; Sheet A2 8, Rev,2 3HVR* MOD 49A; Sheet A2 32, Rev. 3 3HVR* MOD 49C1; Sheet A2 34, Rev. 3 3HVR* MOD 50A; Sheet A2 36, Rev. 3 3HVR* MOD 50B; Sheet A2 37, Rev. 3 3HVR* MOD 5001 Sheet A2 38, Rev. 3 3HVR* MOD 50C2; Sheet A2 39, Rev 3 Item 2 Specification 12179-2472.900-594 Indicates that the power consumption for the below fisted motor operated dampers is 225VA. PDDS indicate a load current of 1.9 amps. Based on the rated voltage of 120 Vac this value is consistent. However, the nameplate data for each of the motors indicates that the load current is 2.0 amps, therefere power consumption may be bl0her than that provided by the vendor in the specification.
3HVP' MOD 23B; Sheet A2107, *tev.1 3HVP* MOD 20A; Sheet A2100 Rev,1 3HVP* MOD 20C; Sheet A2102 Rev.1 Item 3 Specification 12179-2472.900 594 page A217, Rev. 2, Indicates that the power consumption for the SOV associated with 3HVR*AOD39A is 17.4 watts. Ha,vever, the nameplate data for the solenoid indicates 17.5 watts.
Etnted 1/23%412A8M PM Page 1 of 2 i
1 r-Y
Northeast Utilities ICAVP DR No. DR MP3 OH3 Millstone Unit 3 Discrepancy Report l
Item 4 Specincation 12179 2472.900 594, on the indicated pages, l
provide the model numbers for the below listed dampers. The field Verification, noted the identified differences in the model numbers.
3HVR*AOD398 Specification 12179 2472.900 594, Page A218. Rev. 2 indicates the SOV is Catalog Number NPK8320A182E; nameplate data Indicater ?atalog Number NPL8321 A1E.
3HVR*AOD43A Specl0 cation 12179-2472.900 594, Pa0e A2 23. Rev. 2, Indicates the SOV is Catalog Number NPK8320A182E; nameplate data indicates Catalog Number NPL8321 A1E.
3HVR*AOD438 Specification 12179-2472.900 594, Pa0e A2-40, Rev. 2, Indicates the SOV is Catalog Number NPK8320A182E; nameplate data Indicates Catalog Number NPL8321 A1E.
3HVR*AODt58 Specification 12179 2472.900-594, Page A2-41, Rev. 3, indicates the SOV is Catalog Number NPK8320A182E; nameplate data indicates Catalog Number NPL8321 A1E.
Review Valid invenid Needed Date Inalator: Server. T. L G
O O
ns.se VT Leed: Nort. ^'m' A O
O O
'1*se i
VT Mgt: Schopfer. Don K O
O O
iiises IRC Chmn: Singn. Anand K O
O O
ir22.Se Date:
DNALID:
Date:
RESOLUTION:
N.' 7 Identtaed by NUT U Yes @ No NonDiacropen;CondNion?Q Yee @ No PM% Pending?O vee (!)No P "%unresoevedtO re. (*J No Review AWh Not A -:7 "- Needed Date f
g O
O 9
VT Lead: Non, Anthony A O
O O
VT Mgr Schopfer. Don K
]
]
inC cienn: Singn. Anend x Date:
SL Conenents:
Prveed 1/23/9a 12A6 30 PM Pege 2 of 2 y
.w
.4_.%:
--w-
..e
..yy.M
+
v
="w'
4 Northeast Utilities ICAVP DR No. DR MP3 0M4 i
Millstone Unit 3 Discrepant,/ Report Review Group: ConRgurstson DR 'IN in lectncel Design
'"==.; _ ny Type: Drewmg gg systemerocese: DGX NRC Signiacance levet: 4 Date faxed to NU:
Date Pt.utiehed.1/2$96 06='*Pancri Vendor data / drawings not consistont with installed component nameplate D=crtPtion: The following items regarding vendor data / drawir4s were found to not be com,istent with installed component nameplate as observed during system walkdowns.
Item 1 Drawing 12179 2447.270-043-003 Rev. B, incorrectly identifies the fuel oil transfer pumps 3EGF*P1 A, B, C, and D with a dash ('.
- ) In lieu of an asterisk ("*). This drawing also Indicates the motor speed is 3500 RPM; drawing 2447.200-U13-001 Rev. F, Indicates that the speed is 3440. The nameplate for the motors indicates the motor speed is 3530.
Item 2 Drawing 12179 2447.300 241-004 Rev. F, provides motor speed data for the listed pumps. The nameplate data observed h the filed for the attached motor drivers is different.
3 EGO *P1A; Drawing 1200 RPM; Nameplate 1140 RPM.
3 ego *P1B; Drawing 1200 RPM; Nameplate 1140 RPM.
3 EGO *P4A; Drawing 1200 itPM; Nameplate 1170 RPM.
3 EGO *P4B; Drawing 1200 RPM; Nameplate 1165 RPM.
JEGS*P2A; Drawing 1800 RPM; Nameplate 1745 RPM.
Review Valid im elid Needed Date initiator: Server. T. L.
O O
O sii29s VT Leed: Nort, Anthony A O
O O
1/5
VT Mgr: schopfer. Don K O
O O
tita96 1RC Chmn: Singh, Anand K Q
O O
1/2296 Date:
INVALID:
Dele.
REs0LUTioN:
Previously identfaed by NU? O Yes @ No
' don Discrepent Condition?Q Yes @ No r-PenmaarO va @ No P-*% unradved70 va @ No R. view Acceptable Not A--- ; "- Needed Date b
vt Lead: Nwl, Anthony A O
O O
vr Men schopew, con K Prtnled 1/239612.49.15 PM Page 1 of 2
0 Northeast Utilities ICAVP DR No. DM MP3 0M4 Millstone Unit 3 Discrepancy Report 9
9 IRC Chmn: Sm Anand K O
O Dele:
SL Comments:
l
}
}
Prtnied 11234612:49:22 PM Page 2 of 2
. ~ -.. ~ - -..,...
MC g
Northeast Utilities ICAVP DR No. DR MP3 0968 Misistone Unit 3 Discrepancy Report Review Group: Co6 Nurohon DRVAUD Review Elemoed: Syelem Design Diecipane: I & C Doog" O va Diecropency Type: Drewing
@g systemerecese: Hv>:
N signancence level: 4 Date faxed to NU:
Date Putdiohed: 1/259e D6*crepancy: Drawing differences for instrument / device types.
==
Description:==
The following drawing differences were noted during the preparation for, and th0 condud of, system walkdowns, Loop diagram 3CDS 100 Rev. 3, Logic Diagram LSK 221D Rev. 7, and PalD EM 146A fiev. 24 (boundary document issue) Inoicate inat instruments 3HVR TC185A and B are used to control the chilled water supply to the MCC and Rod Control Area unit coolers. Field walkdown confirmed these acihe installed instruments /controlloop along with a TY185. Contrary to this installed / configured design, the following discrepancies are noted: P&lD EM 122A Rev.13 (boundary documerit issue) indicates that the 165 devices are " TIC," and vendor drawings 2472.900409-326 Rev. C and 2472.900-609 337 Rev. C show the 185 devices as "TS
- Review valid invenid Needed Date inmistort server,T.L G
O O
$'52/se VT Lead: Nort, Anthony A G
O O
1/1'S8 VT Mgr: Schopfer, Don K O
O O
il$ase IRC Chmn: Singh, Anand K O
O O
ii22/se Date:
INVAUD:
Dete:
RESOt$loN:
Previously identened t>y Nu? O Yes iGi No Non Discrepent Condition?U Yes @ No Resolution Pending?O vos @ No Resoiuiianunr ev.drO v
@ No Review Acceptable let M=7'-
Needed Cate VT Leed: Nort, Anthony A VT Mgr: ScWpfer, Don K O
G 1RC Chmn: Singh, Anand K O
1 O
Date:
SL Commente:
Printed il239e 12E $6 PM Pope 161 2
-,,,s-
Northeast Utilities ICAVP DR No. DR MP3 0966 Millstone UnN 3 Discrepancy Report Revtow Grouo: Opershone & SAerdenence and Techng DR VAUD Revtow Element. Meanienerte Procedure 06ecip46ne: Mendenenc*
O vee
'"-:-- xy Type: Test implemerWeton gg systenWProcess: DGX NRC s4-?:me level: 4 page MXed to W:
Date Putd6ehed: 1/259e Descrepency: No program has been established to measure DG cylinder firing pressures and evaluate results Deecripuon: The letter from Northeast Utllities to the NRC dated June 14, 1995 (B15245) statec that '...we have decided to implement a supplemental Inspection in order to better evaluate engine performance. Cunently only rock settings and temperatures are monitored during diesel surveillance runs. Maintenance on a six-month basis will measure cylinder firing pressure and evaluate the results. This will allow an evalustion of the engine timing (retard or advance) and fuel mixture (too rich or too lean).*
RFI 0824 was submitted to obtain the procedure and data sheet that is used to perform the task as described in letter 815245.
The RFI provided a copy of Maint Form 3720CD 1, Rev 3 and referred the reviewer to MP 3720CD, Rev 4 even though OSCAR identifies a Rev 6. The RFI also requested copies of the three most recent uses of Maint. Form 3720CD 1 which had been provided earlier in response to RFI 0715.
Contrary to the above comm!! ment, the reviewer was not able to confirm the following:
- 1. A program has been established to perform a twice year 1y evaluation of the diesel cylinder firing pressures.
- 2. That when data is collected on Maint. Form 3720CD 1 that there is a documented process to calculate the hi0h/ low differential exhaust temperature and firing prer ',ure.
- 3. That any documented evaluation is performed to determine proper engine timing or fuel mixture.
- 4. A process that describes follow-up actions that the evaluation might require.
The work orders associated with " copies of the three most recent ucas of Maint. Form 3720CD-1' provided were dated 9/6/93, 2/1/94 and 5/16/95, it therefore appears that this surveillance has not been performed since 5/16/95 which includes all of 1996 and 1997.
The RFI also requested copies of evaluations performed as a result of the testing program. The site responded that "there have been no evaluations performed because cylinder pressures have not exceeded the limits and rework was not performed."
The subject letter appears te commit the station to a twice yeariy cylinder firing pressure surveillance test of the diesel which includes a subsequent evaluation for engine timing and fuel mixture, it cannot be determined that this program is in place and therefore this is a discrepancy.
Revtew Pope 1 or 2 Prtnied 1/239612.So.3a PM
Northeast Utilities ICAVP DR No. D8t44P3 0M4 Millstone UnN 3 Discrepancy Report Val 6d invalid Needed Dele 1/1196 Insttetor: Ten #n, Tom Q
1,1 & 98 VT Leed: Sees, Ken g
VT Mgr: Schop8er. Don K Q
Q Q
1/1896 IRC Chmn: Singh, Anand K Q
Q 1/2246 Dele:
11WALIO:
Dete:
ItESOLUTION:
Prev 6ouseyidentsnodIpy Nur V Yes @ No NonD6ectopentConditionrQ Yes (Re) No Mesoiution PondinerO vos @ No sies.iuisonunconceveerO vos @ N.
Review
^-,'
Not Acceptable Needed Date g
O O
O VT t.end: Bees, Ken O
O O
vT ugn Schopeer, Den K 1RC Chmn: $@ Anend K Dete:
SL Commente:
i e
~,.
e-
Northeast Utilities ICAVP DR No. DR MP3 0947 Millstone Unit 3 Discrepancy Report Rsvtow Group: System DR VALJD ReAew Element: System Design h5%e: Structural Doogn O v.
D6ecrepancy Type: Chm gg System 9focess: N/A NRC SLMe level: 3 Date faxed to NU:
Date Puteshed: 1/2596 F-^~~~;- ;y Reference document Discrepancy Dancription: We have requested the following reference documents to complete the review of calculations.
These documents are not available per NU vert *I response as listed below.Therefore the review of calculations can not be compieled.
NP(F) Z545G-841 STRUDL# R2582006,9/20/84 NP(F) Z545G 841 STRUDL# R25820078,10/9/84 NP(F) Z545G 841 STRUDL6 R2582003,11/16/84 NP(F) Z545G-841 STRUDLW R2582002,9/21/34 NP(F) Z545G 841 STRUDL# R6357013,1/20/82 NP(F) Z545G-841 STRUDI.# R2582005,10/6/84 NP(F) 2612A 128-H008 STRUDL# R2582082,1/11/P5 NP(F) Z829A 020-H010 STRUDL# 2582010,7/26/84 NP(F) Z545G 868 STRUDL# 6357010 NP(F) Z545G-868 BASE PLATE # ARHGRNO BE 52VR CAlCUI.ATION NO. CG 8 Rev6.w Vand invand useded D.:e initiator: Patel, A.
O O
O 1'16S8 VT Lead: Nort, Anthony A Q
Q Q
1/1698 VT Mgri Sohopfer, Don K O
O O
ti2o9e IRC Chmn: Singh. Anand K Q
Q Q
1/2298 Deie:
INVAllD:
Date:
RESOLUTION:
Previously term by NUF U Yes @ No Non EM - ".Condit6onrU Yes @ No W%pondnerO Yes @ No Recoeuuanunt oevoerO Yes @ No Review A'een Not Acceptable Needed Date g
VT Leed: Neri, Arthony A IRC Chmn: Singh, Anand K
~ @
9
]
vi Mer Schope.r Don K O
O Date:
SL Conwnente:
Prtnted 1/23/9612.51:26 PM Pope 1 of 1
Northeast Utilities ICAVP DR No. DR MP3 4Mt wiistone unk 3 Discrepancy Report j
nev6.w oroup: connene.on OnVAuD Rwlew Element: system Design g
D6ecipline: I & C Deegn O v.
D6ecropency Type: Dreweng gg systemProcess: DOX NRC SWRcence twel: 4 Date faxed to NU:
Date Putushed: if59e 06*r*Pency: incorrect location of Indicators shown on PalD Ductipuon: In the course of drawing reviews the following error in the location of the delsel fuel oil storage tar.ks level 'ndication was noted. P&lD EM 117A Rev.10 (boundary document issue) indicates that 3EDG-Ll25A and Ll29A2 are located at panel EGPA and that 3EDG Ll258 and Ll2982 are located at panel EGPB. The correct location for these instruments are wall mounted local panels 3EDG PNLLl A and 3EDG-PNLLl B, respectively, located within the EDG buildin0 rooms. Other drawings and the installed configuratica reflects the correct locations.
Rev6ew Valid invalid heeded Date initiator: 8xver, T. L.
O O
O
'/8558 VT Leed: Nort. Anthony A O
O O
5'1'ee VT Mgr: Schopfer. Don K O
O O
tr2ose IRC Chmn: Singh. Anend K 8
O O
ir22/se Dele:
DNAUD:
Date:
MEsOLUTioN:
Previously identined try NUF Q vos @) No Non D6ecrepent Condation?Q voo (f) No n.cokaion eenenstO va @ No n=wuuanunre.sv.drO va @ No
- n. view Acceptable Not ^^ - ;'
Needed Date g
O O
O VT Lead: Nort, Anthony A 0
0 0
vT won schope.r, Don x
]
]
iRC chmn: s=,n. Anand x Date:
SL Comnwnts:
Printed 1/2M612.52.08 PM pageiog 1
i Northeast utsties ICAVP DR No. DR4P34M9 j
mastone unit s Discrepancy Report l
noview eneup: opereenne a unemonense ens recens onvauo peneauelopershenyleeue o'oe'P "e:o "
(i) yes i
8 osserspeaer Type: ir=.:m aes*=a=*e O Ne l
eyensavpresses: swp NnC signisosaselevei 3 onte faxed to NU:
J pene puhashed: 1 M ss j
oleerspeasy: Equipment declared epein without test requirements being i
completed por PDCR pedage osserspe** Retest Requirements for PDCR MP3 91444 require:
(fmm page folloMng NEO 3.03, Pape C4 of 4)
[
1.- Establish baseline for a heat exchanger just put back on line by averaging the data from SP3626,13.
~
- 2. Afterinstallation of the new screens, perform SP3626.13 to determine the effect of the screens on differential pressure and i
flow.
- 3. Monitor vibration of the heat exchanger when placing in service after screen installation.
- 4. Engineering to evaluate screen application to determine if any adjustments to SP3626.13 are required with the screens installed.
a RFI-0824 was initiated to rer;uest the documente that confirm the i
above test requirements since they we o not included ac part of the PDCR package.
t A review of the documents provided by RF1-0824 did not confirm that the retest requirements were completed for the following reasons:
- 1. No docum'rts were provided that contained pressure and flow readin0s for the heat exchangers "just put back on line* that could be used to established the "before" or " baseline" readings.
l
- 2. Only one set of "after" readings were provided for heat exchanger SCCP*E1 A. Thors was no "after" data provided for heat exchan0ers SCCPM1B or 3CCP*E10.
3.- No vibration data was provide.d.
- 4. No engineerino evaluation was provided that compared the i
"before" and 'after" readings. There was a handwritten note on Page C4 of 4 of NEO 3.03, Step 8.2 that stated "dp did id chan0e* but this does not constitute an en0 neering evaluation i
particularly since there was no data avalable to support this conclusion.
This is a discrepancy becaussi
- 1. Thors is no evidence that the testing was over performed.
- 2. There is no evidense that the onoineering evaluations were ever completed.
- 3. There is an apparent lack of involvement of a quality review
. to assure that the package is complete.'
t
- 4. From documentation provided for the review, the station.
l closed the PDCR and declared the heat exchangers operable without the testin0 requirements being satisfied.
l
. 2.
- a..
......_.w;-
u...
_.-_..._;__._.a..,_._-._-__._,._..-
. ~,c
Northeast UtilMies ICAVP DR No. DR44P34H9 wilstone Unit 3 Discrepas cy Report Veiki invaud EM Date inleister: Taralyn, Tom Q
t/tN96 VT L.ed: Sees, Ken Q
O g
1/tNoe O
O trinse VT Mgr: Schopfer. Don K O
t/22/se IRC Chmn: Singh, Anand K Date:
IfWALID:
Date:
MEs0LUTION.
~
Prev 6ously identest.d by Nur V Yes @ No Non Dioctopent Condite.nfU Yes @ No n euu n P *.orO v.e @ tw n.e nou.aunr ev.drO v
@ No n.vi laittletor: (none)
VT L.ed: Bees, Ken b
VT Mgri Schopfer Don K 1RC Chmn: Singh, Anand K g
Date:
sL Corivnente:
4 l
l l
i Printed 1I2'./9612.52.67 PM Page 2 of 2 l
i i
Northeast UtilHies ICAVP DR No. DR MP34973 wilstone UnN 3 Discrepancy Report DR VAUD Rev6ew Group: Programme'.e Review Element: Correceta Acten Procese Diecipl6ne: Operat*'*
O ves D6*cropency Type: Correcita Acton g g, j
Systemfrocess: RSS
~
i NRC sigh level: 3 Date FAKod to NU:
f Date Putillahed: 1/2596
'06scroPercy: Corrective Action incorrectly scheduled Oncripe6en: The corrective action for VIR 2278 involves issuing Changes to procedures which implement Technical Specification requirements relative to Valve lineup. Identifying this UIR as
'not startup regis; red" is ir. consistent tvith NUC PI 20, Priority Code 2 criteria which identify " Deficiencies affecting plant technical specifications" and " Documentation that may have operability and/or reportability concems associated with it,'
Revtew VetW invalid Needed Date snai6ator: Wror" '
- O O
O il see VT Lead: Rye.. TN..esJ Q
Q Q
1/1996 VT pegri Schopfer, Don K O
O O
ir2ase IRC Chmn: Singh, Anand K O
O O
ir22se Dele:
INVAUD:
Date:
RESOLUTION:
Prev 60ush identelled by Nu? Q Yes ~iel No Non DiscrapetA Condet6en?O Yes @ No Resolution Pendmgf C von @ No Resolutkelinresolvedf0 va @ No Rev6ew Acceptable Not Accapa.haa Needed Dale VT Leed: Ryen, Thomme J VT lAgr: Schopfer, Don K IRC Chmn: Singh, Anand K O
O Dei.:
SL commente:
Printed 1/239612.5336 PM Pepe 1 of 1
~
Northeast utHities ICAVP DR No. DR MP34974 Minstone Unit 3 Discrepancy Report Revtow oroup: Conngurahon DR VAUD Rev6ew Element: System inatellaten DiecipNne: Ppino D***"
O va E
- xy Type
- Instensten implementaten g, g SyenerWProcess: SWP WIC S'e " wa level: 4 Dale faxed to NU:
Done Pubilehed: 1/2596 1
06ecroPsacy: Walkdown Olscrepancy of the SWP in the ESF Building Deecript6an: The following discrepancy item was found during the walkdown of the piping and mechanical equipment of the SWP in the ESF Building:
- 1. Pipe Support PSR 165 identified on isometric drawing Cl SWP.
210 Sht 3 Rev 10 and shown on drawing BZ 19A-48 has a stiffener plate missing from the backside of the wide flange beam it is attached ic.
Review Velid invol6d Needed Date initiator: Reed, J. W.
O O
O irisS6 VT Lead: Nort, Anthony A O
Q 1/1$90 VT Mgr: Schopfer, Don K Q
Q Q
1/2096 IRC Chmn: Sin 1h. Anend K Q
Q 1/22/96 Dele:
INVAUD:
.s Date:
RESOLUTION:
Previously identened by NU? U vee I9i No NonD6eceopentCondition70 vos @ No Rese4ution Pending?O vee @) No Resolut6onUnresolved?O vos
'*) No Review AccePteble Nu Accepuble Needed Date VT Leed: Nort, Anthony A b
b VT Mgr: Schopfer, Don K
]
]
]
iRC Chmn: Sinoh. Anend K Date:
SL Conenente:
~M1/2M412.54.16 PM Page j of 1 Pr
Northeast Utilities ICAVP DR No. DR MP3 0975 Millstone Unit 3 Discrepancy Report wiew oroup: Conngwei.on DRvAuD Review tienent: syourn Doogn o,,,,,,,,,,
Diecepline: Ppirg Do.ign O v.
Diecropency Tyge: Dreeg
@) No Si s ten #rocese: $WP NRC signsAconce level: 4 Date faxed to NU:
Date Putdished: 1/2MI6 Okcrepency: Upper Tiw to Lower Tier Drawings Review for SWP in the ESF Building De*c@ tion: The Upper Tier to Lower Tier drawings review found the following drawing discrepancy on the as built isometric drawings for the ESF Building:
- 1. On isometric drawing Cl SWP 210 Shi 3 Rcv 10 piping support PSR 135 should be labeled PSR 165.
Reviw Valid lovelid Needed Date Initletor: Reed, J. W.
O O
1/5 M'8 VT Leed: Neri, Anthony A Q
Q Q
1/1546 VT Mgr: Schoofer, Don K O
O O
1/2am8 IRC Clynn: Singh, Anand K O
O O
1/22/96 Date:
INVAUD:
Date:
RESOLUTION Previously identHied by Nu? O Yes (9) No Non Dioctopent Condition?U vos
@ No Resolution Pending70 veo (#>No Resoeunion uar ev.d70 vee (!)No Rev;ew Accspiebie Not Acceptable Needed Dele VT Leed: Nort, Anthony A VT Mgr: &chopfer,0.2 K 1RC C%w Singh, Anand K g
Date:
SL Conenente:
Prtnied 1/239612.56'07 PM Page 1 of 1
Nordwest Utilities ICAVP DR No. OR MP3 0974 Milletone Unit 3 Discrepancy Report Rev6ew Group: Programmetc DR VAUo Rev6ew Element: Conectwo Aoten Process D6ecepl6ne: Otho' O Yes Diecrepency Type: Conectw Acton implementaten gg SystemProcess: DGX
~
NRC signiacance level: 4 Date faxed to NU:
Date Putnehed.1/2598 D6ecrepency: Insufficient Data Provided for Corrective Action implementation on ACR # M3-96-0181 Closure D*ecr586*n: The ACR # M3 96-0181 Corrective Action Plan requires the following action:
' Develop and provide training to plant personnel conceming the importance of seismic issues and plant equipment. Enlighten personnel to situations and re-inforce the questioning attitude towards seismic issues. Items covered in M3-E% 96009 will be covered and expanded as necessary. Note: The training will be covered under the training requirements for ACR # M3 961142.*
The Discrepancy Closuro Request for ACR # M34-0181 (Tracking Number 96009278-03) does not address the implementation of the above Corrective Action Plan action it"m.
The ACR # M3-961142 Corrective Action Plan, attached to the Discrepancy Closure Request for ACR # M3 96-0181, references the following action items:
a) ' Training department to review Design Eng. evaluation and provide / implement training to required plant personnel.' Action was scheduled for completion on 2/20/97 by the Training Department. The Action Request assigned to this action item is 9601373 14.
b) *Evnfuate and review any changes to procedures and guidance for work performed. From this information, develop and implement training for Maintenance and Operation personnel to inform thern of the importance of the saismic requirements and issues pertaining to work in the field.". Action was scheduled for completion on 5/1/97 by the Training Department. The Action Request assigned to tNs action item is 9603373 7.
No documentation to verify implementation of action items 'a' and 'b' above was attached with the ACR # V) 96-0181 Closure documents. Consequently, there is insufficient information to determine whether or not the ACR # M3-96-0181 Correctivs Action Plan item listed above was implemented. The Discrepancy Closure Request for ACR # M3-96-0181 (Tracking Number 96009278-03) was signed off by the Unit Project Manager on 5/12/97.
Note: The following seismic inspection Cetterta' were developed and attached to the ACR # M3-96-0181 Closure document:
MS-EV 96009, ' Engineering Guidance on Generic Seismic Inspection Cnteria for MP3 Equipment and Components
- annmuart nn OftfLQA Prtnted 1/239812.56-42 PM Page 1 of 2
Northeast UtilNies ICAVP DR No. DR MP34976 milstone Unit 3 Discrepancy Report M3-EV 970011,' Seismic Cnteria Guidance during Maintenance and Testing' approved on 1/31/97.
Re4ew Vei6d Imreild No ded Date intenator: Caruso,A.
O O
O 1/twoe VT Lead: Ryan, Thomas J Q
Q Q
1/16S$
VT Mgr: Schopf6t, Don K O
O traores IRC Chmn Singh, Anand K Q
Q Q
1/22/96 Oste:
IlWAUO:
Date:
MESOLUTION;
~
Previoush Montined try NU7
(,,) Yes
'9) No Non Discrepent Condet60nf{ ) vos @ No Resolut6en Pondine70 v.s @ N.
R.e.autionunresohaarO v.e @ No Review
&~apmMa Not A -:', ' "- Needed Date O
O VT Leed: Ryan, Thomme J VT Mgr &chopfer Don K 1RC Chmn: Singh, Anand K Date:
SL Commente:
l-
~
l Prtnied 1/23/9812.55 f,I PM Page 2 of 2 l.
l
. _, _... ~. _,,.. _. _.
i l
i a
Northeast Utilities ICAVP DR No. DR MP34tTT Millstone Unk 3 Discrepancy Report Review Group: Cone y shon DRVAUD Review Elemmt: Modrhoshon instellebon gy 06.capane: I& C Demon O vee
'"=, xi Type: Instehehon implementation
@ No systemfrocess: SWP NRC Sign 6scence level
- 4 Date faxed to NU:
Lose Pubinehed: 1/25/96 Discrepency: Difference in installed conditions and Modification documentat8on (PDCR 3 91016)
==
Description:==
This modification added strap on ultra sonic flow transmitters to be used as part of ISI. DCN DMS S-084195 supplemented previous DCNs that implemented the installation of ultra sonic flow transmitters. This DCN was to document the as-built locations of the transmitters and has been incorporated, without change, into the affected documents. Per the piping installation
^
specification SP ME 570 Rev. 3 the tolerance for locations is 1 inch, The following differences in dimensionallocations were noted.
3SWP FT160A 1/2 is shown (pg 63 of the DCN) as 30 inches from a pipe bend; the instrument was observed to be 28 inches from the bend.
3SWP FT16181/2 is shown (pg 95 of the DCN) as 34 inches from a pipe bend; the instrument was observed to be 31 inches from the bend, Review Valid invalid Needed Date init6stor: Server, T. L O
O O
trisse VT Lead: Nort, ArtNsty A O
O O
5' SS8 VT Mgr: Schopfer. Don K O
O O
st2ose IRC Chmn: Singh, Anand K S
O O
tr22/se DM.:
INVALID:
Date:
REsOt.UTION:
Previously identefled by Nur Q Yes @ No Non06ecrepentCondationrU vos @ No ResolutionPenenetO vos @ No Ree*non unroe*.orO vu @ No Review Acceptable Not Accap8d Needed Date VT Leed: Nort, Anthony A viu n sever. Don K e
IRC Chmn: Singh, Anand K Date:
SL Commente:
1 Prtnied 1123 612.56.29 PM.
Pagei of i
NorthuSt Utilities ICAVP DR No. DR MP3 0979 Millstone Unit 3 Discrepancy Report Review oroup: ConAguraten DR VAUD ReAw Element: Moorceten Design D6er.ipune: Electrical Dee$n O vm F+r. :y Type: Instensten Regurements gg SystemProcoes: DGX
~
NRC Signoscence level: 4 Date FAXW to NU:
Dese Pubsehed: 1/259e Diecrepancy: Inconsistency in modification documentation (PDCR MP3 93 068)
DescrlPuon: This PDCR added annunciator bypass features for testing purposes and included the addition of new 'K9A' relays in the sequencers. DCN DM3-S 403 93 added these relays. The text of the DCN was corrected to indicate that type 'GPCR' relays were to be installed and these were observed installed. The DCN included a mark up of Drawing 12179-2424.600-427 033 showing the relay to be a type 'GPCA."
Review Valid inve46d Needed Date inniator: Server, T. L.
O O
O triSee VT Lead: NA Anthony A r3 O
O 1/169e VT Mgr: Schopfer. Don K G
O O
ir2ase IRC Chmn: Singh. Anand K O
O O
t/22,e Dele:
- NAUD:
Date:
RESOLUTION:
Previously ident#Aed by Nu? O vos @ No Non Discrepent Condauen?O vos @ No Reso4ut'on Ponding7O vos (s)No Rosasuiian unr.ooevedtO vos (@ No Review Accepteble Not Acceptable Needeal Date VT Lead: Nerl, Anthony A VT Mgr: Schopfer Don K
- JChmn: Sm Anend K O
O Dele:
SL Comnente:
Pnnted 1/2Mie 12.57;10 PM Page 1 of I 4
Northeast Ut616 ties ICAVP DR No. DR MP34980 Millstone unit 3 Discrepancy Repoft Reveow Group: Accedent W4 phon DR VAUD Review Element: Operehng Procedure O vee r"
. :p Type: Procedure ;iih ^
gg oystemerecess: N/A NPC sientacance level: 3 Date faxed to NU:
Date Putdiohed. tr&9e twecrepancy: loconsistency in Translation of Design into EOPs Deecrepuen:
References:
EOP 35 E 3,' Steam Generator Tube Rupture" Rev.13, Effedive 10/3/95 UlR 1061, Reanalysis of Offsite Dose fro'm a SG Tube Rupture Accident for Ch.g.er 15 of the FSAR The ICAVP has reviewed the reference EOP as part of the verification of plant charadertstics important to ensure that safety analysis assumptions are appropriately implemented and maintained in accordance with the MP3 FSAR Chapter 15 accident analysis. As part of that review the following discrepancies were noted.
- 1) The E 3 procedure cites a 46-minute time for completion of the adions necessary to complete plant cooldown to cease the tube rupture break flow and terminate the release. it is cited in the purpose of the procedure and Indicated as consistent with the FSAR. The ICAVP team notes that the FSAR cites a 30-minute time period for this action and it,s associated offsite release assessment uses the 30-minute time for the rolesse duration.
- 2) The FSAR Indicates that the operator controls the ruptured steam generator at the steam generator relief valve setting. The E 3 procedure diiects the operator to control the ruptured steam generator at a pressure of 60 psi below the relief valve setting.
This inconsistency could cause an under prediction of the release from the RCS to the steam generator.
NU has identified in UlR 1061 that the affected safety analyses for the steam generator tube rupture need to be updated.
However, the assumptions and EOP inconsistencies identified above should be reviewed and factored into the safety analyses and, if determined to be appmpriate, coordinated with EOP revisions.
h.:ew Vaud invoud Needed Date initiatori eenneet, L A.
O O
O irises vit.aed: Rehele,Rel0 0
0 O
t'2see VT Mer Schopfer Don K O
O O
irmee m e en.n: sine. Anand K O
O O
tr22/se Date:
DNAUD;.
Dele-Prtnled tr13/9e 12.57AS PM Page 1 or 2
i Northeast Utilities ICAVP DR No. DRMP3 0940 Millstone Unk 3 Discrepancy Report RESOLUTION:
Prev 6ously hientelled by NUF U Yee T No Non D6ectopent Condneon?U Yee f No Resolut6on Pend 6ng?O vos @ No Reeoiuiion u<<eooeved?O vee @ No Review Acceptatha fact Acceptable Needed Date g,,
g VT Lead: Rehese,RWD O
O O
VT Mgri Schopfw, Don K iRC Chmn: Singh, Anand K Date:
SL Comments:
t Prtnied 1/231161257.M PM Page 2 0f 2
.w cr,
w
.~.--
{
l Northeast Utilities ICAVP DR N J. DR44P3-0M 1 4
Millstone Unit 3 Discrepancy Report e
Rev6ew Group: Acoktord Mangetson DR VALID Revlow Flament: Change Procese 06sciphne: 1 & C Design Om l
r"=-
ry Type: Wooneing Documort gg systemerecese: N/A MtC Tf m level: 3 oote faxed to NU:
Date Putdished: ir2@9e CF. ry: SGTR EOP Instruments Need to be Reg. Guide 1.97 Type A DeecrtPtion:
References:
EOP 35 E 3,' Steam Generator Tube Rupture", Rev.13, Effedive 10/3/95 MP3 Reg. Guide 1.97, Rev. 2 Basis Document MP3 FSAR Chapter 7.5 a
The ICAVP has reviewed the reference EOP as part of the verification of plant charaderistics important to ensure that safety analysis assumptions are appropriately implemented and maintained in accordance with the MP3 FSAR Chapter 15 accident analysis. As pa t of this verification the ICAVP reviewed the instrumentation necessary to ensure that the cooldown necessary to reduce the RCS pressure and minimize the release is initiated and appropriate for the actions ri described in the EOPs. It is noted that the entry criteaa for the E-3 EOP is based on the operator's review of the radiological conditions using the steam line radiation, condenser air ejector radiation or steam generator blowdown radistion monitors.
Given the importance of this diagnosis to the initiation of the cooldown actions necessary to mitigate a steam generator tube rupture in accordance with the applicable safety analysis for the plant, the ICAVP would have expected these monitors to be Reg.
Guide 1.97 Type A variables. A review of the MP3 Reg. Guide 1.97 compilance analysis and FSAR indicates that they are designated for monitoring only as Type E variables. This issue is of importance due the origirial compliance witt Reg. Guide 1.97 and the recent emphasis of diagnosis and response to steam generator tube rupture events to prevent overfill.
NU should address which, if any, of the identified Reg. Guide 1.97 Type A, Category 1 instruments has been designed to monitor this condition.
hev6ew Vend invalid Needed Dale instasser sennett.L A.
O O
O iratise VT l. sed: Rehele,ReiD Q
Q Q
ir21/9e VT Mgr: schoNer, Don K O
O O
ir22/se IRC Chrnn: singh, Anand K O
O O
si22/se Date:
INVAUD:
Dele:
RESOLUTION.
r T vm cal na.
- r" -
- c - - - 3 r T v-
<at p _
y
_s, m.
~ Printed 1/2398 f2.Se.31 PM Poes i or 2
l i
Northeast Utiinies ICAVP DR No. DW34981 wustone unit 3 Discrepancy Report w - a P"* m Ponding7O ve.
ri)u.
R.eoivo.a un, ev.drO v ri) it.
Review AC.*R N8 Not ACC8Ptable Needed Det.
g,; g VTLead: Rehop, Raj D VT Mgri Schopfer Don K L
IRC Chmrt $4ngh Anord K Dele:
SL Comments:
J l
l L
1 Northeast Utilities ICAVP DR No. DR44P3 4982 Minstorm unn s cita,repancy Report
]
DRVAUD ReWew Group: ConAguretton Rev6ew Element. Mod #caten tretalisten Dieciphne: Elmetcal De*"
O vee D6ectopency type: DW (N No systemeroceos: HVX NRC sagedacance level: 3 Dele faked to NW:
f Date Puhi6ehed 1/2598 Discrepancy: Differen*4 in installed conditions and Modification documentation (PDCR MP3 92103)
Deecript6on: This Modifichtk,,1 changed the start initiating circuits for HVR and SLCRS fans. Several anomalies in the described design and the current as-built plant could not be reconciled.
item 1 DCN DM3 S-1506-92 (page 6) Indk.ated that cable 3HVRCOC700 was to be wrapped with Sil Temp to resolve an apparent separation vlo!atlon. Field observation revealed that this cable was not wrapped, however, adjacent conduit floor sleeve was extended and no separation vlotation was observed.
No change documentation could be found to eliminate the requirement for wrapping of the cable.
Item 2 DCN DM3 S 1495 92 required the removal of wirirc, from TB-4, points 1 and 2 at Panel 3CES*1PNL120. The DCN was incorporated into revision 4 of panel drawing EE 3NV. The current revision of the drawing (Rev. 3) dot.s not show wires connected to these points and none of the outstanding change documents for the drawings add wires to these points. Contrary to this, a black wire is landed on point 1 and a white wire is landed on point 2.
Item 3 Changes required by this DCN DM3 S 1606-92 included: the removal of an intemal jumper from terminal block 3T71 and re-landed at point 7; and the relocation of an intemal jumper between 3T7 points 8 c.nd 9 to points 1 and 7. This DCN has been incorporated into the affected drawing (ES3PH) with the curTent revision (Rev.10) showing these changes. Field
-inspection found these changes not installed with the current field wiring as depicted in the 'before* diagram within the DCN.
Review vand invaad '
Needed Dele initiator: Server, T. L G
O O
sisses vT t.ed: Nwi.W A G
O O
usase VT Mgr: Schogh. Don K G
O O
ir2ose IRC Chmn: Slrgh, Anand K G
G O
t/22ss Date:
INVAUD:
Prned 1/239e 1M32 PM Page 1 of 2 i
--m,
Northeast Utilkies ICAVP DR No. DR MP34982 Millstone Unit 3 Discrepancy Report j
I g.
RESOLUTION:
Preyholy 16entofled by NU7 Q Yes
'Gif No Non Diacropent Constion?U Yes (S) No RM*M PenengtO Yes + No neo*uon var **.dtO Ya @ No l
Review
%, ""- Not M ;' "- Needed Date O
O O
VT Lead: Nort, Anthony A VT BAgt: Schogder. Don K IRC Chmn: Singh. Anand K Date:
SL Commerds:
ff
l Northeast Utilities ICAVP DR No. DR MP3-0943 ministone Unit 3 Discrepancy Report neveew oroup: syssen DRVAUD neview tiement: systen Demon O6et.ipune: Piping Dougn
, 3 y, DE. ry Type: Calculshon gg s- _ n = :HVX NRC"W:Me level: 3 Date faxed to NU:
Date Putd6ehed: 1/25/9s D w ereacy: Mounting detail qualification for ductmounted radmonttor can not be vertfied Descr6ption: Calculations for the qualification of pipe lines 3HVR 006 36 3, 3HVR 006039 3,3HVR 750-46 3 and 3HVR 750-49 3 could not be located. These lines are used to protect leak tight radiation monitor sample points in ductwork, The lines are identified on Sketches B 313A 5 and B 3138-6, Specification SP ME 573, Qualification of the connection of these lines to the ductwork, as shown on the above noted sketches, can not be verified.
Revtew Valid inval6d Needed Date init6elor: Preheeh, A.
O O
O trievee VT Leed: Nort, Anthony A G
O O
tr16Sd VT Mgri Schopfw. Don K O
O O
ti2oes IRC Chmn: Singh, Anand K O
O O
ir22ies Date:
INVAUo:
Date:
RESOLUTION:
Previovely identised by NU? Q Yee @ No Non D6ecrepent Condition?O Yee @ No madd% Pend 6ng?O vee
<W>se
= " % unreceiv.dr O vee (W)No Review
^ ^-: 7 "- Not Acceptelde Needed Date O
O O
VT Leed: Nerl, Antteny A VT Mgr: Schogder. Don K 1RC Chmn: S$, Anand K Dele:
SL Commente:
Pftted ti2v9e 101:29 PM Page 1 of 1
)
3
Northeas.t Utilities ICAVP DR No. DR-MP3 0984 j
Millstone Unit 3 Discrepancy Report Review Group: system DR VALlO
}
Review Element: Modifleetion Design Diecipane: Mocte.d Deel' O v.
Discreperscy Type: Calculation g
syseen./Prwe=: Dov.
NFC SegrJficence level: 3 Date faxed to NU:
Date Puthshed.1/25/98
(
Descrepeucy: Seismic test reports for equipment installed by plant modifications are not avtalab.e for review.
Deecript6an: The selsmic test reports listed below are identified in the associated PDCRs as the basis for the seismic qualification of the equipment installed by plant modifications. These raports were requested on Request For Information M3-RFI-00827.
ICAVP Response Form M3 lRF 01312 provided the purchase documentation (purchesse orders, certificates of compliance, etc.)
for the subject equipment; however, the seismic test reports wre r.ot available. Therefore, the seismic test reports can not be reviewed for complitnce to the seismic requirements of the applications identified in the POCRs.
i Modification No.: PDCR# MP3-86-334 Equipment:
GE Model12SFF31A1A Relays Location:
Panels 3EGS*PNLA/B Test Report No.: GE Report No. MIL **' '
1 Modification No.: PDCR# MP3-87 Equipment:
nAodel No.
. *. va A Relays Location:
d Switchgear Test Report No.: N.S Report No. 22650-87N Modification No.: PDCR# MP3-94-006 Equipment:
Westingt'ouse V46D47T45C Transformer Locatic,r:
Panels 3EGS*PNLA/B Test Report No.: NTS Report No. 00318-94N neview Velid involie Needed Date initiator: Johnson, Jay Q
Q Q
t/19/91 VT Lead: Nerl, Anthony A G
O O
5/18'S8 VT Mgr: schopfer, Don K G
O O
sr2orse IRC Chmn: sin 0h, Anant; K G
O O
i/22/9e Dele:
INVALT*:
Dein; RESOLUT oN:
Previously identleed by Nu? (,) Yes
(*) No Non Discrepent condition?(.) Yes (Gi) No necoiuiionPenene?O Ya @w neemtian uar=oived70 Y=
@ No n.vi Acceptable Not Accepteins Needed Date mp, g b
VT Lci. Nort, Anthony A
- ~T Mgr: schopfer Don K--
0 0
G Prinsed 1/23/9e 1:022c P'm Page1 or 4
- Northeast Utilities ICAVP DR No. DR MP3 0944 Millstone UnN 3 D!screpancy Report O
O
..,.~,-,-,m IRC Chmn: Singh, Anori K O
O O
Date:
SL Comments:
E r
i l
4 1
1 PrNed 1/23961:0227 PM
%2W 2
Northeast Utilities ICAVP DR No. DR MP3 0986 Milletone Unit 3 -
Discrepancy Report Review Group: Programmetc DR VALID Rev6ew Element: Correct #ve Action Procces g
Diecipline: CaJwr O y=
CW, my Type: Corrective Acton implementaten gg SystemProcess: DOX NRC signiecance level: 4.
Date faxed to NtJ:
Date Putdished: tr2SSe W'y: Unresolved item Report (UIR 259) Closure Deweletion: UIR 259 and Action Request AR 96007628 discuss a required change to operating procedure OP3346A and an updste to the FSAR, ACR M3-96-0186 was generated to revise the operating procedure however no action was taken to update the FSAR as described nor is there any documented evidence to support that an FSAR update was not required.
Review Volid invalid W
Date 0
O siteSe intuator: Neverro, Mark 0
0 ir2i/se VT Lemi: Ryen, Thomas J VT Mgt: Schopfer, Don K Q
O O
'r22ise O
tr22ise IRC Chmn: Singh, Anand K Date:
INVALID:
Dele:
RESOLUTION:
Prov'ously klontified by nut Q Yes (#1 No NonD6errepentCondition?O Yes (#) No PM%Pending?O vos @ No ResolutionUnresolved?O ves @ No Review Acceptable Not Acceptable Needed Date VT Leed: Ryan, Thomes J VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K Date:
SL Coi.unente:
I l
1 PrN 1r23/Be 1Mo7 PM Pe0s 1 of 1
Northeast Utilities ICAVP DR bh. DR-MP3-0946 4
Millstone Unit 5 Discrepancy Report Remw oraup: system onvAuo Re*w Element: Modificaten Design g
er
.. Mechence Deegn O va DL, _ _ y Type: C**
gg Si = T.'-
!NEW NRC tignWicance level: 3 Date faxed to NU:
Date Pubished: 1/25/96 D6ecropency: Calculation P(B) 1001, Rev 0 CCN 3 and CCN 4 Dacription: During review of Calculallon Change Number 3 and 4 to calculation P(B) 1001, Rev. 0 ' Heat Leads for the ESF Building Emergency HVAC Systems' the following discrepancies were identified:
Calculation Change Number 3:
- 1) On page 6, data item #1; a sump water temperature of 215'F based on reference 5 (calc US(B) 356, Rev.1) is used. This is in conflict with the 260'F sump water terr.perature stated in Safety Evaluation S3-EV 97-0045 prepared for DCR M3 96054,
- 2) On page 6 & 7, data item #2; uses a 230*F water temperature downstream of the safety injection pumps. This does not agree with page 92 of reference 5 that states that the temperature downstream of the safety injection pump is 240 'F.
- 3) On page 7, assumption #2; assumes that piping temperature will approach 230'F. This does not agree with the 260*F stated in 3afety Evaluation S3-EV 97-0045 item 1.1
- 4) Page 8, piping heat losses need to be recalculated using the higher pipe temperatures noted in Safety Evaluation S3-EV 0045.
- 5) Page 8, calc for 10" line with 1.5" of encapsulated insulation and 8" line with 2" of encapsulated insulation; states room temperature is 120*F but uses room temperature of 110'F when adjusting heat loss.
- 6) Page g, item 7 & Table 5; Heat gain of 14,430 Btu /hr for ACUS 2A/B fan heat gain (page 65 of original calc) needs to be added to totals shown in Table 5 for rooms 1 A & 1B Calculation Change Number 4:
- 1) On page 5 of CCN, item 2; the CCP leaving RHS heat exchanger water temperature of 142*F does not agree with reference 3 (SGCS Calc #95-052 Rev A). With a 115 'F CCP temperature entering the RHS heat exchanger, the leaving tcmperature is approximately 150 *F. The 142*F temperature used in the calculation appears to be based on a 10g - 110 'F CCP temperature.
- 2) On page 6 n' CCN, a two foot floor thickness was used for area 4E. Drawing EC-328 7 shows the floor thickness as three feet. Using the three foot thicknes increases the R value and reduces th; heat transfer thru the floor.
Eqted 1123/981 o3At PM Page1 of 2
Northeast Ut:16 ties ICAVP DR No. DR-MP3-098',
Millstone Unit 3 Discrepancy Rapoft
- 3) Or. page 6 of CCN, a value of 0.68 was used for the siirface condudance (still air film) for the wall and floor, it should have been used only for the wall, The surface conductance (still air film) for hast flow down thru the flo ar is 0.92. This increases the R value and reduces the heat transfer thru the floor.
- 4) Calculation assumes a grcand temperature of 50 'F. Based on review of average earth temperatures on page 11,4 of the 1991 ASHRAE Applications handbook, a ground temperature around 70'F would be a more appropriate assumption. This reduces the available temperature difference from 54 to 34 'F for a 1047 room design temperaturn,
- 5) Page 5 of CCN refers to a Reference 5. There is not a reference 5 identified in the reference section of the CCN.
- 6) in Table 3 for the 1rt 24" line in room 2A and 28, the linear foot factor from Table 2 should be 6.283 instead of the 6.383 used.
Meview VeEd invalid NW D Ae initiator: Stout, M. D.
O O
O i2orse VT Lsad: Nerl, Ateeny A G
O g
1/2 ires vT u r: Schopfer. Don K G
O O
5/::/88 e
inC Chmn: sine, wndx G
O O
t/22ise Date-IWALID:
Date:
nE80LUT10N'
~
Pr.viously identined by Nu?
(,, -
@ No NonDiscrepentCondition?() Yes @ No p % P.adian?O vos @ No ReeddionUnreedved?O vos @ No n.vi e Nw a:ce N d,
Dei.
.y VT Leed: Nort, Anthony A VT Mgr: Schopfer, Don K 1RC Chmn: Singh, Anand K g.
O O
Date:
SL Comments:
Printed Ic29e 1:o3.50 PM Pege 2 of 2
^l
Northeast Utilities ICAVP DR No. DR-MP3-0029 Millstone Unit 3 Discrepancy Report Rev6ew Group: System DR RESOLUTION ACCEPTED Rev6.w Eisnene syoien Dwon
,,,,,,,,,op,,,,,y,,,,,
Diecipline: MecherucW DWgn g y,,
cW xy Type: C&deuon O No Systenprocess: sWP NRC SignsAcance levoi: 3 Date faxed to NU:
Date Published: E'11/97
[
D6ecrepancy: Service Water Pumphotse Ventilation Calculation Discropancy Deecrt tion: The following calculations were reviewed to verify that the P
correct heat load from the service water pump motors were used in determining the service water pump room ventilation requirements:
Calculation P 198 Rev. O, dated July 10,1973, Ventilation -
Circulating & Service Water Pump House Calculation P(B)-901 Rev. O, dated 12/14/83,3HW*FN2A/28 Cycling Frequency Calculation P(B) 920 Rev. O, dated 12/14/83, Recommended Period of Operation of the Service Water Pumphouse Ventilation Recirculation Mode Calculation P(B)-925 Rev. O, dated 12/14/S3, Service Water Pumpi:ouse Ventilation Requirements The rev'sw ' identified the following descrepancies:
- 1) Calculation P-198 used 800 hp foi calculating the heat loss frem one service weter pump motor. Plant Design Data System (PDDSS data for service water pump 3SWP*P1 A and 3SWP*P1B states that the motor rating is 600 hp v1th a brake HP requirement of 5.8.5 hp.Two pumps operate per. LOCA per FSAR section 9.2.1.2 while the calculation only considered one operating. This would resu't in higher than calculated heat loss to the pump room imm the service water pump motors.
Calculation P(B)-901 Indicates that P(B)-906 supersedes calculation P-198, However, calculation P-198 is still sh7sn as an active calculation in the calculation database and P(B)-906 has been superseded by P(B) 925.
- 2) Calculation P(B)-901 considered only one pump operating with a bhp of 561, Two pumps operate post-LOCA per FSAR section 9.2.1.2 which would result in higher thaa calculated heat loss to the pump room from the service water pump motors.
- 3) Calculation P(B)-920 considered only oe pump operating while two pumps operate post-LOCA per FSAR section 9.2.1.2
- 4) Calculation P(B)-925 used motor load values from calculation P(B)-901 which only considered one pump operating. Per FSAR Section 9.2.1.2, two pumps on the same division are required to operate post-LOCA.
The discrepancy is assigned a significance level 3 because the discrepancy may result in a higher Servive Water Pumphouse p?"') =0-'!0mp0=!=0 th0n th0 d d;;n M& t0mpc=gth w 2 p
,g
[
Northaast Utilities IC/sVP -
DR No. DR-MP3 0029 Millstone unk 3 Discrepancy Report required to support the SWP equipment operation, Review Valid invalid Needed Date initietor: stout, M. 0; O
O O
8S7 VT t.eed: Neri, Anthony ^
O O
O er497 VT Mor: schopfw, Don K O
O O
iv8/S7 ptC Chmn: singh, Anand K Q
Q IVS97 Date:
eNALID:
Dele: 1/14/98 REs0LUTION: NU has concluded that Discrepancy Report DR MP3-0029 has identified a condition not previously discovered by NU which requires correction.
The calculations will be revised to correct this condition.
Condition Report (CR) M3-97 3283 was written to provide the necessary corrective actions to resolve this issue Based upon a preliminary Engineering Evaluation which considered the additional heat load from a second purnp in conjunction with the lower BHP requ:rement, there exists a sufficient ma' gin in the ventilation system to support the preliminary conclusion that the system will meet its design requirements. Once the calculation have been finalized a supplemented response will be provided confirming the results. NU concurs that until further analysis is completed and evaluated, this is a Significance Level 3 discrepancy.
Prevtaust/Identined by Nu? Q Yes @ No Non Discrepent Condition 70 Yee @ No Resolutien Pending7@ Yes O No Resoiuiionune.conved70 Yes C+)No Review
- P'* * "*' #***P'* *
"**d*d Instietor: stout M. D.
B C
D VT Lead: Neri, Anthony A VT Mgr: schopfer, Don K IRC Chmn: sin 0h, Anand K Date:
1/14/98 st Comments: Determination of final significance levelis pending completion and submittal of calculation and supplemental response from NU.-
~
Prtrfd 1/239e 11:30 Oe AM Page 2 of 2
i V,
Northeast Utilities ICAVP DR No. DM-MP3 0115 Millstone Unit 3 Discrepancy Report Review oroup: Act,4 dent Mitqp.tson DR RESOLUTION ACCEPTED Review Element: system Design Diecipune: Meewwcel D*'
O vee 06ecrepency Type: Ucensing Documert gg S,: 3 - m N/A NRC significence leval: 4 Date faxed to NU:
Date Publ6shed: 9/11/97 a
D6screpency: Containment Purge Isolation Valve Closure Time Discrepancy in Technical Requirements Manual Descript6on: In our review of FSAR Section 15.7.4.2.2, FSARCR 97-MP3-4, and Technical Requirements Manuel a discrepancy in the 9
containment purge Isolction valves 3HVU*CTV32A/32B/33A/333 closure time was noted.
FSAR Change Request FSARCR 97 MP3-4 increases the required containment purge isolation valve closure time from the value of 3 seconds given in FSAR Section 15.7.4.2.2 and FSAR Table 6.2 65 to less than or equal to 3.89 seconds. This increase in required valve closure tims is incorpora'ad in the purge isolation time presented in the Technical Requirements Manual (TRM) Section 3TRM 3.3.2 (page 5 of 6)
TRM Table 3.6.31 (ptge 5 of 9) of the Technical Requirements Manual, which references FSAR Table 6.2 65, Indicates a required valve closure time of 3.0 seconds.
Rev6ew vond Invend Needed Date inittetor: t'ane. T. J.
8 O
O
- S7 VT Lead: Reheje. Rei D G
O O
S*S7 VT Mgr: Schopfer, Don K G
O O
seslor IRC Chmn: Singh, Anand K 8
O O
SSS7 Date:
g INVALID:
Date: 12/8/g7 RESOLUTION: Disposition:
NU has concluded that the issue repoded in Discrbpancy Report.
DR MP3-0115, does not rcpresent a discrepant condition. TRM Table 3.6.3-1 has been changed, effective 8/27/97 (Revision 6) prompted by continuing revisions to the calculation. The change eliminated the stroke time column.
Note 3 cf Revision 4 indicates that the stroke time value is the surveillance limit (see attached copy of 3613F.21) and may be more limiting than other documents.- TRM-3.3.2 is a clarification of response times for Tech Spec 3.3.2 ESF actuation signals, not the Surveillance limit.
This is not a discrepancy as the 3 second requirement of 3.6.3-1 is a surveillance limit set up to intentionally be more conservative than Tech Specs, TRM-3.3.2 and the FSAR.
Significance Level criteria do not apply here as this is not a Frtmed 1/23/9e 11:30:50 AM PeGe 1 of 2 l
l l
DR No. DR MP3 0115 Northeast Utilities ICAVp Milistone unN 3 Discrepancy Report discrepant condition
==
Conclusion:==
Nu has concluded that the issue reported in Discrepancy Report, DR MP3-0115, does not represent a discrepant condition. The time indicated on Revision 4 of TRM Table 3.6.31 is the stroke time surveillance limit which is intentionally more conservative than Tech Specs, TRM 3.3.2, and the FSAR. Significance t.evel criteria do not apply here as this is not a discrepant condition.
Previously identHled by NU7 (9) Yes Q ho Non D6screpent Condition?U vos (9) No n= muon P.nmae70 v.
@ No neaumum=*ed70 va @ No moview acc.panhaa Not Mr "
Needed Date VT Leed: Roheja. Raj D VT Mgr: schopfer, Don K NtC Chrnn: Singh, Anend K Date:
12/8/g7 sL comments: Based on the chronology of information provided by NU in response to this DR l' appears that the change to TRM Table 3.6.3-1 was approved as a Technical Requirements Manual change (6/27/97) subsequent to the completion of discovery.
Therefore, it was a discrepant condition which has been corrected, n
1 l
Printed il23/9e 11:30:58 AM Pa0e 2 of 2 l
e DR No. DR MP3 0300 Northeast Utilities ICAVP Millstone unit 3 Discrepancy Report DR RESOLUTION ACCEPTED Review Group: system Rev6ew Element: System Design p,,g g
Diecipline: Mechanical Design Ow CA ; ry Type: Component Date gg System / Process: Oss NRC sign 4Aconce level: 4 Date faxed to NU:
Date Published: 1o/26/97 D6ecr*P*acy: The plant design computer data base, PDDS, identifies discrepant component specification numbers.
DescripHon: ltem 1 The plant design computer data base, PDDS, identifies specification 009 for the quench spray pump design specification. However, specification 2214.802-044 through Revision 1 is found to be the applicable design specification.
Item 2 The plant desion computer data base, PDDS, identifies specification 2280.050-676 for t;1e containrilent recirculation system valves 3RSS*MOV38A B d6 sign specification. However, specificatior,2282.050-076 through Revision 1 is found to be the appilcable design specification.
Review Valid invalid Needed Date Inittetor: Feingold, D. J.
O Q
Q io/13S7 VT t. sed. Neri, Anthony A 8
O O
io'12'S7 VT Mgr: schopfer, Don K G
O O
'o'14S7 IRC Chmn: $1ngh, Anand K
'~
O O
to<2ii97 Date:
INVALID:
Date: 1/14/98 RESOLUTION. D{spositjon:
NU has concluded that items 1 & 2 Discrepancy Report, DR-MP3 0300, have identified conditions not previously discove.ed by NU which require correction.
l'em 1)
Specification 009 in the PDDS data base for the Quench Spray Pump requires correction. Specification 009, vendor name, and EQ make are for the Quench Spray Pump motor. Condition Report (CR) M3-97 3995 was written to provide the necessary corrective actions to resolve this issue. The approved Corrective Action Plan (CAP) for M3-97 3995 is attached. The data fields in the database have been corrected. PDDS database was updated via the PDDS package number PDOS-97-0431. No woric is required in the field.
Page 1 of 2 Printed 1/23/9811:31:46 AM
Northeast Utilities ICAVP DR No. DR MP3-0300 Milistone Unit 3 Discrepancy Report (Item 2)
Specification 2260,050-676 in the PDDS database for the containment recirculation system valves 3RS5*MOV38A,B requires correction. The specification should have been 2282.u50-676, the error was typographical. A Condition Report (CR) for M3-97-3995 was written to provide the necessary corrective actions to resolve this issue. The approved Corrective Action Plan (CAP) for M3-97 3995 is attached. PDDS database was updated via the PDDS package number PDDS-97-0431, No work is required in the field,
==
Conclusion:==
NU has concluded that items 1 & 2 Discrepancy Report, DR-MP3-0300, have identified conditions not previously discovered by NU which require correction.
Condition Report (CR) M3-97 3995 has been written in provide the necessary corrective actions to resolve both item 1 and item 2 documentation issues.The PDDS database has been updated via PDDS Package Number PDDS-97-0341 which did not affect field equipment.
Previously identHled by Nu? O vos @ No Non Discreperd Condition?Q vwe @ No Resolution Pending?O vos @ No ResoiuiionunreceivedtO vos @ No Review
~g=
Not Accogdable Needed Date MkF
, DJ O
O O
1"
f 1
Pitnted 17tW9611:3154 AM -
Pege 2 of 2
l Northeast Utilitier ICAVP DR No. DR MP3 0315 Millstone Unit 3 Discrepancy Report Review Group: system DR RESOLUTION REJECTED Review Element: System Desegn psecipaine: Meerwuces Design g y,,
Discrepancy Type: Cornponard Date O*
SystemProcess: HVX
- NRC Significance level: 3 Date faxed to NL' Date Published: 10/10/97 D6ecrepancy: SLCF.3 HEPA Filter Airflow Rating and Pressure Drop D**Cri uon: During review of the component data for the Cupplementary P
Leak Collection and Release System (SLCRS) filter units, 3HVR*FL 4A/38, a dt.wepancy regarding the design airflow and clean pressure drop for the HEPA filters was identified.
Specification 2170.430-L45 specifies an airflow of 8,500 cfm for the SLCRS filter unit.
Vendor drawing 2170.430-065-022 shows an airflow of 8,500 cfm for the SLCRS filter unit and that there are 6 HEPA filters in the unit.
FSAR Section 6.2.2.3 and Table 6.2-63 states that the SLCRS filter unit airflow is 8,500 cfm FSAR Table 6.51 states thr.t the SLCRS filter unit airflow is 9,500 cfm and that there are 6 HEPA filters in the unit.
Piping & Instrumentat!on Diagram EM-148E shows a 9,500 cfm
)
altflow for the SLCRS filter units l
FSAR Table 1.8-1, Regulatory Guide 1.52, paragraph C.3.d clarification states that the HEPA filters will be subjected to velocities recommended by the HEPA filter manufacturer which exceeds ANSI N509-1976 Section 4.3.1 requirements.
Specification 2170.430-065 identifies a 1500 cfm rated airflow for the HEPA filter which corresponds to a 9,000 cfm maximum airflow for the unit.
i FSAR Table 6.2-63 states that the clean HEPA filter pressure i
drop is 1.0 inches of water gauge (lwg). Specification 2170.430-i 065 and vendor drawing 2170.430-065-022 state that the clear, pressure drop is 1.15 Iwg. At the 9,500 cfm airflov shown on the P&lD the clean pressure drop will be higher due to increase in airflow above the rating conditions for the filter.
Review Valid Invalid Needed Date initiator: stout, M. D.
O O
O se24s7 VT Lead: Nort. Anthony A G ~
O O
S/25/S7 VT Mgt: Schopfer, Don K Q
O O
10/1/S7 1RC Chmn: singh, Anand K G
O O
5("$S7 Date:
INVALID-.
Printed 1/239e 11:32-43 AM Page 1 of 2
O Northeast Utilities ICAVP DR No. DR-MP3 0315 Millstone unit 3 Discrepancy Report o.a.: 12/16/97 REsOLinON: NU has concluded that Discrepancy Report, DR MP3-0315, has identified a condition previously discovered by NU which requires correction. This discrepancy was previously cocumented in OIR 159 and CR M3 97 2371 (approved corrective action plan attached). FSARCR 97-MP3-468 was initiated 7/30/97 to begin corrective actions. Not all corrective adions have been completed at this time but are required to be complete prior to restart. Corrective actions will be processed and tracked by AR 97018713 and will ensure that the FSAR is reviewed against the Equipment Gpecification, Operator Instruction Manual (OlM) (2170.430-065) and calculations and revised as necessary. The AR has been modir.ed to ensure that the items related to this DR are addressed. There is reasonable assurance that the engineering evaluation of the required changas will not impact plant operation. NU conc its with the significance level of this DR.
Previou.ty Id.ntl6.at by NU? OY
@ No Non D6.cr. pant Conddion?Q Y
@ No n oion.n P.adiaatO v
@m n duuanunr av.drO v
@ wo n.wi w
maiacc.pi.bi. u d.d om.
,,,, y, o, O
O O
12/iss7 yr %.
n,,,, % 3 VT M9r: schopfer, Don K IRC Chmn: Sin 0h, An.nd K Det.:
12/16/97 sL comm.nas: Disagree with NU's response that this is a condition previously identified by NU. AR 9600904101 Closure request (attached to the response) sta'es that the capacity af the filter unit is 10,000 cim. The 10,000 cfm capacity applies to the charcoal adsorber section in the filter unit. The maximum system altflow that the HEPA filters are rated for is 9,000 cfm (6 filters at 1,500 cfm each).
NU's response did not address the FSAR Table 1.81 discrepancy identified in the DR regarding exceeding the HEPA filter manufacturer's maximum recommended velo?,ity.
Prtre.d1/23Se11:32:51 AM Pag.2 of 2
[
o Northeast Utilities ICAVP DR No. DR MP3 0649 Millstone Unit 3 Discrepancy Report ReviewGroup system DR RESOLUTION REJECTED Review Element: system Coe40n g
Diecipline: Mecherscal Desgn g
D6ecrepency Type: Compored Oete O No System / Process: HVX NRC S6gnificance level: 3 Date faxed to NU:
Dele Published.11/697 D6ecropency: SLCRS and ABVS Filter Unit Adsnrbent Qualification Descr6ption: During review of the Supplementary Leak Collection and Release System (SLCRS) filter units 3HVR*FLT3A/3B and the Auxiliary Buliding Ventilation System (ABVS) exhaust filt:,r units 3HVR*FLT1 A/1B a discrepancy regarding the charcoN exisorbent face velocity for qualification testing was identified.
Per FSAR Table 1.8-1, Millstone complies with RG 1.52 Rev. 2
' Design, TeGg, and Maintenance Criteria for Engineered.
Safety-Feature Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants' regulatory position C.3.1 with the following exception:
The dwell time for the minimum 2 inches of the carbon adsorber unit is 0.21 sec. All filters use a 4-inch thick charcoal bed which exceeds the mir.. mum 2 inches recommended by R.G.1.52, Rev. 2. The additional 2 Inches will result in a dwell time of 0.43 sec.as a minimum. Carbon is purchased to Table 51 of ANSI N509-1980. Testing of the charcoalis based on a maximum face velocity of 46 fpm and a 2-inch thick bed.
Charcoal test results for purchase orders 904806 and 910825
~
state that the tests were conducted with a face velocity of 12.2 m/ min (40.2 ft/ min) instead of the 48 ft/ min face velocity stated in FSAR Table 1.8-1.
UlR 1073 a(* ~
W differences in the testing requirements between ANd,.
1976 and ANSI N509-1980. It does not address the higher face velocitied required for testing.
Review Valid invalid Needed Date initlatnt: stout. M. D.
O O
O
'S'2SS7 VT t sed: Nat. Anthony A G
O O
in2as7
'.; Mgr: schopfer, Don K Q
O O
16'3SS7 IRC Cisnn: singh, Anand K G
O O
10/31/S7
~
Dese:
1 HVALW>:
Date: 1/14/98 Resolution NU has concluded that Discrepancy Report, DR MP3-0589, has identified a condition previously discovered by NU which required correction. The closure request for UlR 1073 addresses the issue of the velocity criteria used for the testing of the subject charcoal. AITTS rid not inciude all of the information contained in the Closure Request. This information has since been included in AITTS AR 96033919-01 for reference.
ErtrE.d 1/23/9611:34:14 AM Pope 1 of 2 l
O,.
DR No. DR-MP3 0685 Northeast Utiliths ICAVP -
Millstone Unit 3 Discrepancy Report As stated in the closure request, although the current stocks of charcoal were initially tested at a face velocity of 40 FPM, routine surveillance testing, performed at a maximum face velocity of 48 FPM for all applications, has indicated the acceptability of the existing charcoal. Because the testing is completed on a representative sample, all charcoal from that procurement lot, includirg charcoal rtored in the warehouse, is validated.
Future procurement of charcoal will require Engineering review prior to ordering due to a HOLD against the stock code number (see attached printout from Material Information Management System, MIMS). This review will be done to the requirements of Specification 2170.430-065.
NU concurs with the significance level of this previously discovered DR.
Attachments:
UIR 1073 Closure Request M3-EV 970224 3614A.21, Auxiliary Building Filter Train A Charcoal Sample, completed 12/5/95 3614F.2-1, Control Room Filter Charcoal Analysis Train A, completed 3/7/96 3613D.15, Containment Filter Charcoal Analysis Train A, completed 8/12/96 3614C.21, Fuel building Filter Charcoal Analysis - Train A, completed 1/8/97 MIMS data printout:" Master Materials Catalog
- for stock code 0324180, Charcoal Preytounty idente8ed by NU7 O Yee le) No Non Discrepent Condeten?O Yes @ No Resolution Pending?O vee #> No aesoeuiwmunresoeved?O vos @)No Rev6ew initiator: stout. M. D.
VT Lead: Nort, Anthony A VT Mgr: schopter, Don K IRc Chmn: Smgh. Anand K Dete:
1/14/98 st.commente: Disagree with NU's response that the charcoal velocity discrepancy was fully addressed by the closure request for UIR 1073.
The Auxiliary Building Filter Train A Charcoal Sample Test (OPS Form 3614A.21) completed 12/5/95 used a test condition of 70%
Relative Humidity. ANSI N509-1980 Table 5-1 ' Performance Requirements and Physical Properties of (Unused) Activated Cart >on' requires a test condition of 95% Relative Humidity. This difference was not evaluated in Engineering Evaluation M3-EV-970224 Rev. O provided with NU's response.
Printed 1/23,9e 11:34 22 AM Page 2 or 2