ML20198T265
From kanterella
Jump to navigation
Jump to search
ML20198T265 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 05/27/1986 |
From: | Bailey J GEORGIA POWER CO. |
To: | |
Shared Package | |
ML20198T209 | List: |
References | |
PROC-860527, NUDOCS 8606110387 | |
Download: ML20198T265 (906) | |
Similar Documents at Vogtle | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217G6571999-10-13013 October 1999
[Table view]Proposed Tech Specs Pages,Revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2 ML20217B1221999-10-0404 October 1999 Proposed Tech Specs Pages,Revising TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 Re Prestressed Concrete Containment Tendon Surveillance Program ML20212F4891999-09-22022 September 1999 Proposed Rev to TS SR 3.8.1.13,to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5511999-08-30030 August 1999 Proposed Tech Specs,Raising Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7281999-08-26026 August 1999 Proposed Tech Specs Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be in IAW with Versions of LCO 3.0.4 & SR 3.0.4 as Noted in Rev 1 to NUREG-1431 ML20211E9111999-08-24024 August 1999 Proposed Tech Specs,Relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3181999-05-18018 May 1999 Proposed Tech Specs SRs 3.8.1.3 & 3.8.1.13 Reducing Loading Requirements for DGs ML20205S3791999-04-19019 April 1999 Proposed Tech Specs Revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS Instrumentation ML20205Q7901999-04-13013 April 1999 Proposed Tech Specs,Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as Appear in Rev 1 to NUREG-1431 ML20154M9961998-10-15015 October 1998 Proposed Tech Specs,Deleting & Modifing Conditions Which Were Issued with Licenses That Are Now Obsolete ML20151U2011998-09-0303 September 1998 Proposed Tech Specs Pages for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Source Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236R4661998-07-13013 July 1998 Proposed Tech Specs Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protected Channels ML20154Q8611998-06-30030 June 1998 Proposed Tech Specs Bases Since Implementation of Improved TS on 970123 Through Aug 1998 ML20206N3131998-06-30030 June 1998 Proposed Tech Specs Re Replacement of Nuclear Instrumentation Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236F1631998-06-26026 June 1998 Proposed Tech Specs Revising LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20248K5801998-05-25025 May 1998 Rev 1 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20247K5041998-05-15015 May 1998 Proposed Tech Specs Pages Revising New Program 5.5.18 to Extent That Items B,C & D. Refer to LCO Action Statement & Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9471998-05-0808 May 1998 Proposed Tech Specs Section 5.5.7, RCP Flywheel Insp Program, Specifying Alternate Flywheel Insp Once Every Ten Years ML20216J4971998-04-16016 April 1998 Proposed Tech Specs 3.3.1 & 3.3.2 Re Reactor Trip Sys & ESFAS Instrumentation ML20199E5351998-01-27027 January 1998 Complete Replacement of All Typed Pages of TS Changes Submitted in Ltr LCV-0849-E ML20199A4131998-01-22022 January 1998 Proposed Tech Specs Adding Conditions for DG for Extended DG Completion Time of Fourteen Days ML20198P6961998-01-16016 January 1998 Revised Spent Fuel Pool Boron Dilution Analysis ML20216B2621997-12-11011 December 1997 Rev 14 to ODCM, for Vogtle Electric Generating Plant ML20199G3901997-11-20020 November 1997 Proposed Tech Specs Facilitating Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20199J6651997-11-20020 November 1997 Proposed Tech Specs Pages Changing Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Revising Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20211N2451997-10-10010 October 1997 Proposed Typed Tech Specs Pages,Revising Credit for Boron & Enrichment Increase for Fuel Storage ML20217H9051997-08-0808 August 1997 Proposed Tech Specs Pages Re Credit for Boron & Enrichment Increase for Fuel storage.W/marked-up Pages ML20141A8541997-06-13013 June 1997 Proposed Tech Specs Revising LCO 3.4.10 to Reduce Nominal Set Pressure by 1% to 2460 & Increase Tolerance to +2% ML20148E6481997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Pump IST Program ML20148E6611997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20133L3081997-01-10010 January 1997 Proposed Tech Specs Table 3.3.1-1 Re Amends 96 & 74 ML20140J4591996-12-13013 December 1996 Rev 11 to ODCM for Vogtle Electric Generating Plant, ML20138F1001996-12-13013 December 1996 Revs 10 & 11 to ODCM, Part 2 ML20132C4711996-12-12012 December 1996 Proposed Tech Specs Re Physical Security & Contingency Plan ML20134J9841996-10-0808 October 1996 /Unit 2 Fuel Assembly Insp Program ML20117N5851996-09-13013 September 1996 Proposed Tech Specs 3.8.1 Re AC Electrical Sources ML20129A6461996-09-11011 September 1996 Proposed Tech Specs,Providing Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator ML20117C4151996-08-23023 August 1996 Proposed Tech Specs to Convert Units 1 & 2 Based on NUREG 1431 ML20117N6361996-06-17017 June 1996 Proposed Tech Specs,Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20117N6471996-06-17017 June 1996 Proposed Tech Specs Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20111A5501996-05-0606 May 1996 Proposed Tech Specs,Incorporating Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available ML20106H2391996-03-31031 March 1996 Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan ML20101D4151996-03-0505 March 1996 Proposed Tech Specs Re Conversion Based on NUREG-1431 ML20100G0371996-02-19019 February 1996 Proposed Tech Specs Based on NUREG-1431 ML20097A3171996-01-30030 January 1996 Proposed Improved TS Based on NUREG-1431 ML20096G8241996-01-22022 January 1996 Inservice Insp Program, for VEGP-2 ML20095J2501995-12-22022 December 1995 Proposed Tech Specs,Allowing Use of Option B of 10CFR50,App J for Type B & C Testing ML20094N4071995-11-20020 November 1995 Proposed Tech Specs,Converting Existing TS to Format & Content of NUREG-1431 ML20093K2281995-10-16016 October 1995 Proposed Tech Specs,Adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J & Using Guidance of RG 1.163,Rev 0 ML20098C1471995-10-0202 October 1995 Proposed Tech Specs,Allowing Next Type a Test to Be Rescheduled 1999-09-22 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20248K5801998-05-25025 May 1998
[Table view]Rev 1 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20216B2621997-12-11011 December 1997 Rev 14 to ODCM, for Vogtle Electric Generating Plant ML20148E6481997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Pump IST Program ML20148E6611997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20140J4591996-12-13013 December 1996 Rev 11 to ODCM for Vogtle Electric Generating Plant, ML20138F1001996-12-13013 December 1996 Revs 10 & 11 to ODCM, Part 2 ML20134J9841996-10-0808 October 1996 /Unit 2 Fuel Assembly Insp Program ML20106H2391996-03-31031 March 1996 Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan ML20096G8241996-01-22022 January 1996 Inservice Insp Program, for VEGP-2 ML20078A3771994-05-12012 May 1994 Vols 1 & 2 of Vogtle Electric Generating Plant Unit 1 Readiness Review Module 4 Mechanical Equipment & Piping Program ML20069L8241994-03-30030 March 1994 Rev 8 to ISI-P-008, Inservice Test Program for Vogtle Electric Generating Plant Unit 1 ML20069L8311994-03-30030 March 1994 Rev 5 to ISI-P-016, Inservice Test Program for Vogtle Electric Generating Plant Unit 2 ML20082V2871994-01-0101 January 1994 Offsite Dose Calculation Manual, Rev 9 ML20064C7471993-11-0505 November 1993 Rev 6 to ISI-P-014, ISI Program for Vogtle Electric Generating Plant Unit 2 ML20064C7431993-11-0505 November 1993 Rev 6 to ISI-P-006, ISI Program for Vogtle Electric Generating Plant Unit 1 ML20035F5601993-04-0505 April 1993 Rev 5 to Inservice Insp Plan (ISI-P-014) for Vogtle Electric Generating Plant,Unit 2 ML20035F0721993-03-22022 March 1993 Rev 7 to Inservice Test Program (ISI-P-008) for Vogtle Electric Generating Plant,Unit 1 ML20094K1781992-03-0404 March 1992 Rev 3 to Vogtle Electric Generating Plant Process Control Program ML20092G7441992-02-20020 February 1992 Undated Draft Site Safety Manual. Supporting Documentation Encl ML20094K1721991-12-31031 December 1991 Draft, ODCM for Vogtle Electric Generating Plant ML20086Q7231991-12-0404 December 1991 Rev 7 to Procedure 91202-C, Activation & Operation of Operations Support Ctr ML20091L7891991-07-0303 July 1991 Rev 5 to Procedure 29537-C, Outage Scheduling ML20079G4971991-06-10010 June 1991 Rev 5 to ISI-P-006, Inservice Insp Program for Vogtle Unit 1 ML20079G5071991-06-10010 June 1991 Rev 4 to ISI-P-014, Inservice Insp Program for Vogtle Unit 2 ML20091L7991991-04-22022 April 1991 Rev 6 to Training Lesson Plan LO-LP-39201-06-C, Introduction to Ts ML20091L7771991-04-17017 April 1991 Rev 21 to Procedure 10000-C, Conduct of Operations ML20129J0311990-09-18018 September 1990 Rev 4 to Procedure PTDB-1 Tab 8.0, Pictorial Aids. Supporting Documentation Encl ML20043H3091990-06-15015 June 1990 Rev 3 to ISI-P-014, Inservice Insp Program. ML20043B6381990-05-22022 May 1990 Rev 2 to ISI-P-016, Inservice Testing Program ML20043B6321990-05-22022 May 1990 Rev 5 to ISI-P-008, Inservice Testing Program ML20091L8131990-05-22022 May 1990 Outdated Rev 0 to Training Lesson Plan RQ-LP-63107-00, Requal Current Events ML20113G6141990-05-15015 May 1990 Rev 0 to VEGP-22981-C, Calcon Pneumatic Temp Sensor Calibr 1TSH-19110-1TSH-19119,1TSH-19146,1TSH-19153,2TSH-19110- 2TSH-19119,2TSH-19146 & 2TSH-19153. Supporting Documentation Encl ML20034C1061990-04-26026 April 1990 Rev 4 to Inservice Insp Program First 10-Yr Interval ML20129H9081990-04-16016 April 1990 Rev 3 to Procedure PTDB-1 Tab 8.0, Pictorial Aids. Supporting Documentation Encl ML20129G8451990-04-0505 April 1990 Rev 19 to Procedure 14980-1, Diesel Generator Operability Test ML20129F7161990-03-29029 March 1990 Rev 2 to Procedure T-FND-90-15, Method Visual ML20092F9691990-03-28028 March 1990 Rev 0 to T-ENG-90-15, Unit One Train a DCP 88-V1N0070 Sequencer Functional Test. Supporting Documentation Encl ML20092F8621990-03-28028 March 1990 Rev 1 to Procedure T-ENG-90-11, A-Train Undervoltage Test ML20092F7521990-03-27027 March 1990 Rev 20 to 13145-1, Diesel Generators ML20092F8481990-03-25025 March 1990 Rev 2 to Generator & Engine Control Panel Functional Test Procedure 27563-C, Power & Signal Removal/Replacement Data Sheet ML20092H0391990-03-23023 March 1990 Rev 16 to VEGP-10000-C, Conduct of Operations ML20092F5271990-03-21021 March 1990 Data Sheet 1 to Rev 12 to VEGP-10006-C, Reactor Trip Rept. Supporting Documentation Encl ML20092F7341990-03-19019 March 1990 Rev 16 to Procedure 25717-C, Torquing Electrical Type Connections ML20092G9111990-03-16016 March 1990 Abnormal Operating Procedure to Rev 7 to VEGP-18028-C, Loss of Instrument Air ML20092F6901990-03-16016 March 1990 Rev 7 to Procedure 18019-C, Abnormal Operating Procedure, Loss of Rhr ML20092F6361990-03-12012 March 1990 Temporary Change Notice to Rev 14 to Procedure 12007-C, Refueling Entry ML20092F8281990-03-12012 March 1990 Simulator Exercise Guide to Rev 7 to LO-SE-60019-07-C, RHR Operations W/Malfunctions ML20092G7151990-03-11011 March 1990 Rev 18 to VEGP-13011-1, RHR Sys. Supporting Documentation Encl ML20092H7831990-03-0909 March 1990 Rev 9 to 20427-C, Maint Cleanliness & Housekeeping Control ML20113G5631990-03-0808 March 1990 Rev 8T to 93240-C, Reactor Vessel Assembly/Disassembly Instructions. Supporting Documentation Encl 1998-05-25 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20198T265&oldid=4092227"