- ANDTDMDFT OF SOLICITATION / MODIFICATION LF ' CONTRACT .

  • 3 RFPA dtd 12/17/97 l
2. AMENDMENT / MODIFICATION NO. 3. EFFEC 11VE DATE 4. REQUlslil0N/ PURCHASE REO. No. 5. PROJECT NO.

(if applicable) >

10 12/31/97 RFPA RES 93 049 ,

6. ISSUED By CODE m 7. ADMINISTERED BY CODE I

- (if other than item 6)

" '-'"'*a b hi#MaMu"Y MS T=7 12

$- - "- a 7 Washington, DC 20555

8. NAME AND ADDRESS OF CONTRACTOR (No.,' street, county, State and ZIP code) 9A. AMENOMENT OF SOLICliATION WO.

Purdue Research Foundation ATINI ^'

EM ko b e3 Of f a M ;-. :. a C e -.. d._p*$1bMeseO*fraMVks3_ 98. CATED (SEE _ liEM 11) 1063 Frederick L. Novde Itall of Adeln.

West Laf ayette, IN - 47907 10A. M(XilFICATION OF CONTRACT /ORCit No.

X NRC-04-93 049 108. DATED (SEE ITEN 13; CG)E I FACllllY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS 1 The above nundiered solicitation is amended as set forth in item 14. The hour and date specified for recelot of Offers O is extended is nos extended. for to this hour and Of ferors ausf acknowledee recet e of this amendmentthe following metbt (a) By completi date specteted in the s,o itation or as amended one o Items 8 and 15, and return' ne ca y acknowl ne receipt of this amendment on copy of the effer sube tteW(c)p as By of sc the3 amendment!

rate letter or(b to enram iAlch i tudes a reference to the solicitation and amendment manners. FAIL % OF YOUR ACEMbWLEDeMENT TO BE RECEIVED Af THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE NOLA AND DATE MCIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offor alr otheit t such change may be made telegram or letter, provided each telegram or letter makes reference to t solicit lon and this amendment, and is received prior to the opening hour and date speciff ed.

12. ACCOUNilNG AND APPROPRIAil0N DATA (If re@ trod)

R&R N0: 86015211005 JCN L2202 BOC: 252A RES ID: RES C96 0M OBLIGATED AMOUNT: $185,000.00

13. THIS ITEM APPLIES ONLY TO MODIFlf e?ONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT /0RDER NU 24 DESCRISED IN ITEM 14.

A. TNis CNANGE ORDER is Issued PURSUANT T0 (Specify authority) THE CMANGES SET FDPIN IN ITEM 14 ARE MADE IN X THE CONTRACT ORDER NO. IN ITEM 10A. 52.243 2 ALT V B. INE ABOVE NUMBERED CONTRAC1/ ORDER IS MtIllFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as channes in paying of fice, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.1D3(b).

C. THis SUPPLEMENTAL AGREEMENT 15 ENTEREfe INTO PURSUANT TO AUTHORITY OF D. OTHER (Specify type of modification and authority)

I Mutual Agreement of Parties E. IMPORTANT Contractor O is not, fid is rowired to sien this document and return 2 copies to the issuins office.

14. DESCRIPil0N OF AMENDMENT /MODIFICAil0N (Organized by UCF section headings, includieg solicitation / contract subject matter where feasible.)

Modification follows on the attached pages.

9901270010 990116

  • i POR CONTR NRC-04-93-049 PDR , () {

Encept as provided heretn. all terms and conditions of the document referenced in item 9A or 10A, as heretofore ctianned. remains unchanced and in full force and effect.

'k'ciuisie$gIi'nN Mregg MP W prW W. WAME AND ME M CONHACHNG Om Op w Mnu Office of Research Administration Mary H. Maje/ Cot .racting Officer 158pi,IL FERC: 15C. DATE SIGNED 168. STA tS A 16C. ATE SIGNED x rue ** -- 'h ".

Siinatt of norsosi au;..,<sted to sien) p

  • h I gy b /

(Siebbturd hf Contrachne Of ficer)  !

IION 7' dim-01-152-8070 - 20-105 - [, ~ h d'r-nNFORd 3bRhv.10-83)

.PERV10Uti EDITION UNUBASLE Prescribed by GSA 1

FAR (48 CFR) 53.243 I  : .

! o

, , I,ll.

. - s l NRC-04-93-049 Mod. No. 10 Page 2 of 3 The purpose of this modification is to : (1) increase the contract ceiling by

$184,964.00 from $4.699.416.00 to $4.884.380.00. 2) provide incremental funding in the amount of $185.000.00 which increases the obligated amount from

$4.285,000,00 to $4.470.000.00.,(3) revised Task 6-under Subsection C.1.3.5-for a within scope change. (4) extend tha period of performance. and (5) authorization to purchase a 9GB hard drive. Accordingly, the following changes are hereby made:

1. Section B. 3. CONSIDERATION AND OBLIGATION--COST REIMBURSEMENT (JUN 1988) is deleted in its entirety.and replaced with the following:

"(a) The total estimated cost to the Government for full performance under this contract is $4.884,380.00.

(b) The amount presently obligated by the Government with respect to this contract is $4,470.000.00."

2. This modification provides 'or within scope change to'the Statement of Work in accordance wit 1 the contractor's proposal dated December 24.1997. As a result, the following change is hereby made to Subsection C.1.3.5. Scope of Work:

Revise Task 6 under Phase III in accordance with the attache, ,aodification to the Statement of Work.

3. Section F.6. DURATION OF CONTRACT PERIOD (MAR 1987) is deleted in its entirety and replaced with the following:

"This contract shall commence on July 26. 1993 and will expire on July 25. 1998."

'4, The contractor is hereby authorized to purchase a 9CB hard drive in accordance vith the attached email from Shripad T. Revankar dated 11/10/97.

Sufficient funds remain in the contract, therefore this purchase shall be done at no additional cost to NRC.

This modification obligates FY98 funds in the amount of $185,000.00.

f

NRC-04 93-049 Mod. No. 10 Page 3 of 3

- A summary of obligations for this contract, from award date through'the date of this action is given below:

Total FY93 Obligation Amount 5 465.000.00 Total FY94 Obligation Mount $2.570.000.00 Total FY95 Obligation Amount- $ 600.000.00 Total FY96 Obligation Amount $ Total FY97 Obligation Mount $ 650.000.00 Total FY98 Obligation Amount '

5 185.000.00 Cumulative Total NRC Obligation $4.470.000.00 All other terms and conditions remain the same.

OFFICE OF NUCLEAR REGULATORY RESEARCH DIVISION OF SYSTEMS TECHNOLOGY RFPA (FOR MODIFICATION TO NRC-04 93-049)

MT)iffrATifMS 1flTR TASK 6 Perform three combined-effects tests that cover three break sizes at different locations: (1) an equivalent 2" break at the reactor pressure vessel (RPV) bottom head with liquid break flow (the bottom drain line break test), (2) an equivalent 3" break at the RPV downcomer above the top of active fuel with initially liquid break flow followed by two-phase break flow (the Gravity-Driven Cooling System injection line break test), and (3) an equivalent 14" break at the RPV steam dome with steam break flow (the main steam line break test). All three tests wili begin at 150 psia when the break flow is initiated. The tests will be conducted for at least 8 to 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> to ensure that quasi-steady conditions in the RPV and containment og reached.

In addition, there should be one repeat test for each of the three tests to ensure the reprodue.ibility of the important phenomena and system behavior.

Since the purpose of this task is to provide low-pressure data for code mode l improvements, the contractor 1,hould identify models in the ex sting codes, such as RELAPS and TRAC-BWR, 8

and ensure that the tests will produce the data needed to assess and improve these models.

Prepare a comprehensive test data report that includes: (1) a desenption of the PUMA test facility, an instrumentation list indicating the status of each instrument during each test, data uncertainty for each operational instrument, and figures with dimensions showing the exact location of each instrument; (2) a description of each test and the initial test conditions; (3) the important phenomena and system behavior observed in each test; (4) code models for which improvements can be made using the data obtained for the task; (5) fqures, tables, or correlations to present the data tnat are needed for code model improvements; (6) conclusions and recommendations.

Task 6 should be initiated by January 1,1998, and be completed by May 31,1998.

e ,

oi A.,,

~~ ',

Y:?

From shripad Revankar <shripad@ecn.purdue.e&s>

To James Han <JTH1@nrc. gov >

Dates 11/20/97 4:57am subject: Request for the approval of purchase of 9GB hard drive for thePUMA computer (IBM RISC 6000)

Dr. Han, This is'a request for NRC approval of the purchase of 9GB hard drive for PUMA computer. We need to enhance current disc storage space to mecc the demands for the storage, data conversion and analyses of the PUMA test data. The following explaination gives justification for this nerd.

Storage requirement for data: Since the beginning of this year we have been conducting seperate effect and combined effect tests on PUMA facility. On separate effect tests, typically we have conducted 20 sets of runs for each tests. The single phase natural circulation and two-phase natural circulation tests have been completed. The data set for each run takes about 70 Mb space. Thus for one seprate effect test we require about 1.4Gb disc space. The integral test such as main steam line break requires total space of 1Gb for each test. The data are stored in xmgr format.

Current State: We have total of 3Gb space now with PUMA computer. Cne GD space is reserved for the system operation. Thus we have only 2Gb space for storage. We can not store two separate effect test data or two integral test data simultar. ecus because that needs more than 2Gb space. If we need to compare the two integral test data, currently we can not do it. We need to transfer the data to magnetic tape which takes 3-4 hours to complete the task each time we need to make space for new data set.

Thus we need more storage space on our PUMA computer as we are conducting more separate effect tests and integral tests. Fortunately the hard disc price recently have decreased substantially and t. hey have become more affordable. We have identified the hard disc with 9Gb at a price of $1011.

Purdue Engineering Computer Network (ECN) will help un purchase and install this disc. This hard disc will be sufficient for our current and future need of storage space on PUMA. We beleive the enhancement of disc storage space is necessary anc we would like to have your approval for securing the additional storage disc for the PUMA.

If you have any questions regarding this request please do not hesitate to >

contact me.

S.incerely Shripad T. Revankar Shripad T. revankar 1