Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps,
ML20198S604
Person / Time
Site: Oyster Creek
Issue date: 11/06/1997
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6730-97-2262, GL-97-04, GL-97-4, NUDOCS 9711140068
Download: ML20198S604 (2)


Text

p a e l

GPU Nutteer, let..

U s Route #9 south g

t orked vc NJ 087310338 Tel609 9714000 November 6,1997 6730-97-2262 U. S. Nuclear Regulatory Commission Atta: Document Controt Desk Washington DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generrting Station Docket No. 50-219 30 Day Response to Generic 1.etter 97-04; " Assurance of Sufficient Net Positive Suction licad for Emergency Core Cooling and Containment lleat Removal Pumps" On October 7,1997, the Nuclear Regulatory Commission issued the referenced generic letter regarding a safety significant issue which may have generic implications for degrading performance of the Emergency Core Cooling System and Containment Ileat Removal pumps.

The generic letter required, within 30 days, a written response indicating: a) whether or not the requested information will be subn itted; and b) whether or not the requested information will be submitted within the requested time period. By this letter, GPU Nuclear, Inc. is providing the required 30 day response.

GPU Nuclear, Inc. is participating in a newly established BWR Owner's Group (BWROG) effort which has the objective of reviewing current BWR industry net positive suction head (NPSil) calculational methodology and recommending a consistent approach for utility 90 day responses to the generic letter. It is expected that the information in the 90 day response will provide assurance to the Staff that NPSl{ issues are being adequately addressed. The BWROG established a dialog with the Staff prior to the issuance of the generic letter and plans to continue that interaction so that NPSil issues are properly addressed. GPU Nuclear, Inc.

intends to provide the 90 day response to the generic letter considering the recommendations resulting from the BWROG NPSil Committee, t

IMDA D

IIlllillllylllllI]llllll 9711140068 971106 "

PDR ADOCK 05000219 P

PDR;

--.n aa-6730 97-2262 Page 2 If any additional information or assistance is required, please contact Mr. John Rogers of my staff at 609.971.4893.

Very truly yours, 3

t

{Mc Michael B. Roche Vice President and Director Oyster Creek MBR/JJR cc: - Administrator, Region i NRC Project Manager Senior Resident inspector Sworn to and subscribed before me this ( M day of November 1997.

M u,/M. [( M/<It*

My commission expires:0<< u /a,.>oo, Notafy Public' U

DWWA M. OwSUWO i

IIUtler fullutM IIDy JMET gy m _

-e n aut P