Advises That Rev 23 to Radiological Emergency Plan Consistent w/10CFR50.47(b) & Requirements of 10CFR50,App E. NRC Approval Required for Any Changes Which Decrease Effectiveness of Plan
ML20198S542
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/04/1986
From: Weise S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8606100474
Download: ML20198S542 (2)


Text

-

hchd j JUN 0 41966 Docket Nos. 50-327, 50-328 License Nos. DPR-77, OPR-79 Tennesspe Valley Authority ATTN: VMr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SUBJECT:

DOCKET NOS. 50-327 AND 50-328 - SEQUOYAH NUCLEAR PLANT RADIOLOGICAL EMERGENCY PLAN REVIEW We have completed our review of Revision 23 of the Sequoyah Nuclear Plant Radiological Emergency Plan.

Our review indicated that the changes submitted for your Sequoyah Radiological Emergency Plan are consistent with the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan. However, if your safety review indicates no decrease in the level of emergency preparedness, then changes may be made without NRC approval . In all cases, you should furnish copies of each change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

Should you have any questions regarding this letter, please contact Mr. Thomas R.

Decker of our staff at 404-331-2600 or FTS 242-2600.

Sincerely, Stephen P. Weise, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: (See page 2) 8606100474 860604 fDR ADOCK 05000327 PDR

- LO IE 35

l Tennessee Valley Authority 2 cc: H. L. Abercrombie, Sequoyah Nuclear Plant Site Director

. R. Wallace, Plant Manager K. W. Whitt, Director, Nuclear

/.ManagersReviewGroup D L. Williams, Jr., Supervisor .

-Licensing Section I

. B. Kirk, Compliance Staff Supervisor J. E. Wills, Project Engineer bec:dJ. N. Grace eR. D. Walker

/H. R. Denton, NRR

. L. Thompson, NRR

. M. Taylor, IE B. B. Hayes, 0I

/S. R. Connelly, OIA

/G. G. Zech RC Resident Inspector ocument Control Desk VState of Tennessee i

l l

RI RII RII RII x0rHl.

eh: kap ecker DCollins BDebs 5/30/86 G5/30/86 5/3a/86 W/D/86

-_ _ _ _____--_-____ _-_-_-_-