ML20198R753
| ML20198R753 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/04/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20198R755 | List: |
| References | |
| NUDOCS 8606100197 | |
| Download: ML20198R753 (3) | |
See also: IR 05000424/1986040
Text
r
"
SAFEGUARDS INFORMATION
-
JUN 0 41986
Docket No. 50-424
License No. CPPR-108
.
Georgia Power Company
ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
INSPECTION REPORT NO. 50-424/86-40
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
A. Tillman on May 5-9,
1986.
The inspection included a review of activities
authorized for your Vogtle facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosure to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8606100197 e60604
ADOCK 0500
4
Virgil L. Brownlee, Chief
G
Reactor Projects Branci. 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report
(Safeguards Information)
ENCLOSURE CONTAINS
cc w/ encl: (See page 2)
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECO!3 TROLLED.
SAFEGUARDS INFORMATION
3-OY
\\
,
SAFEGUARDS INFORMATION-
~
-
4
Georgia Power Company
2
cc w/ encl:
R. E. Conway, Senior Vice President &
Project Director
D. O. Foster, Vice President, Project
-
Support
P. D. Rice, Vice President, Project
Engineering
R. H. Pinson, Vice President, Project
Construction
.
J. T. Beckham, Vice President &
General Manager - Operations
R. A. Thomas, Vice President,
Licensing
C. W. Hayes, Vogtle Quality
Assurance Manager
W. C. Ramsey, Manager -
Readiness Review
G. B. Bockhold, General Manager,
Nuclear Operations
L. Gucwa, Manager, Nuclear Safety
and Licensing
M. H. Googe, Project
Construction Manager
E. D. Groover, Quality
Assurance Site Manager -
Construction
J. A. Bailey, Project Licensing
Manager
,
cc w/o encl:
G. F. Trowbridge, Esq. , Shaw,
Pittman, Potts and Trowbridge
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
E. L. Blake, Jr. , Esq. , Shaw,
Pittman, Potts and Trowbridge
J. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
J. G. Ledbetter, Commissioner,
Department of Human Resources
C. H. Badger, Office of Planning
and Budget
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. C. Teper, Georgians Against
Nuclear Energy
M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
CONTAINS
ENGLOSU
NFOBgATION
SAFEGU
cc w/o enc 1:
(Continued see page 3)
ugos sg,ggATION TH
SAFEGUARDS INFORMm idg.
,co,130tteo.
-
St.FEGUARDS INFORMATION-
-
.
Georgia Power Company
3
JUN 0 41986
cc w/o encl:
(continued)
Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
G. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
B. P. Garde, Citizens Clinic, Director
Government Accountability Project
D. S. Read, General Manager,
Quality Assurance
bcc w/ encl:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
E. Reis, ELD
W. M. Hill, IE
M. Miller, NRR
W. Brach, ED0
M. Sinkule, RII
W. Rankin, RII
Document Control Desk, 0I6
NRC Resident Inspector
State of Georgia
-
RII
RII
RII
II
RII
<
A[m/
\\
iman:lb
WHR tin
MSi kule
VLBrownlee
er
06/'k/86
86
06/ /86
06/%/86
/
6
RII
I-
R
RII,
I
JS .f
M n ule
T
son
D
uire
x
r
06/ V/86
06/2/86
06 i /86
06y/86
/
6
j
ENCLOSURE CONTAINS
S AFEGUARDS INFOR!at.*U ^"
SAFEGUARDS INFORMATION
" " * " " ^ * " " "
PAGE IS DECONTROLLE.u.
1
--
--