Responds to NRC Re Violations Noted in Insp Repts 50-321/86-09 & 50-366/86-09.Corrective Actions:Personnel Counseled & Departmental Directive OPS-86-04 Re Proper Log Keeping Issued
ML20198R633
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/21/1986
From: Gucwa L
GEORGIA POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
1099T, SL-750, NUDOCS 8606100148
Download: ML20198R633 (2)


Text

f Georgia Fbwer Correany l

333 Piedmort Avenue Attanta Gacroia 30308 l

Teleptone 4d 52G 6526 sOf ox 545

, h **

b Atlanta Georgia 30302 Georgia Power L T. Gucwa N

  1. ^

Manager Nuclear Safety and Licensing 1099t May 21,1986 U. S. Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement RII: JNG Region II - Suite 2900 50-321/50-366 101 Marietta Street, NW Inspection Report Atlanta, Georgia 30323 86-09 ATTENTION: Dr. J. Nelson Grace Gentlemen:

The following information is in response to Inspection Report No, 50-321, 50-366/86-09 dated April 22, 1986.

The report concerns the inspection conducted by Messrs.

P.

Holmes-Ray, G.

M.

Nej felt and W.

C.

Bearden from February 22 to March 21, 1986, VIOLATION:

Unit 2 Technical Specification (TS) 6.8.1.a requires that procedures shall be implemented for Emergency Core Cooling Systems (ECCS) in accordance with Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978.

Contrary to the above, on February 25, 1986, the Core Spray (CS) system jockey pump, 2E21-C002A, was found in a turned "0FF" position rather than in its "AUT0/RUN" position, as required by procedure, 34S0-E21-001-2, Revision 0 This pump had been turned "0FF" on February 22, 1986, for oil addition, and equipment status change was not entered into the Plant Operator's Log, as required by procedure, 31G0-0PS-007-0S, Revision 0 This is a Severity Level V violation (Supplement I).

RESPONSE TO VIOLATION:

Admission or denial of alleged violation: The violation occurred.

Reason for violation:

This event occurred because of the failure of Operations personnel to maintain the Plant Operators Log current with regard to the status change of the Core Spray Jockey Pump.

8606100148 860521 PDR ADOCK 05000321 G

PDR i

k Georgia Power h U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 2900 May 21, 1986 Page Two RESPONSE TO VIOLATION:(continued)

Corrective steps which have been taken and the results achieved:

Involved personnel were counseled and a Departmental Directive (OPS-86-04) was issued which stresses the importance of proper log keeping, especially in the event of an equipment status change.

Corrective ste)s which will be taken to avoid further violations:

The above actions are sufficient to prevent recurrence.

Date when full compliance was achieved:

Full compliance was achieved on March 21,1986, when the Core Spray Jockey Pump was put back in operation.

If you have any further questions, please contact this office.

Sincerely, 47"4 -

L. T. Gucwa MJB/lc c: Georgia Power Company Nuclear Regulatory Commission Mr. J. P. O'Reilly Senior Resident Inspector Mr. J. T. Beckham, Jr.

Mr. H. C. Nix, Jr.

G0-NORMS 1099t 700775 i