- 312 269-6078 November 10,- 1997 ~
Project No. 9W 100:
- Docket No. 80 423 Northeast Nuclear Energy Company
- Millstone Nuclear Power Station, Unit No. 3 Independent Corrective Action Vestfication Program i
United States Nuclear Regulatory Commission Attention: Document Control Desk
- - Washington; D. C. 20555
- The Nuclear Regulatory Comr,)ission staff has requested that Sargent & Lundy (S&L) prepare and submit on the docket a report on the status and expected completion of the Millstone Unit 3
- ICAVP every two weeks. This report covers the period ending 11/07/97.
1 STATUS The slides normally used durin0 the monthly ICAVP status meetings have been updated to -
4
- provide the status through 11/07/97 and are enclosed. A summarf of that information is highlighted below:
Ilsr_1 Four of the five S&L Review Groups have work scope in the Tier 1 activities. The System Review Group (SRG) has essentially completed their review of the service water (SWP) and the containment spray systems (QSS/RSS), with the exception of the modifications. The additional
~ modifications and calculations for these systems that are currently being finalized by NU still i
need to be reviewed. - SRG work is progressing at an accelerating rate for the other sysiem -
groupings, HVX and DGX, and is approximately 46% complete. Similarly, the Confguration
' Review Group (CRG) has completed the walkdowns of the SWP and QSS/RSS syshns.- CRG
' activities are approximately 25% complete fv the HVX ard DGX system groupings.
t Operations & Maintenance and Toming Review Group (ORG)is also essentially P nplete with F
the SWP and QSS/RSS systems, with the exception of *he modifications discussed above.
- ORG is approximately 50% complete with the HVX and DGX system groupings.
t Programmatic Review Group (PRG) activities for Tier 1 include the corrective action document,g reviews and the recently added scope to review the Desi n Discrepancy Reports (DDRs). The 0
l
~
corrective action document review is approximately 95% complete; however two signifx: ant issues and their associated activities must be resolved and completed. As discussed in recent 9711130315 971110 PDR ADOCK 03000423 P
PDR 6
Q,1* n v I $5 East MYntce Street + CNcago, It. 60603 5700 USA
- 312.-269-2000 a
.1 n.
t'
+
Unite'd States Nuclear Regulatory Commission November 10,1997 Cocument Control Desk Project No. 9583-100 Page 2 conference calls with NU and the NRC staff, there are approximately 100 CA documents for w5ich NU has not completed their processing. This means that they are not currently available for S&L to review. S&L is currently revit wing this list of CA documents against the most recent NU 1CCFR50.54(f) response letter to verify how many of these documents are deferred until after restart. A discussion on how to handle the remainder with respect to the completion of the (ther Tier 1 activities will be held vdth the NRC Staff. The other issue involves the NRC's intent for S&L in review the implementation activities for certain types of the Tier 1 corrective actions, such as calculations, evaluations, modifications, and other similar engineering functions. S SL is corrently developing the scope of ti.is work and will respond to the NRC by the week of 11/17/97.
Tlie DDR review is in process and progresslag satisfactnrily.
Based on the above discussion the expected completica for the Tier 1 review activities is 12/15/97. Please note that as a result of the additional modifications on the RSS system, we no longer have a schedule difference on Wave 1 and Wave 2 syMems.
.TitL2 The Tier 2 review being performed by the S&L Accident Review Group (ARG) is essentially complete. Only three critical characteristics remain to be verified. They will be completed as soon as the remaining information from RFis 530 and 689 is received. We expect to be complete by 11/14/97 based on NU's schedule for providing the information.
Titta The Tier 3 review being performed by the S&L Programmatic Review Group (PRG) is also essentially complete. Some specific information on four RFis is expected this week and will allow completion by 11/14/97, However, there are also 11 CA documents from the NRC selected sample for which NU has not completed its processing, which may impact the completion date.
Discreoancy Reoorts The last three slides from the enclosed status summary provide details on the preliminary DRs, the NU provided rosolutions, and the S&L review of those resolutions, in addition, a chart is attached which tracks the DRs and the resolution rate.
SUMMARY
MILESTCNE SCHEDULE Tier 1 System Review Complete 12/15/97 e
Tier 2 Review Complete' 11/14/97 Tier 3 Review Complete 11/14/97 Final Report issue 01/26/98 e
i
7.
4 Unite' States Nuclear Regulatory Commission November 10,1997 ~
d Document Control Desk Project No. 9583-100 Page 3 Please direct any questions to me.
Yours very truly, wy6
) -
Don K. Schopfe g-Vice President and ICAVP Manager DKS:spr Copies; E. V. Imbro (1/4) Deputy Cirector, ICAVP Oversight T. Concannon (1/2) Nuclear Energy Advicory Council J. Fougere (1/3) NU m:Ucavpeornennr11144 doc d
I
g.
MILLSTONE UNIT 3 INDEPENDENT CORRECTIVE ACTION VERIFICATION PROGRAM STATUS REPORT NOVEMBER 7,1997 Jlk Y~
~
Project Milestone Schedule Tier 1 System Review Complete 12/15/97 Tier 2 Review Complete 11/14/97 Tier 3 Review Complete 11/14/97 Final Report itsue 1/26/98
)h
~
'~^~
I
i e
Tier 1 Schedule Activity Scheduled Completion System Reviews 12/15/97*
System / Mod Walkdowns 12/1/97 O&M and Testing Reviews 12/15/97 Corrective Action Reviews
'12/15/97
- Assumes NRC acceptance of MOV sampling plan Jkk
~
Tier 1 - System Review Status SWP QSS/RSS Total Total
. Pop. ! Comp 1. Pop. : Comp System Boundary Definition N/A.
100%
N/A 100%
Document Gathering (RFis[ ~ N/A~ 700%' " N/A~ 'IO6%
Screen NU CMP Findings N/A 100%
N/A 100 %
' deniify System Require.
"655' 100'4 ~i485 ' "iOO%
i Calculation' Reviews "455' 99'd '
448^ " 99'%
Component Reviews 1543 100 %
1681 100%
'Diawing"R'eviews
~
i73" ~i66%
201 166'5"
~
Topical Reviews 2
75 %
0 N/A Disposition'Sysiem Require.
~655~
93%~
T4'85'~
'90%~
IR'eviews
~
74'
~42*d
~
[
l_ __
7 2
Tier 1 - System Review Status HVX DGX Pop.1 Co. p; Pop.. Co p.
m m
. -. -System Boundary Definition N/A
. 100%
N/A.. 100 %
Document Gathering (RFis)"
"N/A~ "T00'5 ~ N/ ~ ~iOO%
Screen NU CMP Findings N/A 100%
N/A 100%
identify System Require.
50 90%
700 90 %
Calculation Reviews 326 38%
571 40%
Cornponent"R'eviews
'1680~~43%" ~i709 ' ~54%~
~ 5%
Drawing Reviews 226" ~94 %~
'319
~
4 Topical Reviews 3
0%
2 0%
Disposit'on' System Require.
"/ 00
~28%~ "700 ~
To%
i 4-Tier 1 - Physical Configuration Review Status SWP QSS/RSS
~ T6tAl
" 5
Total ~
"'X
_ Pop.__ Comp ; Pop. Comp _
Scope Walkdown Boundary 1726 100% 1497 100%
Dwgs
'RedlE ' Vaikdown Dwgs
~'60'3' ' 1500%' 414 100 %
~
Physicai Dwg Review vs.
73I' "100*A" 734 ~ 100'5 Upper Tier Dwgs FunctiondWalkdowns
~ i48~~100*i '857" "100*5 1
(No.of Dwgs)
Modification Walkdowns 48 100%
6 100%
. (No,. of. Mods).,
AEi" Jh 3
3
4 s
Tier 1 - Physical Configuration Review Status HVX DGX
~ Total Total
.. Pop,..;. comp _ Comp; pomp _
.......................... Scope Walkdown Boundary 811 52 %
1070 62 %
Dwas Redline Walkdown Dwgs 135 17%
15g 38 %
'i'iiy5ii. ail 5iMview vs.
41 45%
252 75 5 '
Upper Tier Dwgs Functional Walkdowns 577 25%
655 51 %
(No. of Dwgs)
Modificaticd%ialkdowns
'16 " "h%
~38
~45'/o~
(No. of Mods),
Jh
"~
Tier 1 - O&M & Testing Review Status SWP QSS/RSS Total : %
Total i %
.... _.. ~..
... Pop. ;, Comp _ Pop.,, Comp,
................ System Boundary Definrton N/A.. 100% N/A - 100%
Document Cathenng (RFis)
N/A 100% : N/A 100%
Screen'NU CMP Findings
~' h/A ~~ 100% i N/A-100%
Identfy System Require.
102 100% 175 100%
OPS /Mairit/Testng/Trainingi " 294" " 90 %'
4 35 " ' '90%
Procedure Reviews
._102._
.98%
175_.. 95 %..
Despositon System Require.
Mod Reviews 24 25%
3 25 %
- OPS and Maint. Training reviews conducted on Wave 1 & 2 Systems
?.
l l
4
l Tier 1 - O&M & Testing Review Status HVX DGX
~~~
Total Total Pop.. Comp : Pop. Comp System Boundary Def)nition N/A 100 %
N/A 100 %
Document Gathering (RFts)
N/A 85 %
N/A 85 %
Screen NU CMP Findings N/A 85 %
N/A 85%
Identify System Require.
78 81 %
90 66 %
OP'S/Maint/Tesiing/ Training ~~117'~ 35'A ~398-30 %~
Procedure.Re. views.
...78. _.... _..... _ _.....
Disposition System Require.
15%
90 28%
)
7 Tier 1 - Programmatic Review Status Corrective Action Reviews UIRs ACR/CRs SYSTEMS Total Total Pop...C_omp.;. Pop. ; Comp SWP 210 96 %
254 85 %
HVX
~~25
~ 96 %
65
'995o
~
DGX 340 97 %
238
'96%
TOTALS 861 97 %
673 90 %
... ~..
3I3 5
[ b
- -~-
5
Tier 1 - Programmatic Review Status 182 DDRs apply to ICAVP systems
- 61 remain for review after screening
- List sent to NU on 10/17/97
- Screening criteria and resulting list sent to NRC
- 61 DDRs further screened to 28 for detailed review
- DDR documentation reviewed in NU's offices on 10/30 and additional closure documentation requested from NU
- NRC reviewed S&L screened list and requested 5 addit'cnal DDRs be added for detailed review on 11/05
- Expectcd completion 1 week after obtaining the DDR closure documentration Jkk
~
Tier 2 - Accident Mitigation Review Status Critical Characteristics
' Total No.
Need in No. Comp RFI SRG FSAR Section 15.1 51 51 0
0 FSAR Secton'i5.2' 39 ~
'38
" I' 0
~ 53" 47" " '0"
~6 FSAR Section 15.5 7
7 0
0 FSAR Section 15.6 49 39 0
10 FSAR Sectmn i5,7"
' 16' '
I'4 2
'O
-pggj;p.g"6 6~'
~5 0~
0 7
~~" "
6
=
a A,-
L-L
~
---e+e-~
m,+-,s-W e
a--,mA aM
-.A4xa&-
--->u-L-
--"<-6--
-34A L
as a
kA+ Men I
Tier 2 - Schedule
- Completion will be 1 week or less after receipt of information from RFI 530 (1 item) and RFI 689 (1 item).
1
}--
gi
~
Tier 3 - Programmatic Review Eiatus Additional Corrective Action items for Review
+ 71 Documents (LERs, OIRs, ACRs/CRs, UlRs)
- RFI 460 issued; documents received except:
4 of 8 OIRs not se.heduled for closure a
7 of 14 UIRs not schr.duled for closure
- Additional docume 1tation required for 8 ltems (RFis 646.690 and 691) 35 E&DCRs - 100% Complete Jh-.
Tier 3 - Programmatic Review Status Past Change Reviews Sample Docs Slee Comp Needed?
Procedures 70 100 %
No Te.nporary Alts 25 100%
No Ucensing Documents 24 100 %
.No Vendor Manuais 3
100 %
No uke 4or Uke Replacements 10 100 %
No Setnoints 40*
50%
No 32 100%
No DCNs
"~" "10" ~100i ^ "No' MEPt.deGminstions Comm Grade Dedicttions 16 100 %
RFI 671 Se Aion XI Repairs and Repimnts 10 100 %
No
- Seniple of 12 changes has been obtained g
Tier 3 - PRG Schedule Current change process - Complete
. Current change implementation - 11/14/97 awaning response to RFI 679 NRC Sample of CA Documents - 11/14/9.'
awalting response to RFI 690 1 nem awaiting response to RFI 691 2 Items 11 CA documents not completed by NU
+ Past Change reviews - 11/14/97-awaiting response to RFI 671 1 ttem l
--. L ~n.
s
t Discrepancy Summary 642 Preliminary DRs initiated 350 Valid Preliminary DRs issued to NRC/NUINEAC
- 74 Preliminary DRs considered invalid
+ 218 Preliminary DRs in process 130 NU Resolutions entered into database
+ 67 NU Resolutions reviewed by S&L
- 60 Accepted and CloseJ
- 7 Not accepted Retumed w/ Comments
+ Of the 60 Acceptable and Closed resolutions
- 34 Confirmed Disen.pancies
- 13 Prev 60usly identified by NU
- 13 Non-discrepant conditions d)
M "~
Discrepancy Summary 1
NRC Significance Level for the 350 issued Preliminary DRs
.O Level 1
.O Level 2
+ 83 Level 3
+ 267 Level 4 Q.
)'
9
.-m x
...,..,. - ~.
4,e.,y--
~
t DR Type & Level Summary (Preliminary DRs)
Discrepancy Type Level 3 Qvel 4 Calculations 40 81 Component Data 9
21 Corrective Actions 5
18 i
Design Change Process 7
3
[
Drawings 3
55 t
installation implemenmtation 8
35 Installation Reglurements 0
4 Lloonsing Documents 7
35 O&M and Testing implementation 0
1 l
O&M and Testing Procedures 0
11 Procedure implementation 0
2 Testing implementation -
0 2
lesjing Requirements 4
1 j
pe.
i I
10
... ~, -
..a.-,-
.-,~.
i l;1 i
- fb
[
i,
- ll; lir ri!!
jt!sliI.
II>
s n
o mi t
u a
o l
r s
n g
ex a
J 2-o R
r U
P 3
N c
e D
n f =
6 o
t 2
o i
ni w
t t
e Ua c
i e
v =
D c
S ei e
1 nif R
l de er L
tc c
e t
e e
p D
x
=
aV S
2-E s
1 R
l D
d l
n n
x i
Mo a
c e
o r
i
, =
D u
t s
le S
v o c n
R e
cA o
L S
i S
t i
w t
e u
o N
J.
=
- M l
8 i
v o
2 l
e e
i s
i sn t t e
o Uc R
p s
v e
o e
x M
R r
U N
t U
1 o
2 r
N oo sC d
d e
v m
e N
o o
h o
u=
l 4
t t 1
e R
r n s
D s
s e i
=
Nd s
v o
l n
R x t
N
-7 D
e p
y r
t e
a cO x
d n
1 3
i n
m i
i l
e t
c 1
O r
r i
P 4
o 0
0 o
o 0
m o
O 2 o
0 0
o o
0 0
7 6
s d
3 a
3 1i 1:
i4:'
i!J j
}
- 1;
- . i< ij
=I.
Northeast Utilities - Millstone Unit 3 Sar9ent & Lundy 11/07/97 Independent Corrective Action Verification Program Percent Complete As of 10/31/97 Subtask 10/31/97 Task / Subtask Description
% of Task % of Total % Compl.
Development of Project Manual 2.4%
100.0%
Project Administration 1.6%
90.0%
Development of Electronic Communications 0.2%
100.0 %
Development of Web Site & S&L Databases 1.0%
90.0%
Training and Mobilizat.an 2.9%
100.0 %
ARG Perform Reviews / Report DRs 5,7%
ID of Crit. Charact.
30% 1.7 %
100,0 %
Verification of Crit. Charact.
70 % 4.0 %
99.0%
CRG Perform Reviews / Report DRs 13.9 %
System SWP 42% 5.8 %
100.0 %
System - QSS/RSS 25% 3.5 %
100.0%
System HVX 18% 2.5 %
17.0%
System - DGX 15% 2.1 %
33.0%
ORG Perform Reviews / Report DRs 10.6%
Systein - SWP 25 % 2.7 %
91.0 %
System - QSS/RSS 25% 2.7 %
90.0%
System HVX 25 % 2.7 %
62.0%
System DGX 25% ?.7%
43.0%
PRG Perform Reviews / Report DRs 6.5%
Corrective Action Review 55 % 3.6 %
85.0%
Process Review 15% 1.0 %
100.0%
Process implement. Review 10% 0.7 %
95.0%
Past Change Review 20% 1.3 %
95.0%
SRG Perform Reviews / Report DRs 49.0%
System SWP 26 % 12.7 %
92.0 %
System - QSb/RSS 22 % 10.8 %
96.0 %
System HVX 22 % 10.8 %
46.0%
System DGX
- 30 % 14.7 %
46.0%
IRC Review of DRs and NU Resolutions 0.7%
75.0%
Evaluate NU Resolution of DRs 2.4%
15.0%
Finsi Report 1.0%
0.0%
Document Receipt and Maintenance 1.9%
95.0%
100.0 %
TOTAL PROJCCT 74.0 %