?MARSONS DanW L Curry, vo Presi.%nt. Nurtar Soreces Parbos.s Erdgy & Ct4smicais Group inc. -

2675 Morgantown Road

  • Far (610) 855-2002 gg Docket No. 50-336 Parsons NUM2-PPNR-1028-L U.S. Nuclear Regi:latory Com.aission Attention: Document Control Desk Washington, D.C. 20555 t

Millstone Nuclear Power Station Unit No. 2 Independent Corrective Action Verification Progr n (ICAVP) 2 Gentlemen:

This letter transmits the Sample Plans noted below. U, S Nuclear Regulatoy Commission review and approval of the sampling approach ncted in each submir.al is requested.

1. Piping and Structural Design Review Criteria, Revision 1 Sample plan revised to provide requirements based on document availability.
2. - Field Instrument Terminal / Junction Box Separation Sampling Criteria, Resision 0 Sample plan establishes sampling criteria for wiring separation inside local instrument field terminal / junction boxes.

Parsons will proceed based on the proposed sample plan, as we believe changes to the proposed sample plan can be accommodated as work proceeds. Please call me at (610) 855-2366 if you have any question _.

Sincerely, Ih Daniel L. Curry Parsons ICAVP Project Director DLC:cvb Attachments:

Piping and Structural Design Review Criteria (Rev.1)

Ipl Field Instrument Terminal / Junction Box Separation. Sampling Criteria (Rev. 0) cc:

E. Imbro (2)- USNRC -

Fl. Eichenholz - USNRC

(

3 R. Laudenat - NNECo

- J. Fougere - NNECo'.

hep. Terry Concannon - NEAC, > n,,,3

'. v v W 9901230341 990121 !

llI ll ll-ll lll l l ll PDR ADOCK~05000336 I

i 4

4 4

' su s I i il P'

P DR,,.,

t 3

e 3

_