Informs That NRC Has Agreed to Defer Architect/Engineer Insp Planned for 980120.NRC Will Continue to Monitor Progress in Both Areas of Design Bases Info & Engineering Support to Plant
ML20198Q558
Person / Time
Site: Pilgrim
Issue date: 01/15/1998
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Olivier L
BOSTON EDISON CO.
References
NUDOCS 9801230075
Download: ML20198Q558 (3)


Text

-

j January 15, 1998 Mr. Leon J. Olivier Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massachusetts 0236s.,,,.?

SUBJECT:

DEFERRAL OF NRC ARCHITECT /ENGINEERINSPECTION

Dear Mr. Olivier:

This is in response to your letter, dated December 8,1997, that prov, 'ed a supplemental response to the NRC's 10 CFR 50.54(f)lotter on design bares information. *'our letter describes a substantial revision to BECC's approach to the issue. It also,equested NRC to defer its Architect / Engineering inspection planned for January 20,1998.

NRC found the program described in your December 8,1997 letter acceptable, in general.

However, we noted that your letter did not address how BECO would i ify and validate program results. Based on discussions during the November 21,1997 Predecisional Enforcement Conference and during several phone conversations between Mr. V. Oheim of your staff and myself, we understand that BECO plans a series of vertical slice reviews, along the lines of NRC Safety System FunctionalInspections, to satisfy the need for verification and validation.

7 Based on the above, NRC has agreed to defer the Architect /Er.gineer Inspection. NRC believes it appropriate to allow BECO to focus its current efforts on implementing improvement initiatives described during the November 21,1997 conference, in both the areas of design bases information and engineering support to the plant. NRC will continue to monitor progress in both those areas. As your staff suggested, we will meet with your staff in March,1998 to hear early results of your design bases program. We also intend to perform some independent vertical slice inspections in parallel with the implementation of your programs. We willinform you of the schedule for those inspections following the-NRC Plant Performance Review Meetings scheduled for Marco,1998 We will continue to monitor the quality of engineering support to the plant through our routine inspection

program, g

If you have any questions, or see some errors in our understanding of your intent, please cratact Eugene M. Kelly, Chief, Systems Engineering Branch, or myself.

/

ORIGINAL SIGNED BY:

hn James T. Wiggins, Director

/

Division of Reactor Safety 1230075 990115

h...

2_____._________

o.

l 2

Docket No. 50 293 cc:

R. Ledgett, Executive Vice President - Operations C. Goddard, Plant Department Manager N. Desmond, Regulatory Relations D. Tarantino, Nuclear information Manager R. Hallisey, Department of Public Health, Commonwealth of Massachusett::

The Honorable Therese Murray The Honorable Joseph Gallitano B. Abbanat, Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Seleutmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director P. Gromer, Massachusetts Secretary of Energy Resources J. Miller, Senior issues Manager

- J. Fleming A. Nogee, MASSPIRG Offlice of the Commissioner, Massachusetts Department of Environmental Quality Engineering Office of the Attorney Generel, Comn onwealth of Massachusetts T. Rapone, Massachusetts Executive Office of Public Safety Chairman, Citizens Urging Responsible Energy Commonwealth of Massachusetts, SLO Designee D. Lochbaum, UCS c.

+,,,

e b

3 Distribution w/ encl:

Region i Docket Room (with concurrences)

PUBLIC Nuclear Safety information Center (NSIC)

NRC Resident inspector J. Wiggins, DRS

6. Kelly, DRS C. Cowgill, DRP R. Surnmers, DRP C. O'Daniell, DRP D, Vito, SAC Distribution w/enci (VIA E MAIL):

R. Eaton, NRR A. Wang, NRA K. Kennedy, OEDO R. Correla, NRR F. Talbot, NRR inspec'lon Program Branch, NRR (IPAS)

DOCUMENT NAME: g:\\ director \\ pilgrim.ltr TJ teceive a copy of this document. Inc#cate in the boa: 'C' = Copy wthout attachment / enclosure T = Copy wth anachmer$onclosure

'W = No copy 0FFICE Rl:DR$

1 PI br #4L-1 I

I NAME JWiggins Q F e hu%/W DATE 1/14/98 iJf i liql of 0FFICIAL RECORD COPY