C. K. McCoy Southern Nuclear 1
t,
%ce Presioent Operating Company. Inc.
Vogtle Prote:t 43 invemess Center Pahay PO Box 1295
[~]
B.rmin7am, Alabama 35201 V
Tel 205 992 7122 Fax 205 932 0433 k
SOUTHERN L COMPANY Energy to Sm.e Mr tWid*
LCV-1024-D October 24, 1997 Docket Nos. 50-424 50-425 U. S. Nuclear Regulato y Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT EMERGENCY PLAN REVISION 26 In accordance with 10 CFR 50.54(q) and 10 CFR 50.4(b)(5), Southern Nuclear Operating Company hereby submits Revision 26 to the Vogtic Electric Generating Plant (VEGP)
U Units 1 and 2 Emergency Plan (the Plan).
Revision 26 incorporates a change to the Minimum Stafling for Power Operation, Table B 1. Justification of the change is within Enclosure 1. Enclosure 2 provides the insertion instructions. Enclosure 3 identifies the revised pages.
Please contact this oflice if you h:.ve any questions regarding this submittal or contact Mr.
L. E. Mayo, Emergency Preparedness Coordinator at (706) 826-3356.
Sincerel,
h.$
C. K. McCoy g
CKM/LEM/PAH/gmb xc: See next page
Enclosures:
- 1. Justification For Revision 26 to the VEGP Emergency Plan (3)
- 2. Insertion Instructions
- 3. Resised Plan Pages l
12' li!!!,lllhbjll$[h 9711120219 971024 PDR ADOCK O$000424 F
O
~
U. S. Nuclear Regulatory Commission Page 2 xc: Southern Nuclear Operatinn Comoany Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. L. L Wheeler, Licensing Project Manager, NRR Senior Resident Inspector, Vogtle O
LCV-1024 B
- O ENCLOSURE 1 d
Justification For Revision 26 To The VEGP Emergency Plan O
1 O
^
JUSTIFICATION FOR REVISION 26 TO TIIE VEGP EMERGENCY PLAN Enclosure #1
/O Sheet 1 of1 LJ 1.
Table B-1 In the On Shif1 column for Plant Equipment Operator add, (e). Allow one Sheet I of 2 Plant Equipment Operator to be assigned 'o the Fire Brigade.
Justification:
Secjustifications below.
2.
Table B 1 Bottom of the page add, a One of the threeplant equipment operators may Sheet 2 of 2 he assigned to thefire brigade.
Justification: FSAR section 9.5.1.5.3 states in part, Thesefire team manning requirements will be met without impacting the minimum on shift operations staffrequirements as describedin the VEGP Technical Specifications (i.e, sufficient staffing will exist to man afive-manfire brigade and a three-man remote shutdown team per unit whenever the affected unit is in operation mode 1, 2, 3, or 4).
The three-man remote shutdown team includes 1 plant equipment operator (PEO) per unit, lea"ing one PEO to man the fire brigade if necessary.
Incorporation of this change will bring the Emergency Plan into conformance with other sections of the FSAR. This change does not reduce the effectiveness r
l
(
of the emergency plan nor the ability of the fire brigade and the on snift minimum stafling to perform their assigned duties.
O)
L
~ $ F O S Z. / 0 / W 3(i
~
w
O ENCLOSURE 2 A
i Insertion Instructions O
s 4
O i
l l
l
VEGP UNIT 1 AND UNIT 2 EMERGENCY PLAN REVISION 26 04/97 INSERTION INSTRUCTIONS m.e. m Remove-Description and Justification Revision Replace with Revision 25 VEGP Emergency Plan, Attachment #1(Sheets 1 26 i
through 12)
. TABLE OF.CONTEWTS-Remove -Paaesi- (ix throuah 'xvi1)
Replace' Remove from Section B, Table B-1 (Sheet 1 of 2)
Replace Remove from~Section B,' Table B-1 (Sheet 2 of-2)--
Replace i
- O 1