November 4, 1997
Mr, D, R. Gipson
Senior Vice President
Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
NRC RADIATION PROTECTION INSPECTION REPORT 50 341/97015(DRS)
Dear Mr. Gipson:
On October 10,1997, the NRC completed an inspection at your Enrico Fermi, Unit 2 facility,
The enc'esed report presents the results of that inspection.
Areas examined during the inspection included the planning and implementation of radiation
protection measures to maintain the mid cycle outage radiation dose As Low As is Reasonably
Achievable, radiation worker practices, outage chemistry, and refuel floor activities, Within
these areas, the hspection consisted of a selective examination of procedures and
representative records, observations of activities, observations of equipment material condition,
and interviews with personnel.
Overall, your staff effectively controlled radiation dose and radiological conditions for the work
associated with the 97-02 Mid Cycle Outage Your staff conducted the work efficiently and
radiation protection support for outage activities was evident, in particular, initiatives by the
chemist? staff expedited the reactor cavity floodup and changes in the refuel floor activities
resulted in significant dose savings, Radworker performance was generally effective, but
instances of inappropriate radworker practice were identifieri, in addition, the materiel condition
of the reactor water cleanup system continued to challengo plant staff and our office will review
this issue during future inspections,
No violations of NRC requirements were identified,
in accordance with 10 CFR 2,790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR),
f
i
- \\
971112
?
^0111 97d1 04,,g1
I!Ilillli$lll[Ilillfil
=o
-
O
e
Novertber 4,1997
D. R. Gipson
2
l
We will gladly discuss any questions you have concerning this inspection.
1
Sincerely,
Original Signed by John A. Grobe
i
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50 341
License No. NPF-43
Enclosure:
Inspection Report 50 341/97015(DRS)
cc w/ encl:
N. Peterson, S' pervisor of Compliance
e
P. A. Marquardt, Corporate Legal Department
James R. Padgeit, Michigan Public
Service Commission
Michigan Department of Public Health
's
Monroe County, Emergency Management Division
Distribution:
Docket File w/ encl
DRS w/ encl
A. B. Beach, Rlll w/enci
PUBLIC IE-01 w/enci
Rlli PRR w/ encl
Enf. Coordinator, Rlll w/cnci
OCFO/LFARB w/ encl
SRI, Fermi w/ encl
CAA1 w/enci (E-mail)
DRP w/ encl
LPM, NRR w/ encl
J. L, Caldwell Rlli w/enci
DOCUMENT NAME: G:DRS\\FER97015.DRS
t. e.~. . em oe m= e.ewn.aunine.i. m m. 6. : c ce -iw .n.= =a.s.
r . cm in .ii-=w.
v . wo em
OFFICE
Rlli
lE Rlli
5 Rill
lii Rlli
/7
.n
NAME
RGlinski:Jp [(Cw
GShearN#/
MJordan Q)LM
JGrobe(flf)
DATE
10/J7/97
10W/97~
'
10/g}/97
'/
1(/ 4/97
OFFICIAL RECORD COPY