ML20198P913
| ML20198P913 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/13/1998 |
| From: | Gordon Peterson DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9801220291 | |
| Download: ML20198P913 (3) | |
Text
l Duke Power Com A tu two omey. pany c
Grseusa Nuclear Session
=
' d " #*'*
- 4800 Concord Road bk. SC 29745 Gary R. lkterson (833) 831-4251 omct
\\1ceIWsident (803) 8313426 ux January 13, 1998 U.S. Nuclear Regulatory Commission Document Control Desk Wasiangton, D.C. 20555
Subject:
Catawba Nuclear Station, Unit 1 Docket No. 50-413 Special Report - Steam Generator Tube Plugging Catawba Nuclear Station Technical Specification 4.4.5.5 requires that the number of tubes plugged in each steam generator be reported to the Commission pursuant to 10CFR 50.4 at the completion of the inservice inspection of steam generator tubes.
The following number of tubes were removed from service by plugging:
Steam Generator Number of Tubes Plugged A
0 B
0 C
0 D
0 If any additional inforraation is required, please contact Skip Copp at (803) 831-3622.
o s
gn i Gar R.
Peterson j@30{)
9901220,7.91 990113 PDR ADOCK 05000413 P
PDR ll ll ll l.ilil.l!.llll!ll
- . ggg 1
l l
'. ' U.S. Nuclear R:gulatory Commission Jcnucry 13, 1998 Page 2 xc:
Mr.
U.S. Tam, NRC Project Manager Off4ce of Nuclear Reactor Regulation Mr.
L.A.
Reyes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Mr.
D.J.
Roberts, Senior Resident Inspector Catawba Nuclear Station
't 1
0.S. Nuclear Regulatory Commission January 13, 1998 Page 3 bxc: M.S.
Kitlan W.M. Sample L.A.
Keller ELL - EC050 RGC File
\\
I e
- - _ - -. _ _ _ _ - _ - - - - - - - - - - _ _ - - - - _ - - _ - _ -. _ _ _ _ - _. _ _. _ _ _ _