ML20198N909

From kanterella
Jump to navigation Jump to search
Forwards Integrated Insp Repts 50-348/97-14,50-364/97-14 & Investigation Rept 2-97-005 on 971019-1129 & Notice of Violation.Violation Identified W/Plant Operation Outside Design Basis Due to Degraded Flooding Barrier
ML20198N909
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/29/1997
From: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20198N914 List:
References
50-348-97-14, 50-364-97-14, EA-97-380, EA-97-557, EA-97-571, NUDOCS 9801210252
Download: ML20198N909 (5)


See also: IR 05000348/1997014

Text

w

,

,

December 29, 1997

EA 97-380

EA 97-557

EA 97-571

Southern Nuclear Operating Company. Inc.

ATTN: Mr. D. N. Morey

Vice President

P. O. Box 1295

Birmingham AL 35201-1295

$UBJFCT: NRC INTEGRATED INSPECTION REPORT 50-348/97-14 AND 50-364/97-14.

OFFICE OF INVESTIGATIONS REPORT NO. 2-97-005. AND NOTICE OF

VIOLATION

Dear Mr. Morey:

On November 29. 1997 the U.S. Nuclear Pegulatory Commission (NRC) completed an

inspection at your Farley Nuclear Plant sFNP). The enclosed report presents

the results of that inspection.

During the 6-week period your conduct of activicies at FNP was generally

characterized by safety-conscious operations, sound engineering and

maintenance practices, and careful radiological work controls. However,

violations of NRC requirements were identified.

A violation was identified associated with plant operation outside of the

design basis due to a degraded flooding t arrier (i.e. . cork seal) in the main

steam valve room. The NRC commends the performance of the senior reactor

operator who ultimately caused this issue to be appropriately characterized:

however, we were particularly concerned about the longstanding nature of this

problem and the multiple opportunities to have properly characterized it

sooner. Additionally, we are concerned regarding the lack of appropriate

engineering review of deficiency reports which may have identified the design

basis issue sooner. Consequently, this violation was considered for escalated

enforcement due to previous inadequate corrective actions and recent similar

issues associated with the penetration room boundary, but was not pursued as

such because of the low safety significance involved.

The second violation was associated with the closecut of an Unresolved ltem

involving the lack of tornado missile protection for the Turbine Driven

Auxiliary Feedwater (TDAFW) pump vent stack. We have determined that the

failure to provide tornado missile nrotection for the TDAFW Pump vent stack is

a violation of NRC requirements. Tfieviolationiscitedintheenclosed

Notice,

n 140.0 b ~ '

9801210252 971229 'dO [ l 'f lI} . fI j

PDR ADOCK 05000348 i >

G PDR \

4601

.. o

,

4

, _SNC 2

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your-

response, you should document the specific actions taken and any additional

-act'ons you plan to prevent recurrence of the violations. After reviewing

your response to this Notice, including your proposed corrective actions and

the results of future inspections. the NRC will determine whether further NRC

enforcement action is necessary to ensure compliance with NRC regulatory

requirements.

This report also identifies a non-cited violation (NCV) related to the failure

to maintain certain emergency planning inventory checklist documentation

complete and accurate. As identified by your staff and subsequently

determined by the NRC Office of Investigations (01) an Emergency Preparedness

Technician failed to conduct certain required equipment inventories and

deliberatly falsified the checklists. The synopsis of the 01 investigation is

attached to the enclosed report.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

this-letter and its enclosures will be placed in the NRC Public Document Room.

Sincerely.

Original signed by

Jon R. Johnson

Jon R. Johnson, Director

Division of Reactor Projects

Docket Nos.- 50-348 and 50-364

License Nos.: SIPF-2 and NPF-8

Enclosures:

1. Notice of Violation

- 2. Inspection Report 50-348/97-14

and 50-364/97-14

cc w/encls:

M. J. Ajluni. Licensing

Services Manager B-031

Southern Nuclear Operating

Company. Inc.

42 Invern.'s Center Parkway

Birmingha.... AL 35242

R. D. Hill. Jr.

. General Manager. Farley Plant

-Southern Nuclear Operating

Company. Inc.-

P. O. Box 470

-Ashford. AL 36312

cc.w/encls cont'd: (See'Page 3)

,

.

, . . . - - . . - . ..~ ... n.; ~. - ,- , . , .

.3 jna  ;  ;

-

, , _

y -i

-

- , , e

l_I-\ ,, - _ _

-71 f '

Q:t y g ,,, ,

.

- lt'

. .

J

r,

,

,5 lSkCl

'

'

m,

.

'

_

!3i -

' ' '

-

_l

. . - . ~ .

~ '

Mcw/encis:VContinuedl

'

' i . ,

,

'

. rJdD?Woodard? = -

- -

x:f'

i ^

'

Executive:Vice; President'

'

Southern Nucleari0peratingL -

,

,

CompanyJInc.: a

'

. .

' ;PE 0.1 Box 1295.. '

. Birmingham.fALV352011

.  !

,

' State Health '0'fficer .

.L

. -

.

s  ? Alabama-Department of Public Health-- ~

7434' Monroe Street?

-~

--

Montgomery.lAli 36130-1701  :;

^

_ ,

~

..

.LMi Stanford Blanton ,

Balch and Bingham Law Firm 'i

'

PL 0S Box 306-

'1710l Sixth' Avenue' North-

-

.

Birmingham,AL
:35201 ,

-

= ,

'

-Chairman- . .

- -

,

- -

.

Houston-County Commission _ -i

.P.-0. Box:6406

-

-

- Dothan; AL 363021 ,

J

31st'ribution w/ enc 1: ~

?

b.H.: Skinner. Ril'> -l

, tR._P. Carrion. RII +

iR.:.K.oCaldwell. RII l

it XHerriweather. RII

'

- G..B.EKuzo; RII'  :

'

W.JP.!Kleinsorge. RII

-

2M.'E.=Ernstes.-RII

JA.1T?Boland.'RII

-

0.'DeMiranda RII-

-

"'

1J.?Zimmerman.-NRR .

?B.' Summers,L0E (2: letterhead) '

J. Lieberman._OE- -

PUBLIC

,

y'

- - ,:-

I i Distrib'ution w/encls cont i d:

~

'

(See Page_4)?

w n, i

$

_.

4 I  %-

%cf, ,

pij f- 4

e -

, '-

y

s u

,y[ g 95

, vu

i

-

s ! % ..

+ , . .

~ y

$ ll -',' t

, .n. a . . .u., , -.. ~

.

-

n.

- _ . . .

.. a

.

. SNC 4-

Distribution w/encls: Continued

NRC Resident Inspector

U.S. Nuclear, Regulatory Comission

7388 N State Hwy 95-

-Columbia. AL 36319

i

!

l

  • SEE PREVIOUS CONCURRENCE

OFFIM RII DRP RII:DRP Ell:DRP Ell:DRP Ril:DRP Ril:DR5 Ril:DR5

51 M TUNE

RAIE RPCarrian:s5ta" PN51 tinner" TImoss' JNgargley" RKcatchset t' EBKuzo" IBlerriweether"

DATE 12/ /V7 12/ /VT 12/ /V7 1Z/ /VT 12/ #7 12/ /V7 12/ /V7

ws-i s YE5 HD YE5 8m YE5 IID YES 11 0 YES IID YE5 ND YE5 11 0

.. - - .

- -

. -

..:- .- - u. . - . . :. .:u. .- ' .

m

ElmTIME

WWE ATBotan P

DATE 12/ /VT 12/ /V7 12/ /V7 12/ /YT 12/ - /V7 12/- ./V7 12/ /V7

wri r YE5 E) YE5 ND YES ND YE5 11 0 YE5 11 0 YES 11 0 YE5 11 0

OfflCIAL REC W COPY 000KNi IIMRis E \fAIILEY\ FAT 1411R.DFT

I -__ ._ _

.

.. a'

.

,

SNC- 4

Distribution w/ encl: Continued

J. Zimerman. NRR

B._ Summers. OE (2 letterhead)

J. Lieberman. OE

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

7388 N State Hwy 95

Columb1a, AL 36319-

m

Mfftf Rf f IVO Rf f MP pf f Mo Rf f rw Rif.ORp b51A/

bE N Ib i[,,e/NmN*a uA,

M

SIGNAfupt

NAME

b[{

RPCarrion:dka

r as rn e~~~

PHSkinner

i.a rn

TPRoss

n-,

JH8artley

n m .v.,

RKCaldwell D 20

DATE 12 / 2. f/ 97 12 /Af/97 12/2-[/97 12 /& f/ 97 12/Lf/97 12 / N / 97

6 -

0FFICf R! f 'wo Rt f>teo P!1 Mo Rff ORD PT f Doo P!f ORS

$1GNATURE 4

NAME- Nikertweath r ATBola

DATE 1A/7[J/97 M / 97 12 / / 97 12 / / 97 12 / ~ / 97 12 / ' / 97

COPY 7 (YES) NO [Yls) NO YES NO YES NO YES NO YES NO

OFFICIAL RtLOHO LUTT. _ M r.hl hAMt: G: \F Arn.EnF All41iii.Or i