Lists Mods Made to Polar Gantry Crane After Initial Design Proof Test,In Response to NRC 860529 Request.Addl Max Capacity Load Test of 210 Tons Unnecessary
ML20198N575
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/04/1986
From: George Thomas
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Noonan V
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR SBN-1089, NUDOCS 8606060127
Download: ML20198N575 (3)


Text

__

George S Thomas

%ce Presider.t.Nucitoor Prc<ft.ction June 4, 1986 ONdbM SBN-1089 T.F.

B7.1.2 New Hampshire Yankee Division United States Nuclear Regulatory Commission Washington, DC 20555 Attention:

Mr. Vincent S. Noonan, Project Director PWR Project Directorate No. 5

References:

(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) PSNH Letter (SBN-887), dated October 31, 1985,

" Control of Heavy Loads: NUREG-0612 (Revised Report)",

J. DeVincentis to G. W. Knighton (c) PSNH Letter (SBN-977), dated October 31, 1985, " Control of Heavy Loads:

NUREG-0612", J. DeVincentis to V. S.

Noonan Subj ect :

Control of Heavy Loads:

NUREG-0612

Dear Sir:

In Reference (C), we tranPmitted to yOU information regarding Control of heavy loads.

As a result of your Staff's review, on May 29, 1986, the Staff requested a list of modifications completed on the Polar Gantry ccane after the initial Design Proof test.

Below are those modifications which have been made to the crane:

1) As a maintenance item, the rope was replaced on the main and auxiliary hoists. The rope was purchased to the original specification and proof tested for actual tensile strength.

This was considered a minor change by the manufacturer (Whiting Corp.).

It should be noted that since the new rope was added, the main hoist has been used to lift the reactor vessel head (i.e., 169 tons).

2) A small auxiliary lift device, attached to the Polar Gantry crane for use during construction, was removed except for the mounting pads. The affected portions of the crane and the pads have been analyzed, and no detrimental impacts on the crane's performance or loading carrying capability were identified.

8606060127 860604 PDR ADOCK 0500 3

A M

Bo I

P.O. Box 300. Seabrook, NH O3874. Telephone (603) 474-9521 I O

O 4

United States Nuclear Regulatory Commission Attention:

Mr. Vincent S. Noonan Page 2 As noted in the NUREG-0612 submittal (Reference (c)], the crane has been reinspected by Whiting Corp.

No changes or modifications other than maintenance (i.e., lubrication) were recommended.

An inspection report on the above is available.

In summary, the minor modifications to the crane have been evaluated and the crane has been inspected and found to be acceptable by the manu-facturer. The Initial Load test, performed for the ANSI B30.2 requirement of 525 tons, is still valid. Therefore, an additional Maximum Capacity Load (MCL) test of 210 tons is not necessary.

Should you have any questions regarding this matter, please do not hesitate to contact us.

Very truly yours, eb

-WA George S. Thomas cc: Atomic Safety and Licensing Board Service List i

l

i 9

l

'e Diens Curran, Esquire Calvin A. Cannsg i

Marison & Weiss City Manager 2001 S. Street, N.W.

City Hall i

Suite 430 126 Daniel Stredt Washington, D.C.

20009 Portsmouth, NH 03801 Sherwin E. W rk, Esq.

Stephen E. Merrill, Esquire g Office of the Executive Legal Director Attorney Ceneral 1

U.S. Nuclear Regulatory Cosuaission Coorse Dana Bisbee, Esquire Tenth Floor Assistant Attorney General Washington, DC 20555 Office of the Attorney General 25 Capitol Street Robert A. Backus, Esquire Concord, M 03301-4397 116 Lowell Street P.O. Box 516 Nr. J. F. Wadeau Manchester, EN 03105 Selectmen's office 10 Central Road Philip Ahrens, Esquire Rye, NH 03870 Assistant Attorney Ceneral Department of The Attorney General Mr. Angle Nach!ros Statehouse station #6 Chairfan of the Board of Selectmen i

hugusta, NE 04333 Town of Newbury Newbury, MA 01950 Mrs. Sandra Cavutis Chairman, Board of Selectmen Mr. William 8. Lord RFD 1 - Box 1154 Board of Selectaea Kennsington, MN 03027 Town Hall - Friend Street Carol S. Sneider, Esquire Assistant Attorney General Senator Gordon J. Humphrey Department of the Attorney General 1 Pillsbury Street j

One Ashburton Place, 19th Floor Concord, EN 03301 Boston, MA 02108 (ATTN: Norb Boynton) i Senator Cordon J. Humphrey N. Joseph Flynn, Esquire U.S. Senate Office of General Counsel Washington, DC 20510 Federal Baergency Management Agencyg (ATTN: Toe Burack) 500 C Street, SW Washington, DC 20472 l

Richard A. Hampe, Esq.

Mampe and McNicholas Paul McEachern Esquire 35 Pleasant Street Matthew T. Brock, Esquire Concord, BN 03301 Shaines & Netachern 25 Naplewood Avenue Donald E. Chick F.0. Box 360 Town Manager Portsmouth, NN 03801 Town of Exeter 10 Front Street Cary W. Molmes, Esq.

Exeter, W 03833 Holmes & Ells 47 Winnacunnet Road Brentwood board of Selectmen Hampton, NN 03841 RFD Dalton Road Brentwood, WH 03833 Nr. Ed Thomas l

FEMA Region I l

Peter J. Mathews, Mayor 442 John W. McCormack PO & Courthouse City Hall Boston, MA 02109 Newburyport. NA 01950 Stanley W. Knowles, Chairman Board of Selectmen P.O. Box 710

- __ _- ____ _._____ _ _ _ _ _ _-._.__ _._______ _ __.__ [th Hamptony,W 03842,, _ - -

No

_