ML20198N195

From kanterella
Jump to navigation Jump to search
Forwards Revised Page (3/4 3-54) of Byron Station,Units 1 & 2 Tss.Revised Page Provides Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements.Changes Were Implemented on 981228
ML20198N195
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/29/1998
From: Graesser K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198N197 List:
References
BYRON-98-0325, BYRON-98-325, NUDOCS 9901060052
Download: ML20198N195 (4)


Text

,

l

. Commonwealth niimn Company II)n)n Generating Station 4450 North Gennan Church Road l

ilyron,11. 61010-9794

)'

Tcl 815-234-54 41 I

December 29, 1998 LTR:

BYRON-98-0325 Filer 2.01.0300 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Implementation of Containment Floor Drain Sump Water-Leve] (Narrow Range) Instrumentation' Requirements of Improved Technical Specifications (ITS) 3.3.3,

" Post Accident Monitoring (PAM)

Instrumentation."

Reference:

Letter from R. Assa (U.S. NRC) to O.D. Kingsley (Comed), ISSUANCE OF AMENDMENTS (TAC NOS. M97546, M975<7, M97548 AND M97519), dated December 22, 1998.

Pursuant to 10 CFR 50.4 (b), Commonwealth Edison (Comed) Company is submitting

'the attached revised page. (3/4 3-54) of the Byron Station, Units 1 and 2,-

Technical Specifications.

This revised page provides an early implementation of the Containment Floor Drain Sump Water Level ~(Narrow Range) Instrumentation

\\.

requirements of the Byron Station, Units 1 and 2, ITS 3.3.3, " Post Accident Monitoring-(PAM) Instrumentation.

These changes were implemented on December jl 28, 1998.

The referenced Amendment relocates the requirements for these instruments from Technical Specifications to an owner-controlled document I

(i.e., Technical Requirements Manual).

The particular requirements of the Technical Requirements Manual for these

~

instruments have been reviewed, approved, and incorporated into appropriate

\\,

D station operating procedures.

Q P

ADOCK05000454[3]

9901060052 901229 PDR-P PDR 2?

p:/98byltrs\\980325.wpf A Unicom Company

Prgs 2 I:1utnce of Amindmanta Should you' have any questions concerning this letter, please contact Mr. B.

Adams at. (815) 234-5441 extension 2280.

Respectfully,

.l

~ AY K.L. Graesser Site Vice President 1

Byron Station l

Attachment j

1 KG/JL/clb I

cc:

Regional Administrator - NRC Region III NRC Senior Resident Inspector - Byron Station l

i i

i l

p:/98byltrs\\980325.wpf l

.-._.-..~

~

/

bec: NRC Project Minager-NRR-Byron Station Offica of Huclear Facility Safety - IDNS Nicholas Reynolds - Winston & Strawn Vice President - Regulatory Services Regulatory Assurance Manager - Braidwood Station Regulatory Assurance Manager - Byron Station Director, Licensing and Compliance - Braidwood Station Director, Licensing and Compliance - Byron Station Comed Document ~ Control Desk Licensing (Hard Copy)

Comed Document Control Desk Licensing (Electronic Copy)

I 1

i l

l l

I f

l I

I I

p:/98byltrs\\980325.wpf'

~,

l ATTACID4ENT i

Revised Byron Station, Units 1 and 2, Technical Specification Page i

Page 3/4 3-54 b

l 1

l i

l p:/98byltrs\\980325.wpf.