. Commonwealth niimn Company II)n)n Generating Station 4450 North Gennan Church Road l
ilyron,11. 61010-9794
)'
Tcl 815-234-54 41 I
December 29, 1998 LTR:
BYRON-98-0325 Filer 2.01.0300 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Implementation of Containment Floor Drain Sump Water-Leve] (Narrow Range) Instrumentation' Requirements of Improved Technical Specifications (ITS) 3.3.3,
" Post Accident Monitoring (PAM)
Instrumentation."
Reference:
Letter from R. Assa (U.S. NRC) to O.D. Kingsley (Comed), ISSUANCE OF AMENDMENTS (TAC NOS. M97546, M975<7, M97548 AND M97519), dated December 22, 1998.
Pursuant to 10 CFR 50.4 (b), Commonwealth Edison (Comed) Company is submitting
'the attached revised page. (3/4 3-54) of the Byron Station, Units 1 and 2,-
Technical Specifications.
This revised page provides an early implementation of the Containment Floor Drain Sump Water Level ~(Narrow Range) Instrumentation
\\.
requirements of the Byron Station, Units 1 and 2, ITS 3.3.3, " Post Accident Monitoring-(PAM) Instrumentation.
These changes were implemented on December jl 28, 1998.
The referenced Amendment relocates the requirements for these instruments from Technical Specifications to an owner-controlled document I
(i.e., Technical Requirements Manual).
The particular requirements of the Technical Requirements Manual for these
~
instruments have been reviewed, approved, and incorporated into appropriate
\\,
D station operating procedures.
Q P
ADOCK05000454[3]
9901060052 901229 PDR-P PDR 2?
p:/98byltrs\\980325.wpf A Unicom Company
Prgs 2 I:1utnce of Amindmanta Should you' have any questions concerning this letter, please contact Mr. B.
Adams at. (815) 234-5441 extension 2280.
Respectfully,
.l
~ AY K.L. Graesser Site Vice President 1
Byron Station l
Attachment j
1 KG/JL/clb I
cc:
Regional Administrator - NRC Region III NRC Senior Resident Inspector - Byron Station l
i i
i l
p:/98byltrs\\980325.wpf l
.-._.-..~
~
/
bec: NRC Project Minager-NRR-Byron Station Offica of Huclear Facility Safety - IDNS Nicholas Reynolds - Winston & Strawn Vice President - Regulatory Services Regulatory Assurance Manager - Braidwood Station Regulatory Assurance Manager - Byron Station Director, Licensing and Compliance - Braidwood Station Director, Licensing and Compliance - Byron Station Comed Document ~ Control Desk Licensing (Hard Copy)
Comed Document Control Desk Licensing (Electronic Copy)
I 1
i l
l l
I f
l I
I I
p:/98byltrs\\980325.wpf'
~,
l ATTACID4ENT i
Revised Byron Station, Units 1 and 2, Technical Specification Page i
Page 3/4 3-54 b
l 1
l i
l p:/98byltrs\\980325.wpf.