Forwards Updated Proprietary & non-proprietary Quarterly Repts on Implementation Status of Compliance Plans for Period 970901-1130.Ltr Supercedes Previous Version Submitted on 971215.Proprietary Info Withheld Per 10CFR2.790
ML20198N092
Person / Time
Site: Portsmouth Gaseous Diffusion Plant, Paducah Gaseous Diffusion Plant
Issue date: 01/12/1998
From: Toelle S
UNITED STATES ENRICHMENT CORP. (USEC)
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20070L167 List:
References
GDP-97-0208, GDP-97-208, NUDOCS 9801200258
Download: ML20198N092 (2)


Text

'

3 e

s' Ms A Global Ene,rgy CompanyUSEC January 12,1998 Mr. Robert C. Pierson SERIAL: GDP 97-0208 Chief, Special Projects liranch Division of Fuel Cycle Safety and Safeguards, NMSS United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Paducah Gascous Diffusion Plant (PGDP)

Portsmorth Gescans Diffusion Plant (PORTS)

Docket Nos,7n.7001 and 70 7002 Qnrterly Compliance Plan Report INFORMATION TRANSMflTED llEREWITil IS FROTECTED FROM PUllLIC DISCLOSURE AS CONFIDENTIAL COMMERCIAL OR FINANCIAL INFORMATION AND/OR TRADE SECRETS PURSUANT TO 10 CFR 2.790(d)(1) AND 9.17(a)(4)

Dear Mr. Pierson:

(Note: This letter was originally submitted to the NRC on December 15,199 t; however, USEC inadvertently omitted Figure i emd Enclosure 1 to this submittal. Therefore, USEC is resubmitting this letter in its entirety. This letter supersedes the previous version submitted to you on December 15,1997. We apolol,s.c for any inconvenience.)

in the Introduction section of the PGDP and PORTS Compliance Plans, the United States Enrichment Corporation (USEC) committed to provide the Nuclear Regulatory Commission (NRC) with quarterly reports on the implementation status of the Compliance Plans. The quarterly Compliance Plan Report for the period September I,1997 through November 30,1997 is enclosed. As required by the Compliance Plan, enclosed is the following information: 1) an executive summary; 2) tables listing completed / closed Compliance Plan issues and Compliance Plan issues that are scheduled to be completed during the next quarter; and 3) a detailed listing, sorted by noncompliance, of the individual commitments within each Compliance Plan issue.

In accordance with 10 CFR 76.33(c), and consis'ent with the NRC's December 18,1995 letter, the information related to Compliance Plan issues A.1 through A.5 for PORTS, and A.1 g

through A.7 for PGDP is considered to be proprietary commercial and financial information j/

pursuant to 10 CFR 2.790(d)(1) and 9.17(a)(4) and is exempt from public disclosure. These Compliance Plan issues have been clearly identified as proprietary information.

gI M031hkledge Drive. Bethesda. MD 20817-18 t 8

[3 Telephone 3015M.32001:ax 3u14M-3201 http://ww.mec.com

+>

3 dVU nmm in Livermore. CA Paducah, hT lbrtsmouth. 011 Washington. DC

h.,f, h.h. ].h 9901200258 900112 gnc/

, e PDR ADOCK 07007001 4A C

.PDR; y-

Mr. Itobert C. Pierson January 12,1998 0DP 07-0208. Page 2 Updates to the Executive Summary of this section of this report are indicated by chai.ge bars in the right hand margin. If you have any questions or require additional inforniation concerning the enclosed report, please contact Russ Wells at (301) S64 3245. There are no new commitments contained in this submittal.

Sincerely, n

s. A.

I Steven A. Toelle Nuclear Regulatory Assurance and Policy Manager Ericlosures: As stated ec:

NRC Region ill Office NRC Resl dent inspector - PODP and PORTS DOE Regulatory Oversight Manager a