Forwards SE Re Approval of Rev 1 to Quality Assurance Program at Facility
ML20198M803
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/14/1997
From: Fairtile M
NRC (Affiliation Not Assigned)
To: Feigenbaum T, Mellor R
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20198M806 List:
References
TAC-M98628, NUDOCS 9710300006
Download: ML20198M803 (3)


Text

, y -

, October 14, 1937 Mr. Ted 'C. Feigenbaum Executive Vice President clo Mr. Russell Mellor Director of Site Operations Connecticut Yankee Atomic Power Co.

362 Injun Hollow Road East Hampton, Connecticut 06424-3099 -

-SUBJECTi APPROVAL OF REVISION 1 TO THE QUALITY ASSURANCE PROGRAM AT THE HADDAM NECK Pi. ANT (TAC NO. M93628)-

Deer Mr. Feigenbaum::

' By letter dated April 25,1997, and as supplemented by an August 21,1997 letter, the Connecticut Yankee Atomic Power Company, licensee for the Haddam Neck Plant, i submitted a request to amend the Quality Assurance Program (QAP) for the Plant.

( ' Based on our review of your submitals, and of the previously effective Revision 0 of the

.OAP, the staff concludes that while the revised QAP constitutes a reduction in commitment; this reduction in the structures, systems, and components (SSC) scope is due to the pormanent shut down of the plant and thus the resultant need for many less safety related SSCs. Therefore, we find Revision 1 to the QAP to be acceptable. Our Safety Evaluation of Revision 1 is anclosed.

$IkLSIGNEDBY:

Morton B. Fairtile, Senior Project Manager Non-Power Reactors anc Decommissioning Project Directorate Division of Reactor Program Management )

Office of Nuclear Reactor Regulation

' Docket No. 50-213

Enclosure:

As stated cc w/ enclosure:

See next page p)/

DISTRIBUTION:

' Docket File' 50 2137 l SWeiss' OGC-(015-B-18) JMinns ,

PUBLIC _ ' MMasnik RDudley '

LThonus PDND r/f EHylton TFredrichs MWebb JRos- MFairtilo PHarris SBlack DMatthews 'JHickey (T7-F27) AMarkley PDND:PM P PDND:(A)S PDND:D .

MFairtilel/$ f n- MMasnik SWe'ss 10/f%97 10 97 -

' OFFICIAL RECORD COPY 10%7 10$97 DOCUMENT NALIE: A:WS8628

.-. G RE EFMR may u." m .

9710300006 971014 p a== **m= H. E. E. W.  ! HI H.

. o

pa Rt

[je #*r UNITED STATES

" }t NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2000f4001

[ October 14, 1997 Mr. Ted C. Feigenbaum Executive Vice President c/o Mr. Russell Mellor Directo" of Site Operations Connecticut Yr.nkee Atomic Power Co.

362 injun Hollow Road East Hampton, Connecticut 06424 3099

SUBJECT:

APPROV,t.L OF REVISIOt 1 TO THE QU ALITY ASSURANCE PROGRAM AT THE HADDAM NECK PLANT (TAL NO. M98628)

Dear Mr. Folgenbaum:

By letter dated April 25,1997, and as supplerented by an August 21,1997 letter, the Connecticut Yankes Atomic Power Company, licensee for the Haddam Neck Plant, submitted a request to amend the Quality Assurance Program (OAP) for the Plant.

Based on our review of your submitals, and of the previously effective Revision 0 of the GAP, the staff concludes that while the revised QAP constitutes a reduction in commitment; this reduction in the structures, systems, and components (SSC) scope is due to the permanent shut down of the plant and thus the resultant need for many less safety related SSCs. Therefore, we find Revision 1 to the OAP to be acceptable. Our Safety Evaluation cf Revision 1 is enclosed.

Sincerely,

$M0%t h < 5L%fLh Morton B. Fairtila, Senior Project Manager Non-Power Reactors and Decommissioning Project Directurate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-213 Enciesure: As stated cc w/ enclosure:

See next page i

y n 4.

Connecticut Yankee Atomic Power Co. Haddam Neck Plant-Docket No. 50-213 cc:

Lillian M. Cuoco, Esq. -

P' rident inspector -

- Senior Nuclear Counsel Haddom Neck Plant

' Northeast Utilities Sorvice Company - clo U.S. Nuclear Regulatory Commission P. O.- Box 270 362 Injun Hollow Red

- Hartford, CT 06141-0270 East Hampton, CT -06424-3099 i

Mr. Kevin T. A. McCarthy, Director Mr. James S. Robinson

-- Monitoring and Radiation Division Manager, Nuclear Investmt:nts and Department of Environmental Administration.

. Protection New England Power Compsny 79 Elm Street 25 Research Drive Hartford, CT--06106 5127 Westborough, MA 01582 -

Mr. Allan Johanson- Mr. G..P. van _Noordonnen

- Assistant Diractor- Manager - Nuclear Licensing Office of Policy and Management Northeast Utilities Service Company H Policy Development and Planning 362 Inj"n Hollow Road-

. Division - East Hampton, CT -06424-3099 450 Capitol Avenue-MS#52ENR P. O. Box 341441 Regional Administrator

Hartford, CT
06134-1441 Region 1

- U.S. Nuclear Regulatory Commission Mr. F. C. Rothen 475 Allendale Road Vice President - Work Services King of Prussia, PA 19406 Northeast Utilities Service Company P. O. Box 128 Board of Selectmen-Waterford, CT 06385 Town Office Building

~

. Haddam, CT 06438 -

Mr. D. M. Goebel '

Vice Prt,sident - Nuclear Oversight Northeast Utilities Service Company P. O. Box 128