Submits Second Required Response to NRC GL 98-03 Re Yr 2000 Readiness Programs.Facility Created Comprehensive Listing of All Computer Related Sys & Applications
ML20198L152
Person / Time
Site: 07001201
Issue date: 12/28/1998
From: Armontrout C
FRAMATOME COGEMA FUELS (FORMERLY B&W FUEL CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-98-03, GL-98-3, NUDOCS 9901040062
Download: ML20198L152 (2)


Text

.

~

E R AMATOME COG EM A F U E LS t

Docket Number: 70-1201 License Number: SNM-1168 December 28,1998 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Response to Generic Letter (GL) 98-03, NMSS Licensees' and Certificate Holders'. Year 2000 Readiness Programs Ladies and Gentlemen:

On June 22,1998, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 98-03. The letter required licensees, such as Framatome Cogema Fuel's Lynchburg Manufacturing Facility (FCF-LMF) to submit three responsec. The first was required by September 20,1998, the second by December 31,1998, and if necessary, the third by July 1,1999. This letter addresses the second required response.

The second requirement states:

Upon completing your Y2K Readiness Program, or, in any event, no later than December 31,1998, submit a written response confirming that your facility is Y2K Ready and in compliance with the terms and conditions of your license or certificate, and NRC regulations; or if your facility is not Y2K Ready by December 31,1998, then submit a written responce that contains a status report of work remaining to be done to become Y2K Ready, including completion schedules. For systems that may affect safety and safeguards, contingency plans to become Y2'K Ready and Y2K Compliant should be included in your response.

During the past several months FCF-LMF has created a comprehensive listing of all computer related systems and applications. Each item has been categorized by the O

system owner and given validation priority status by the FCF-LMF NRC-Y2K Team.

At the time of this writing, all but two (2) safety and safeguard items have been FCF-LMF tested or validated by the manufacturer to be Y2K Compliant or Y2K Ready, as appropriate. The two items not validated at this time are the Radiation Shipment Soft:vare, and the Security Check Point Reader System. These items will

,. D be validated by July 1,1999.

p 9901040062 981228 M

ADOCK 07001201 f Dg PDR PDR y

M Framatome Cortema Fuels F R AM ATOM E P O. Box 11646, Lynchburg, VA 24506 1646 TECHHOLOOIE5 Telephone: 804-832-5000 Fax: 804 832-5167 j

l

I Dockst Number 70-1201 Licensa Numbar SNM-1168 Page 2 FCF-LMF has concluded that contingency plans for these two systems will not be i

necessary since both items will be resolved prior to the deadline. However if necessary, the contingency plan for the Security Check Point Reader System and the Radiation Shipment System will be to revert to the peper systems that were previously used.

All other systems not related to safety or safeguards are currently undergoing j

validation testing by FCF-LMF or the manufacturer. At this time approximately 85%

of the validation process is complete with only minor fixes necessary for eight items. Generic desk top computers and software will be examined and tested in the coming months. All open issues will be cornpleted by July,1,1999.

Should you have any questions or require additional information, please contact myself at (804) 832-5043 or Mr. Alvin D. McKim, Manager, Quality, Health / Safety and Licensing, at (804) 832-3501.

I affirm that the statements set forth herein are true and correct to the best of my knowledge, information, and belief, t

i Sincerely, C. A. Armontrout

Manager, Licensing and Quality Systems cc: Luis Reyes, Regional Administrator, NRC Region 11 t