Forwards Rev 1 to Catawba Nuclear Station Diesel Engine 2A Component Revalidation Insp, Clarifying Previous Testing & Describing Addl Testing on Engine 2A
ML20198J396
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/28/1986
From: Tucker H
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20198J401 List:
References
NUDOCS 8606030104
Download: ML20198J396 (1)


Text

7- ,

DUKE POWER GOMPANY P.O. BOX 33189 CHAMIAyrTE, N.O. 98942 HALH. TUCKER TELEPHONE

= = . n (704) 373-4834 u.. -

May 28, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4 RE: Catawba Nuclear Station, Unit 2 Docket No. 50-414

Dear Mr. Denton:

By my letter of October 2, 1985, Duke Power Company (Duke) submitted a report on the results of the Catawba 2A diesel engine component revalidation inspections. Enclosed is Revision 1 to this report. This revision clarifies the extent of previous testing and describes additional testing that was completed for the 2A engine at Catawba.

Very truly yours, Hal B. Tucker WLHrsib xc: Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station 8606030104 860028 14 PDR ADOCK 0D00 I I l