Forwards Insp Repts 50-445/85-17 & 50-446/85-14 Re 851028-1101 Insp of Comanche Peak Design Adequacy Program Scope Validation Process & Checklist Development in Bethesda,Md
ML20198G916
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/21/1986
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20198G920 List:
References
NUDOCS 8601300012
Download: ML20198G916 (6)


See also: IR 05000445/1985017

Text

  • * "% * .

. #o,j UNITED STATES

8 o NUCLEAR REGULATORY COMMISSION

$ WASHING TON, D. C. 20555

%,*****/

JAN 211986 -

Docket Nos.: 50-445

50-446

Mr. W. G. Counsil

Executive Vice President

Texas Utilities Generating Company

400 North Olive Street, L.B. 81

Dallas, TX 75201

Dear Mr. Counsil:

SUBJECT: INSPECTI0lP0F COMANCHE PEAK DESIGN ADEQUACY PROGRAM SCOPE VALIDATION

PROCESS AND REVIEW CHECKLIST DEVELOPMENT - 50-445/85-17, 50-446/85-14

This letter conveys the results and conclusions of the inspection of the Comanche

Peak Design Adequacy Program (DAP) scope validation process and review checklist

development. The inspection was conducted to the NRC's Office of Inspection and

Enforcement (IE). The inspection team was composed of NRC personnel from IE and

the Office of Nuclear Reactor Regulation (NRR), as well as consultants. The

inspection took place at TERA Corporation, Bethesda, Maryland during the period

from October 28 to November 1, 1985.

,

The inspection focused on the Comanche Peak Response Team (CPRT) Program Plan,

Revision 2, dated June 28, 1985, specific' ally Appendix A (Design Adequacy Program)

'

and Discipline Specific Action Plans (DSAPs) VIII through XI. DSAPs VIII through

XI cover the civil / structural, piping / supports, mechanical systems / components, and

electrical /I&C disciplines, respectively. A substantial portion of the inspection

involved evaluation of TERA responses to scope-related NRC comments pertinent to

Appendix A and DSAPs VIII through XI, which were provided in letters dated August 9

and Septemb'er 30, 1985. TERA's verbal responses during the inspection have been

compared with formal responses to the same comments in TUGC0 letter CPRT-113 dated

November 22, 1985, and any discrepancies have been highlighted in Appendix 11 to

the enclosed inspection report. The team did not address programmatic comments

in the NRC letters.

Section 1 of the report provides a summary of the results of the inspection and

the conclusions reached by the inspection team. In general, the team found that

the NRC scope-related comments are addressed in the existing DAP review checklists

or will be included in checklists to be developed as a result of the Phase 3 scope

validation process. This finding was on specific scope-related comments. The

team did not evaluate the DAP scope in general, which NRR is addressing relative

to its review of homogeneous design activities (HDAs). The report identifies the

need to expand or clarify some existing checklists. In a future inspection, the

team will followup with respect to these checklists and will review the Phase 3

checklists.

?$f800$

o

0

)

_. _ _ _ . - __ . _ _ - - . _ _ __ _ . _ _ . - _ - _ . _ _ _ . _ _ _ _ _ . - . _ . _ . - ..

. e

.

W. G. Counsil 3 JAN 211!B6

Should you have any questions concerning this inspection, please contact me or

Mr. Donald Norkin (301-492-4533) of this office.

Sincerely,

'

Origind Signed By

james M.T4 tcr

Jarres M. Taylor, Director

Office of Inspection and Enforcement

Enclosures: As stated

Distribution

DCS

QAVT Reading

JMTaylor, IE i

RHVollmer, IE

BKGrimes, IE

GTAnkrum, IE

Elmbro IE

l DNorkin, IE

l VNoonan, CPP

LShao, CPP

JCalvo, CPP

CTrammell, CPP

RMartin, RIV

STreby, ELD

LChandler ELD

DLanders Teledyne

AVietti-Cook, CPP

l

GMizuno, ELD

.

R

i

l

  • SEE PREVIOUS COPY FOR CONCURRENCE

\ \0

QAB:QAVT QAB:0AVT C:0AB:QAVT 0:0AVT N:DD IE 7

  • DNorkin *JLMilhoan *GTAnkrum * BV. Grimes *PI4Volliner a lor

1/ 8 /86 1/ 9 /86 1/ 14/86 1/ 6/86 1/ 14/86 1 ( g86

NRR

  • VNonnan

1/ /86 )

(

l

-__ _ _ _ . . _ _ _ _ . . _ . . _ - , _ . _ _ _ _ - . _ . - _ _ _ - - - _ _ _ - . _ . _ - - . - - _ - . _ _ _ _ _ _ _ _ _ _ _ . _ .

A' *

a

{ W. G. Counsil . 3 JAN 21 m

.

Should you have any questions concerning this inspection, please contact me or

Mr. Donald Norkin (301-492-4533) of this office.

Sincerely,

! /

A /, Director

<

,

'fic f Inspection and Enforcement

,

Enclosures: As stated

.

I

!

l

l

O

4

0

'

l

,

L

-_-._- _- ._ _ _ .-_ _ , _ _ _ _ _ _ _ _ _ _ _ _ , _ _ . _ - - - - _ _ -

_. - - . _ _ _ - _ _ . _ _ _ . _ - _ - - - -

_ - _ _ _ _ _ - _ . __ _ . _ _ _

4

-

.

.

JAN 811986

W. G. Counsil Comanche Peak Steam Electric Station

'

Texas Utilities Generating Company Units 1 and 2

cc:

Nicholas S. Reynolds, Esq. Resident Inspector / Comanche Peak

Bishop, Liberman, Cook, Nuclear Power Station

Purcell & Reynolds c/o U.S. Nuclear Regulatory Commission

1200 Seventeenth Street, N. W. P.O. Box 38

Washington, D. C. 20036 Glen Rose, Texas 76043

Robert A. Wooldridge, Esq. Regional Administrator, Region IV

Worsham, Forsythe, Sampels & U. S. Nuclear Reguletory Commission

Wooldridge . 611 Ryan Plaza Drive Suite 1000

2001 Bryan Tower, Suite 2500 Arlington, Texas 76011

Dallas, Texas

.1

Mr. Robert E. Ballard, Jr. Larry A. Sinkin

,

Director of Projects Christic Institue

i Gibbs and Hill, Inc. 1324 North Capitol Street

11 Pen Plaza Washington, D. C. 20002

New York, New York 10001

'

Mr. R. S. Howard . Ms. Billie Pirner Garde '

! Westinghouse Electric Corporation Citizens Clinic Director

P.O. Box 355 Government Accountability Project

'

Pittsburgh, Pennsylvania 15230 1901 Que Street, N. W.

Washington, D. C. 20009

,

l

Renea Hicks, Esq. David R. Pigott, Esq.

Assistant Attorney General Orrick, Herrington, & Sutcliffe

Environmental Protection Division 600 Montgomery Street

P.O. Box 12548, Capitol Station San Francisco, Californie 94111

Austin, Texas 78711

Mrs. Juanita Ellis, President Anthony Z. Roisman, Esq.

Citizens Association for Sound Energy Trial Lawyers for Public Justice

1426 South Polk 2000 P Street, N. W.

Dallas, Texas 75224 Suite 611

Washington, D. C. 20036

Ms. Nancy H. Williams Nancy E. Wiegers

CYGNA Spiegel & McDiarmed

101 California Street 1350 New York Avenue, N. W.

San Francisco, California 94111 Washington, D. C. 20005-4798

Robert P. Lessy, Jr.

.

Morgan, Lewis & Doktus

! 1800 M Street, N. W.

1

Suite 700, North Tower

'

Washington, D. C. 20036

i

_ _ _ . ._ _. __ ___

. . ., .

2- JAN 211986

Texas Utilitie' Electric

s Company Comanche Peak Electric Sta. tion

ll nits 1 and 2

CC:

Resident Inspector - Comanche Peak

c/o U. S. Nuclear Regulatory Commission

P.O. Box 1029

Granbury, Texas 76048

Mr. John W. Beck

Vice President

Texas Utilities Electric Company

Skyway Tower

400 North Olive Street, L. B. 81

Dallas, Texas 75201

.g*

Mr. Jack Redding

Licensing

Texas Utilities Generating Company

4901 Fairmont Avenue

Bethesda, Maryland 20814

William A. Burchette, Esq.

l

Heron, Burchette, Ruckert & Rothwell

Suite 700

1025 Thomas Jefferson Street, N. W.

Washington, D. C. 20007 .

2

Mr. James McGaughy *- *

Southern Engineering Company of Georgia

1800 Peachtree Street, N. W. *

Atlanta, Georgia 30367-8301

Administrative Judge Peter Bloch

U. S. Nuclear Regulatory Commission

Washington, D. C. 20555

Elizabeth B. Joh'nson

Administrative Judge

Oak Ridge National Laboratory

P.O. Box X. Building 3500 i

Oak Ridge Tennesse 378,30

'

Dr. Kenneth A. McCollom, Dean i

Division of Engineering, Architecture

and Technology

Oklahoma State University

Stillwater, Oklahoma 74074

, Dr. Walter H. Jordan

881 Outer Drive

! Oak Ridge Tennesse 37830

i

.

. . _ . _ _ _ -. . -- _ _ _ _ _ _ _ - - _ . _ -_- _