Text
- * "%
8
. #o,j
UNITED STATES
.
NUCLEAR REGULATORY COMMISSION
o
$
WASHING TON, D. C. 20555
%,*****/
JAN 211986
-
Docket Nos.:
50-445
50-446
Mr. W. G. Counsil
Executive Vice President
Texas Utilities Generating Company
400 North Olive Street, L.B. 81
Dallas, TX 75201
Dear Mr. Counsil:
SUBJECT:
INSPECTI0lP0F COMANCHE PEAK DESIGN ADEQUACY PROGRAM SCOPE VALIDATION
PROCESS AND REVIEW CHECKLIST DEVELOPMENT - 50-445/85-17, 50-446/85-14
This letter conveys the results and conclusions of the inspection of the Comanche
Peak Design Adequacy Program (DAP) scope validation process and review checklist
development.
The inspection was conducted to the NRC's Office of Inspection and
Enforcement (IE).
The inspection team was composed of NRC personnel from IE and
the Office of Nuclear Reactor Regulation (NRR), as well as consultants.
The
inspection took place at TERA Corporation, Bethesda, Maryland during the period
from October 28 to November 1, 1985.
,
The inspection focused on the Comanche Peak Response Team (CPRT) Program Plan,
Revision 2, dated June 28, 1985, specific' ally Appendix A (Design Adequacy Program)
'
and Discipline Specific Action Plans (DSAPs) VIII through XI.
DSAPs VIII through
XI cover the civil / structural, piping / supports, mechanical systems / components, and
electrical /I&C disciplines, respectively.
A substantial portion of the inspection
involved evaluation of TERA responses to scope-related NRC comments pertinent to
Appendix A and DSAPs VIII through XI, which were provided in letters dated August 9
and Septemb'er 30, 1985.
TERA's verbal responses during the inspection have been
compared with formal responses to the same comments in TUGC0 letter CPRT-113 dated
November 22, 1985, and any discrepancies have been highlighted in Appendix 11 to
the enclosed inspection report.
The team did not address programmatic comments
in the NRC letters.
Section 1 of the report provides a summary of the results of the inspection and
the conclusions reached by the inspection team.
In general, the team found that
the NRC scope-related comments are addressed in the existing DAP review checklists
or will be included in checklists to be developed as a result of the Phase 3 scope
validation process.
This finding was on specific scope-related comments.
The
team did not evaluate the DAP scope in general, which NRR is addressing relative
to its review of homogeneous design activities (HDAs).
The report identifies the
need to expand or clarify some existing checklists.
In a future inspection, the
team will followup with respect to these checklists and will review the Phase 3
checklists.
?$f800$ 0
o
)
_. _
_
_ . -
__
. _ _ - - . _ _ __
_ . _ _ . - _ - _ . _ _ _ .
_ _ _ _ _ .
- . _ . _ . -
..
e
.
.
W. G. Counsil
3
JAN 211!B6
Should you have any questions concerning this inspection, please contact me or
Mr. Donald Norkin (301-492-4533) of this office.
Sincerely,
Origind Signed By
'
t
james M.T4 cr
Jarres M. Taylor, Director
Office of Inspection and Enforcement
Enclosures: As stated
Distribution
QAVT Reading
JMTaylor, IE
i
RHVollmer, IE
BKGrimes, IE
GTAnkrum, IE
Elmbro IE
l
DNorkin, IE
l
VNoonan, CPP
LShao, CPP
JCalvo, CPP
CTrammell, CPP
RMartin, RIV
STreby, ELD
LChandler ELD
DLanders Teledyne
AVietti-Cook, CPP
l
GMizuno, ELD
.
R
i
l
- SEE PREVIOUS COPY FOR CONCURRENCE
\\ \\0
QAB:QAVT
QAB:0AVT
C:0AB:QAVT
0:0AVT
N:DD IE
7
- DNorkin
- JLMilhoan
- GTAnkrum
- BV. Grimes
- PI4Volliner
a lor
1/ 8 /86
1/ 9 /86
1/ 14/86
1/ 6/86
1/ 14/86
1 ( g86
- VNonnan
(
1/
/86
)
l
-__ _ _ _ . .
. .
.
. _ - , _ . _ _ _ _ - . _ . -
- - - - . . - - . - - - . . .
A'
a
{
W. G. Counsil .
3
JAN 21 m
.
Should you have any questions concerning this inspection, please contact me or
Mr. Donald Norkin (301-492-4533) of this office.
Sincerely,
!
/
A
/
, Director
<
'fic
f Inspection and Enforcement
,
,
Enclosures: As stated
.
I
!
l
l
O
4
0
l
'
,
L
.
- - .
-
.
.
-
- - -
-_-._- _- ._ _ _ .-_ _ , _ _ _ _ _ _ _ _ _ _ _ _ , _ _ . _ -
- - - _
_ -
-
_ - _ _ _ _ _ - _ . __
_
. _ _ _
4
-
.
.
JAN 811986
W. G. Counsil
Comanche Peak Steam Electric Station
Texas Utilities Generating Company
Units 1 and 2
'
cc:
Nicholas S. Reynolds, Esq.
Resident Inspector / Comanche Peak
Bishop, Liberman, Cook,
Nuclear Power Station
Purcell & Reynolds
c/o U.S. Nuclear Regulatory Commission
1200 Seventeenth Street, N. W.
P.O. Box 38
Washington, D. C. 20036
Glen Rose, Texas 76043
Robert A. Wooldridge, Esq.
Regional Administrator, Region IV
Worsham, Forsythe, Sampels &
U. S. Nuclear Reguletory Commission
Wooldridge .
611 Ryan Plaza Drive Suite 1000
2001 Bryan Tower, Suite 2500
Arlington, Texas 76011
Dallas, Texas
.1
Mr. Robert E. Ballard, Jr.
Larry A. Sinkin
,
Director of Projects
Christic Institue
i
Gibbs and Hill, Inc.
1324 North Capitol Street
11 Pen Plaza
Washington, D. C. 20002
Mr. R. S. Howard
Ms. Billie Pirner Garde
'
.
'
Westinghouse Electric Corporation
Citizens Clinic Director
!
P.O. Box 355
Government Accountability Project
Pittsburgh, Pennsylvania 15230
1901 Que Street, N. W.
'
Washington, D. C. 20009
,
l
Renea Hicks, Esq.
David R. Pigott, Esq.
Assistant Attorney General
Orrick, Herrington, & Sutcliffe
Environmental Protection Division
600 Montgomery Street
P.O. Box 12548, Capitol Station
San Francisco, Californie 94111
Mrs. Juanita Ellis, President
Anthony Z. Roisman, Esq.
Citizens Association for Sound Energy
Trial Lawyers for Public Justice
1426 South Polk
2000 P Street, N. W.
Dallas, Texas 75224
Suite 611
Washington, D. C. 20036
Ms. Nancy H. Williams
Nancy E. Wiegers
CYGNA
Spiegel & McDiarmed
101 California Street
1350 New York Avenue, N. W.
San Francisco, California 94111
Washington, D. C. 20005-4798
Robert P. Lessy, Jr.
.
Morgan, Lewis & Doktus
!
1800 M Street, N. W.
Suite 700, North Tower
1
'
Washington, D. C. 20036
i
-
-
-
.
-
_ _ _ .
._
_.
__
___
.,
.
.
.
JAN 211986
2-
Texas Utilitie' Electric Company
Comanche Peak Electric Sta. tion
s
ll nits 1 and 2
CC:
Resident Inspector - Comanche Peak
c/o U. S. Nuclear Regulatory Commission
P.O. Box 1029
Granbury, Texas 76048
Mr. John W. Beck
Vice President
Texas Utilities Electric Company
Skyway Tower
400 North Olive Street, L. B. 81
Dallas, Texas 75201
.g*
Mr. Jack Redding
Licensing
Texas Utilities Generating Company
4901 Fairmont Avenue
Bethesda, Maryland 20814
William A. Burchette, Esq.
Heron, Burchette, Ruckert & Rothwell
l
Suite 700
1025 Thomas Jefferson Street, N. W.
Washington, D. C. 20007
.
2
Mr. James McGaughy
- -
Southern Engineering Company of Georgia
1800 Peachtree Street, N. W.
Atlanta, Georgia 30367-8301
Administrative Judge Peter Bloch
U. S. Nuclear Regulatory Commission
Washington, D. C. 20555
Elizabeth B. Joh'nson
Administrative Judge
Oak Ridge National Laboratory
P.O. Box X. Building 3500
i
Oak Ridge Tennesse 378,30
'
Dr. Kenneth A. McCollom, Dean
i
Division of Engineering, Architecture
and Technology
Oklahoma State University
Stillwater, Oklahoma 74074
,
Dr. Walter H. Jordan
881 Outer Drive
!
Oak Ridge Tennesse 37830
i
.
.
.
_
. _ _ _ -. .
-- _ _ _ _ _ _
_ - - _ . _
-_-
_