MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl IR 05000445/19983011998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML18065B0041996-10-11011 October 1996 Notification of 961016 Meeting W/Listed Licensees in Rockville,Md to Discuss Errors in Siemens Power Corp Large Break LOCA Models for 7 Plants & Licensee Assessments of LOCA Peak Cladding Temp & Corrective Actions ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML17164A4761994-12-23023 December 1994 Forwards Documents for NRC Staff Re Ongoing Review of Spent Fuel Pool Cooling Design Issues at Plant ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J Oconnor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant IR 05000445/19930991993-08-0404 August 1993 Notification of Significant Licensee Meeting W/Util on 930818 to Discuss Results of SALP Repts 50-445/93-99 & 50-446/93-99 ML20045C8631993-06-18018 June 1993 Notification of Significant Licensee Meeting W/Util on 930708 to Discuss Results of Internal Evaluation of 930515 Power Increase in Excess of Procedurally Prescribed Limits & to Address Concerns in Listed Insp Repts ML20035H6251993-04-30030 April 1993 Notifies Commission That Staff Will Not Issue Directors Decision Re 10CFR2.206 Petition by Natl Whistleblower Ctr Issued in Apr 1993.Decision Expected to Be Issued by Mid May 1993 ML20035C2171993-03-30030 March 1993 Discusses Comanche Peak Unit 2 Full Power Licensing.Addl Info Re Current 10CFR2.206 Petitions & Technical Info Re Thermo-Lag Encl ML20035C2251993-03-29029 March 1993 Recommends Issuance of Full Power OL for Comanche Peak Steam Electric Station Unit 2.Basis for Recommendation Contained in 930201 Readiness Assessment & Addl Info Submitted ML20034G7471993-03-0808 March 1993 Forwards Corrected Footnote Five of NRC Staff Reply to Cfur Request for Hearing & Leave to Intervene, ML20046C9661993-02-18018 February 1993 Notifies of NRC 930128 Meeting W/Numarc to Discuss NUMARC Plans to co-fund Performance of Ampacity Derating Tests of Fire Barrier Configurations Assembled by Util at Omega Point Labs.List of Attendees Encl ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl IR 05000445/19983011998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML18065B0041996-10-11011 October 1996 Notification of 961016 Meeting W/Listed Licensees in Rockville,Md to Discuss Errors in Siemens Power Corp Large Break LOCA Models for 7 Plants & Licensee Assessments of LOCA Peak Cladding Temp & Corrective Actions ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML17164A4761994-12-23023 December 1994 Forwards Documents for NRC Staff Re Ongoing Review of Spent Fuel Pool Cooling Design Issues at Plant ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J Oconnor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant IR 05000445/19930991993-08-0404 August 1993 Notification of Significant Licensee Meeting W/Util on 930818 to Discuss Results of SALP Repts 50-445/93-99 & 50-446/93-99 ML20045C8631993-06-18018 June 1993 Notification of Significant Licensee Meeting W/Util on 930708 to Discuss Results of Internal Evaluation of 930515 Power Increase in Excess of Procedurally Prescribed Limits & to Address Concerns in Listed Insp Repts ML20035H6251993-04-30030 April 1993 Notifies Commission That Staff Will Not Issue Directors Decision Re 10CFR2.206 Petition by Natl Whistleblower Ctr Issued in Apr 1993.Decision Expected to Be Issued by Mid May 1993 ML20035C5221993-04-0606 April 1993 Staff Requirements Memo Re SECY-93-083,w/respect to 930406 Motion for Stay of Full Power License for Comanche Peak Unit 2 & Petition to Intervene in Comanche Peak Proceedings ML20035C2171993-03-30030 March 1993 Discusses Comanche Peak Unit 2 Full Power Licensing.Addl Info Re Current 10CFR2.206 Petitions & Technical Info Re Thermo-Lag Encl ML20035C2251993-03-29029 March 1993 Recommends Issuance of Full Power OL for Comanche Peak Steam Electric Station Unit 2.Basis for Recommendation Contained in 930201 Readiness Assessment & Addl Info Submitted ML20034G7471993-03-0808 March 1993 Forwards Corrected Footnote Five of NRC Staff Reply to Cfur Request for Hearing & Leave to Intervene, ML20046C9661993-02-18018 February 1993 Notifies of NRC 930128 Meeting W/Numarc to Discuss NUMARC Plans to co-fund Performance of Ampacity Derating Tests of Fire Barrier Configurations Assembled by Util at Omega Point Labs.List of Attendees Encl ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp 1999-08-27
[Table view] |
Text
-
,u.%
eg(
,,f Zo,,
UNITED STATES P'
+
g g
NUCLEAR REGULATORY COMMISSION O
E WASHINGTON, D. C. 20555 e
e NOV26 W Docket No:
50-445/50-446 MEMORANDUM FOR:
L. Shao J. Calvo J. Milhoan FROM:
A. Vietti-Cook, Project Manager Comanche Peak Project
SUBJECT:
TRIP REPORTS The following is a list of NRR/IE staff audits / inspections I have recorded for the months of October, November, and December 1985, for which trip reports must be written:
Date Lead Subject
- 1. 10/10-11/85 D. Jeng Site inspection pertaining to Civil / Structural issues
- 2. 10/25/85 D. Jeng Audit Ebasco effort related to cable tray / conduit supports
- 3. 10/25/85 D. Terao Audit Stone & Webster activities related to small bore piping review
- 4. 11/5/85 D. Terao Site inspection of Stone & Webster 11/20/85 Walkdown(CPP-8)
- 5. 11/8/85 D. Jeng Audit of Ebasco activities in review of cable tray / conduit supports related specifications and design documents
- 6. 11/11/85 D. Terao Audit of construction adequacy program as it relates to Stone & Webster piping and pipe support effort
- 7. 11/13/85 D. Jeng Observation of CCL test of conduit supports and components 8, 11/18-22/85 D. Jeng Site inspection of Unit 1 cable tray supports - as-built drawirgs
- 9. 10/9-10/85 J. Calvo Audit of homogeneous construction 10/16-18/85 activities 10/28-31/85 12/2-13/85(Final) ww!*L 2P
r 9
- 10. 11/4-6/85 J. Calvo Audit of homogenous design 11/12-13/85 design activities 12/2-3/85
- 11. 10/28-11/4/85 J. Milhoan Inspection of Design Adequacy Review
- 12. 10/20-24/85 J. Milhoan Inspection of QA Program Procedures
- 13. 11/25/85 S. Hou Audit of Stone & Webster non-seismic piping effects on seismic design piping
- 14. 11/26/85 D. Jeng Audit of Ebasco application of AISC code provisions regarding cable tray hanger design
- 15. 12/3-4/85 S. Hou Site inspection pertaining to mechanical / piping issues
- 16. 12/5-6/85 D. Jeng Technical review of allegations in S. Hou structural and mechanical areas.
- 17. 12/10-11/85 D. Jeng Observation of ANC0 cable tray testing
- 18. Unscheduled J. Milhoan Inspection / familiarization of Gibbs & Hill design procedures /
process Please prepare trip reports as promptly as possible following the inspection / audit. Please have your secretary put the docket number on the report (50-445 Unit 1, 50-446 Unit 2) with a copy to PDR, T. Westerman and myself. Please clearly identify any potential items of non-compliance or deviations for the Region to act on. Tom Westerman has been provided with r
this list of staff activities and will indicate the inspections / audits that l
NRR/IE conducted for a particular month in a Region IV inspection report and i
will indicate a copy of the trip report will be placed in the PDR upon l
completion.
If this list is incorrect, please contact me immediately, l
tj%.:S
. JMYD Annette Vietti-Cook, Project Manager l
Comanche Peak Project
[
cc:
D. Eisenhut l
H. Thompson V. Noonan C. Trammell T. Westerman D. Jeng D. Terao l
S. Hou C. Early S. Burwell
-f a
UNITED ST ATES
- '"6%
NUCLEAR REGULATORY COMMisslON t
wAsmuotos. o.c. rosss gg MEMORANDUM FOR: NRC Teledyne Others C hhrinos J. Flaherty B. Saffell, Battle Columbus J. Knox J. Rivard M. Yost, EG&G E. Tomlinson J. Malonson J. Nevshemal, WESTEC S. Hou R. Hookway N. Rivera D. Jeng L. Stanley, Zytor D. Terao R. Masterson, EAS D. Lurie V. Farrarini, EAS W. Smith R. Philleo C. Hale H. S. Phillips FROM:
Lawrence Shao, Manager Engineering Group Comanche Peak Project Jose A. Calvo, Manager Systems / Operational Group Comanche Peak Project
SUBJECT:
SAFETY EVALUATION REPORT OUTLINE RELATED TO COMANCHE PEAK RESPONSE TEAM (CPRT) PROGRAM PLAN, REVISION 3 Enclosed is an outline to be used as a guide for preparing the Safety Evaluation Report (SER) related to Comanche Peak Response Team (CPRT) Program Plan. The SER will include four main sections:
o Executive Sumary Staff Evaluation of the CPRT Program Plan o
Staff Evaluation of the CPRT Design Adequacy Review o
Staff Evaluation of the CPRT Construction Adequacy Review o
The persons and/cr organizations responsible for providing direction and ensuring overall consistency for each main section are identified on the top of the first page of each main section of the SER outline. Also, the outline identifies the persons and/or organizations responsible for preparing the various subsections Teledyne will be responsible for the consolidation within each main section.
of the SER inputs and logistics for preparing the first draft SER.
The applicable responses to the NRC Staff Evaluation of CPRT Program Plan, Revision 2 submitted on November 22, 1985; relevant audits perfomed by the hRC concerning the CPRT Program Plan; and forthcoming Revision 3 of the Plan will fom the basis for the safety evaluation. There is sufficient infomation avail-able at this time that we can proceed with the preparation of the SER. Addition-al infomation such as Revision 3 to the CPRT Program Plan will be evaluated on a confimatory basis and any necessary adjustments will be made to the SER.
d Q-(grd:Y 3 f S Cr - c26 J
F We recognize that the preparation of this first-of-the-kind SER will be a significant undertaking. However, we believe that the persons participating in this task have the necessary expertise to meet this challenge and to complete the SER on schedule.
9 Lawrence Shao, Manager Engineering Group Comanche Peak Project g
s, n
/
,pc in. t u v
/
Jose A. Calvo, Manager Systems / Operational Group Comanche Peak Project
Enclosure:
As stated cc:
D. Eisenhut C. Trannel H. Thompson A. Vietti-Cook R. Bernero T. Westerman F. Miraglia P. Keshishian G. Arlotto C. Haughney V. Noonan D. Landers
r Res>onsibility J. ;alvo (NRC)
L.Shao(NRC)
CONSOLIDATION OF SER IhPUTS AND LOGISTICS FOR PREPARING SER......Teledyne SAFETY EVALUATION REPORT OUTLINE RELATED TO COMANCHE PEAK RESPONSE TEAM (CPRT)
PROGRAM PLAN REVISION 3
r a
CONTENT S Responsibility E. Marinos (1) (NRC)
ABSTRACT.............................................
B. Saffel (Batte111e Columbus)
Teledyne CONTRIBUTORS.........................................
ACRONYMS AND ABBREVIATIONS........................... Teledyne E. Marinos (1) 1.
INTRODUCTION.....................................
B. Saffell 2.
SUMMARY
OF NRC REVIEW AND EVALUATION............. E.Marinos(1)
B. Saffell 2.1 CPRT Program Plan 2.2 CPRT Design Adequacy Program Plan 2.3 CPRT Construction Adequacy Program Plan E.Marinos(1) 3.
C0hCLUSIONS......................................
B. Saffell E. Marinos (1) 4.
SUtEARY OF OUTSTANDING ISSUES....................
Teledyne (2) (3) (EAS)
R. Masterson E. Marinos (1) 5.
CONFIRMATORY ISSUES..............................
Teledyne (2) (3)
R. Masterson APPENDICIES 1.
Staff Evaluation of CPRT Program Plan............ Teledyne(1)
B. Saffell A.
Staff Evaluation of CPRT Design J. Knox (1)
Adequacy Program Plan..........................
(1)
D.Jeng(1)
S. Hou (NRC)
B.
Staff Evaluation of CPRT Construction E. Tomlinson (1) (NRC)
Adequacy Program Plan..........................
M. Yost (EG8G)
[
l CONTENTS i-1 APPENDIX i Responsibility STAFF EVALUATION OF CPRT PROGRAM PLAN................ Teledyne (1)
B. Saffell B. Saffell 1.
INTRODUCTION.....................................
,2.
CPRT PROGRAM PLAN DESCRIPTION..................... B. Saffell CPRT Design Adequacy Program Plan (DAPP)(CAPP) 2.1 CPRT Construction Adequacy Program Plan 2.2 3.
NRC REVIEW AND EVALUATION........................
B. Saffell 4.
CPRT CAPP AND DAPP COMMON REQUIREMENTS...........
4.1 QA/QC of CPRT Activities.................... Teledyne 4.1.1.
Introduction 4.1.2 CPRT Approach 4.1.3 Staff Evaluation 4.1.4 Conclusions 4.2 Acceptance Criteria......................... Teledyne o Incl. Safety Significance 4.2.1 Introduction 4.2.2 CPRT Approach 4.2.3 Staff Evaluation o Incl. Adverse Trends 4.2.4 Conclusions 4.3 Corrective Actions.......................... Teledyne 4.3.1 Introduction 4.3.2 CPRT Approach 4.3.3 Staff Evaluation 4.3.4 Conclusions 4.4 Independence of the CPRT/SRT Organization... E.Marinos(1)
B. Saffell 4.4.1 Introduction 4.4.2 CPRT Approach 4.4.3 Staff Evaluation 4.4.4 Conclusions
T 1-2 4.5 Discipline Interfaces....................... Teledyne 4.5.1 Introduction 4.5.2 CPRT Approach 4.5.3 Staff Evaluation 4.5.4 Conclusions 5.
OVERALL StMMARY AND CONCLUSIONS.................. Teledyne (1)
B. Saffell 6.
REFERENCES....................................... Teledyne e
A-1 CONTENTS APPENDIX A Responsibility STAFF EVALUATION OF THE CPRT J. Knox (1)
DESIGN ADEQUACY PROGRAM PLAh (DAPP)................ D.Jeng((1)
- 5. Hou 1)
J. Nevshemal (1) 1.
INTRODUCTION.....................................
(WESTEC)
R. Masterson J. Nevshemal (1) 2.
CPRT PROCESS FOR EVALUATION......................
R. Hasterson J. Nevshemal (1) 3.
STAFF REVIEW AND EVALUATION APPROACH.............
R. Masterson o Auditable Trail 4.
EXTERNAL SOURCE ISSUES o Incl. IAP Cygna J. Flaherty (Teledyne) 4.1 Introduction................................
J. Rivard (Teledyne) 4.2 Electrical, Instrumentation and N. Rivera (Independent)
Control Systems and Components Issues.......
4.2.1 Introduction 4.2.2 CPRT Approach 4.2.3 Staff Evaluation 4.2.4 Conclusions J. Nevshemal (1) 4.3 Mechanical Systems and Components Issues....
R. Masterson (3)
Teledyne (2) 4.3.1 Introduction 4.3.2 CPRT Approach 4.3.3 Staff Evaluation 4.3.4 Conclusions J. Flaherty (1) (EAS) 4.4 Civil and Structural Issues.................
J. Rivard (2) (EAS)
V. Farrarini (3) (EAS) 4.4.1 Introduction 4.4.2 CPRT Approach 4.4.3 Staff Evaluation 4.4.4 Conclusions
A-i Responsibility 4.5 Piping and Supports Issues.................. D.Terao(NRC)
R.Hookway(1)(Teledyne) 4.5.1 Introduction 4.5.2 CPRT Approach 4.5.3 Staff Evaluation 4.5.4 Conclusions 4.6 Closed External Source Issues............... Teledyne 5.
SELF-INITIATED EVALUATION 5.1 Scope.......................................
J. Nevshemal (1) 5.1.1 Introduction 5.1.2 CPRT Approach 5.1.2.1 Homogeneous Design Activities 5.1.2.2 Selection of Review Items 5.1.3 Staff Evaluation 5.1.4 Conclusiens 5.2 Electrical, Instrumentation and Control Systems and Components Design Activities..
N. Rivera 5.2.1 Introduction 5.2.2 CPRT Approach 5.2.3 Staff Evaluation 5.2.4 Conclusions 5.3 Mechanical Systems and J. Nevshemal (1)
Components Design Activities..............
R. Masterson (3)
Teledyne (2) 5.3.1 Introduction 5.3.2 CPRT Approach 5.3.3 Staff Evaluation 5.3.4 Conclusions 5.4 Civil and Structural Design Activities......
J. Flaherty (1)
J. Rivard (2)
V. Farrarini (3) 5.4.1 Introduction 5.4.2 CPRT Approach 5.4.3 Staff Evaluation 5.4.4 Conclusions
r A-3 Responsibility D. Terao 5.5 Piping and Supports Design Activities....... R.Hookway(1) 5.5.1 Introduction 5.5.2 CPRT Approach 5.5.3 Staff Evaluation 5.5.4 Conclusions J. Nevshemal (1) 6.
EXCLUSION OF VENDORS AND OTHER ORGANIZATION ACTIVITES................... Teledyne(2) 6.1 Introduction 6.2 CPRT Justification (Incl. Interfaces) 6.3 Staff Evaluation 6.4 Conclusions 7.
OVERALL
SUMMARY
AND CONCLUSIONS..................
J. Knox (1)
D.Jeng(()
S. Hou 1 Teledyne 8.
REFERENCES.......................................
o a
CONTENTS B-1 APPENDIX B Responsibility STAFF EVALUATION OF THE CPRT CONSTRUCTION ADEQUACY PROGRAM PLAN (CAPP)............ E. Tomlinson (1)
M. Yost B. Saffell 1.
INTRODUCTION.....................................
2.
CPRT PROCESS FOR EVALUATION......................
B. Saffell 3.
STAFF REVIEW AND EVALUATION APPROACH.............
B. Saffell o Auditable Trail 4.
EXTERNAL SOURCE ISSUES (ESIs) 4.1 Introduction................................
J. Flaherty J. Rivard 4.2 Electrical and Instrumentation Issues L. Stanley (Zytor)
Advisor J. Knox 4.2.1 Introduction 4.2.2 CPRT Approach 4.2.3 Staff Evaluation 4.2.4 Conclusions 4.3 Test Program Issues......................... Teledyne Advisor W. Smith (NRC)
- 3.1 Introduction 4.3.2 CPRT Approach 4.3.3 Staff Evaluation 4.3.4 Conclusions Mechanical and Piping Issues................. R. Hookway (1) 4.4 V. Farrarini (4)
R. Masterson (3)
D. Terao (2) 4.4.1 Introduction 4.4.2 CPRT Approach 4.4.3 Staff Evaluation 4.4.4 Conclusions
r-o B-2 Responsibility 4.5 Civil and Structural Issues.................
J. Flaherty (1)
J. Rivard (2)
V. Farrarini (4)
R.Philleo(3)
(Independent) 4.5.1 Introduction 4.5.2 CPRT Approach 4.5.3 Staff Evaluation 4.5.4 Conclusions J. Malonson (Teledyne) 4.6 QA/QC Issues................................
Advisor C. Hale (NRC) 4.6.1 Introduction 4.6.2 CPRT Approach 4.6.3 Staff Evaluation o Incl. App. P of SSER-11 4.6.4 Conclusions 4.7 Miscellaneous Issues........................ Teledyne Advisor H. S. Phillips (NRC) 4.7.1 Introduction 4.7.2 CPRT Approach 4.7.3 Staff Evaluation 4.7.4 Conclusions 4.8 Closed External Source Issues............... Teledyne 5.
SELF-IhlTIATED EVALUATION B. Saffell 5.1 Scope.......................................
5.1.1 Introduction 5.1.2 CPRT Approach 5.1.2.1 Homogeneous Construction Activities 5.1.2.2 Selection of Inspection Items............. Advisor D. Lurie (NRC) 5.1.3 Staff Evaluation 5.1.4 Conclusions 5.2 Electrical Equipment Popul ations............ M.Yost(1)
L. Stanley 5.5.1 Introduction 5.5.2 CPRT Approach 5.5.3 Staff Evaluation 5.5.4 Conclusions
~_
T B-3 Responsibility 5.3 Mechanical Equipment Populations 5.3.1 HVAC Equipment.......................
J. Flaherty J. Rivard 5.3.1.1 Introduction 5.3.1.2 CPRT Approach 5.3.1.3 Staff Evaluation 5.3.1.4 Conclusions 5.3.2 Mechanical Equipment.................
J. Flaherty (1) o Incl. Field Fabricated Tanks J. Rivard (2)
J. Nevshemal (3)
B. Saffell (4) 5.3.2.1 Introduction 5.3.2.2 CPRT Approach 5.3.2.3 Staff Evaluation 5.3.2.4 Conclusions 5.3.3 Piping and Bol ted Joints.............
J. Flaherty (1)
J.Rivard(2)(3)
R. Masterson V. Farrarini (4) 5.3.3.1 Introduction 5.3.3.2 CPRT Approach 5.3.3.3 Staff Evaluation 5.3.3.4 Conclusions 5.4 Structural Populations 5.4.1 Structural Steel......................
J. Flaherty (1)
J. Rivard (2)
V. Farrarini (3) 5.4.1.1 Introduction 5.4.1.2 CPRT Approach 5.4.1.3 Staff Evaluation 5.4.1.4 Conclusions 5.4.2 Concrete.............................
J. Flaherty (1) o Incl. Fill & Backfill Placement J. Rivard (2) s R.Philleo(3) 5.4.2.1 Introduction 5.4.2.2 CPRT Approach 5.4.2.3 Staff Evaluation 5.4.2.4 Conclusions
B-4 Responsibility 5.4.3 Liners...............................
J. Flaherty (1)
J. Rivard (2)
V. Farrarini (3) 5.4.3.1 Introduction 5.4.3.2 CPRT Approach 5.4.3.3 Staff Evaluation 5.4.3.4 Conclusions 5.4.4 Supports.............................
J. Flaherty (1) o Incl. Pipe Whip R. Masterson 5.4.4.1 Introduction 5.4.4.2 CPRT Approach 5.4.4.3 Staff Evaluation 5.4.4.4 Conclusions 6.
EXCLUSION OF VENDORS AND J. Flaherty OTHER ORGANIZATION ACTIVITES...................
J. Rivard 6.1 Introduction 6.2 CPRTJustification(Incl. Interfaces) 6.3 Staff Evaluation 6.4 Conclusions 7.
OVERALL
SUMMARY
AND CONCLUSIONS..................
E. Tomlinson (1)
M. Yost 8.
REFERENCES....................................... Teledyne f
t 4