Refers to 971219 Meeting at Facility Re NRC Evaluation of Performance in Five Major Areas of Safety Operations, Safeguards,Radiological Controls,Facility Support & Licensing Activities.List of Attendees & Presentation Encl
ML20198G406
Person / Time
Site: 07001201
Issue date: 12/30/1997
From: Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Matheson J
FRAMATOME COGEMA FUELS (FORMERLY B&W FUEL CO.)
References
NUDOCS 9801130027
Download: ML20198G406 (30)


Text

,

(

December 30, 1997 Framatome Cogema Fuels ATTF Mr. J. E. Matheson Plant Manager Lynchburg Manufacturing Facility P. O. Box 11646 Lynchburg. VA 24506-1646

SUBJECT:

PUBLIC MEETING

SUMMARY

(PERFORMANCE REVIEW)

Dear Mr. Matheson:

This letter refers to our meeting at the framatome Cogema Fuels Facility on December 19. 1997. during which we discussed the NRC evaluation of your performance in the five major areas of safety operations, safeguards, radiological cnn+rols, facility support and licensing activities.

The meeting also afforded you the opportunity to provide feedback to the NRC regarding your self assessment and perception of the NRC performance review. We appreciate the information you providea during the meeting regarding your intentions to increase management oversight of your licensed operations to ensure regulatory and safety compliance.

Specifically, we were encouraged to learn of your increased use of pre-operational assessments and of your intentions to release the " wet weather" stream in 1998.

As a result of our assessment, we intend to increase our inspections in the areas of management controls and material control and accountability while we maintain our normal inspection activities in the other areas.

A list of attendees at the meeting copies of the presentations used by you and the NRC are enclosed was furnished by you following our public meeting and was part of i

your discussions of licensee prcprietary information relative to your management organization, business vision and product development.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

9001130027 971230 PDR ADOCK 07001201 C

PDR

.li I! I!!! liliil.l.!!.I lt1 e

i e c !

y hh

e FCF 2

Should you have any que '

oncerning this letter, please contact us.

Sincerely.

(original signed by F,

J. McAlpine)

Edward J.

McAlpine. Chief Fuel Facilities Brantn Division of Nuclear Materials Safety Docket No. 70-1201 License No. SNM-1168

Enclosures:

1.

List of Attendees 2.

NRC Presentation 3.

Licensee Presentation 4.

Licensee Management Handout cc w/encls:

Gayle F. Elliott. Manager Safety and Licensing Framatome Cogema Fuels Lynchburg Manufacturing Facility P. O. Box 11646 Lynchburg. VA 24506-1646 Leslie P. Foldesi. Director Bureau of Radiological Health Division of Health Hazards Control Department of Health 109 Governor Street. Room 916 Richmond. VA 23219 Distribution w/encls:

E. McAlpine. Ril W. Tobin, Ril D.-Seymour. Ri!

P. Harich. NMSS P. Hiland. Rill C. Cain. RIV F. Wenslawski. RIV PUBLIC (Distribution w/encls cont'd - see page 3) l L

FCF 3

Distribution w/encls cont'd U. S. Nuclear Regulatory Comission ATTN: NRC Resident inspector Mail Code 42 P. O. Box 785 Lynchburg, VA 24505-0785 Distribution w/o encis:

License Fee Management Branch "Of f in til tiness f Ril:IMets

$l1M4flRE (p '(

m4NE WT47 L

DATE 12/ 5 5 /97 12/

/97 12/

/97 12/

/97 12/

/97 12/

/97 12/

- NY er=vy 4 m vts un vts e

vts un vts m

its e

vts e

OfflClk RECORD CDPY DOONNT IIAME: G a \\ASSE SS\\L I ENSE E \\F RAMATONVIT CSUMAR. F CF

LIST OF ATTENDEES December 19, 1997 Q. S. Nuclear Reaulatory Comission E. Ten Eyck. Director Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards B. Mallett, Acting Deputy Regional Administrator, Region 11 (Rll)

D, Collins Director, Division of Nuclear Materials Safety (DNMS), Ril E. McAlpine, Chief. Fuel Facilities Branch (FFB). DNMS, Ril R. Hannah, Public Affairs Officer, Ril C. Hughey, Senior Resident Inspector, FFB, DNMS, Ri!

D. Seymour Project Inspector, FFB, DNMS, Ril W. Tobin, Senior Safeguards Inspector, FFB, DNMS, Ril Framatome Coaema Fuels J. Andrews, Vice President Technology J. Connell, Director of Industry Relations P. Clergue, Liaison Officer T, Coleman, Vice President, Government Relations G. Elliott, Manager of Health and Safety R. Gardner, Manager, Quality Verification R. Ganther, Vice President, Business Development D. Gordon, Senior Health Physicists J. LaPlatney, Consultant F. Masseth, Manager of Resources and Systems J. Matheson, Vice President A. McKim, Manager of Quality and Licensing T Wilkerson, Manager of Manufacturing News Media K. Regan, Reporter, News and Advance of Lynchburg

s LICENSEE PERFORMANCE REVIEW FOR FRAHATOME COGEMA FUELS Revision Date: November 28, 1997 ASSESSHENT PERIOD: July 1, 1995 to September 28, 1997 A.

SAFETY OPERATIONS (Comprised of Criticality, Safety, Plant Operations, Fire Safety, and Management Controls)

Pfoaram Strenaths No significant program strengths in the area of safety operations

+

were identified, h Needina Imorovement Implementation of management controls +9 assure adherence to

+

license conditions and licensing base;.

Procedural controls for reporting plant operational events Proiected Challenaes to Performance Communication of management expectations to ensure strict adherence to postings and procedares.

8.

SAFEGUARDS (Comprised of Haterial Control and Accountability and Physical Security)

Proaram Strenoths No significant program strengths in the area of safeguards were identified.

Areas Needina Imorovement iianagement and operator understanding of, and implementation of

+

safeguards requirements especially those for activities that are new or different.

4 Procedure compliance with prompt communication and resolution of

+

l anomalies. discrepancies, or quaions concerning safeguards L

requirements before initiation or continuance of SNM related

-activities.

ENCLOSURE 2-

...-..-. ~.- -_ --~.- -,

,,,.. ~

2-Prompt determination of " lessons learned" (root causes, precursors, and generic implicatione) and comporting corrective actions and prompt reduction of cor.'ective actions backlog commensurate with safeguards importance and generic implications.

Implementation of requirements in Physical Security Plan.

Proiected Challenaes to Performance j

Implementation of proper requirements for first of a kind or infrequent activities.

Assurance of adequate training and qualification of new personnel assigned to positions in the MC&A program.

C._

RADIOLOGICAL CONTROLS (Comprised of Radiation Protection, Environmental Protection, Waste Management, and Transportation)

Proaram Strenaths No significant program strengths in the area of radiological i

controls were identified, i

Areas Needina Imorovement Management oversight of implementation of ALARA program.

Evaluation of analytical environmental sample results.

Proiected Challenaes to Performance Continued attention to transportation of licensed material for first of a kind or infrequent shipments.

O.

FACILITY SUPPORT (Comprised of Haintenance and. Surveillance, Emergency Preparedness, and Training)

Proaram Strenaths t

No significant program strengths in the area of facility support were identifled.

L i

=,.

. ;.,a,a ;,,- _.,

a -

= -. -

=._ ;. w-.= z

=

.. - - -. = -. -

3 Areas Needina Imorovement Documentation required by the configuration control program.

Proiected Cha11ences to Performance No significant challenges to performance were identified in the area of iteility support.

E.

SPECIAL TOPICS (LICENSING ACTIVITIES)

Proaram Strenaths No significant program strengths in the area of special topics were identified.

Areas Needina Imorovement Management oversight and control in assuring the adequacy of licensing amendment requests and responses to questions.

Proiected Challenaes to Performance No significant challenges to performance in the areas of special topics were identified, i

!i

!l

,i ll!

m_

e c

s m_

l n

ye a

t u

m gl F

i i

r r

c a o

ua r

bF m

f e

e Pwh g

g 9

7 c

e n

gi n

i o

9 vyrC n eLu 2

t e

isRe 1

c am n

h f

o e

t ut c

f L

o na i

am C

Mar R

F N

4l

!!!!ll4'

FCF Response

  • In all five areas we concur with the NRC assessment We have put in place or plan to put in place organization changes procedure changes physical changes L

training

  • To achieve i

strict compliance i

heightened awareness added management oversight more checks and balances more consistency of process control of FOAK activities i

better communication l

[

j 12-19-97

(.

i' j

Safety Operations

~

3 I

Implementation of management controls to assure

[

adherence to licensing conditions and basis j

- reorganization 6-1-97 l

- new personnel monitoring system ist qtr '98

- improved risk assessment process l

Procedural controls for reporting plant operational l

events

- more accountability in licensing and health safety l

- Corporate safety team to meet in January to j

improve safety and process training methods i

12-19-97 f

i i

L Safeguards

=l l

l L

i l

Management and operator understanding of safeguards l

requirements - especially for new or different activities l

- Three step process in place L

- Risk assessment (2) l Preoperational assessment Readiness review i

l

- 25 pre-ops in 1997 Procedure compliance with prompt resolution re safeguards prior to initiation or continuance of SNM l

l related activities t

l

- upgraded training in accountability j

- safety and licensing steps incorporated in route 12-19 dh i

i I

Safeguards

~

f (continued) l l

Implementation of physical security plan l

- Prompt determination of " lessons i

learned", and timely corrective actions

- New root cause procedure to be in j

place 1st qtr '98 i

l lessons learned" bulletin board on intranet l

i

- plan has been updated j

i 12-19-97

i

[

Radiological Controls i

Management oversight and implementation of ALARA l

- Tracking and assigning ALARA through QAR l

system

[

- SRB attendance improved j

- consequences of RWP violations strictly dealt with l

- concentrated effort on removal of contaminated material Evaluation of analytical environmental samples results 4

i

- full release of the wet weather stream 1st qtr '98 l

- more secure, retrievable record keeping in place l

l l

l i

12-19-97 l

l v

+ - - -

i-

+w*'

P m-e--m*

n--

e

+---4.*

ueem-+

e-'a-= = - - ' - +

Facility Support and Special Topics Documentation required by configuration control system

- recent pre-ops follow procedure

  • Management oversight and control in assuring adequacy of license amendment requests and responses to questions

- new management team aware of these past issues

- new organization with added check and balance provides more oversight 12-19-97

Conclusions

  • FCF recognizes the need to improve in all evaluated areas
  • Special emphasis has been given to new or infrequent work The new organization is designed to provide more management oversight
  • Safety and regulatory compliance are the most important activities at LMF We value the inspection process and thank the NRC for helping us to improve 12-19-97

Nuclear Regulatory Commission V anag emen~: V ee~:ing Decem 3er ' 9, ' 997 k

(

OkOO Ik ENCLOSURE 4

Agenda a introduction and Agenda Review Tom Coleman m Organization and Busin~ess Vision Tom Coleman a Fuel Performance John Matheson a Fuel Design and Licensing issues Barclay Andrews a Product Development Plans Ray Ganthner a Closing Comments All O

l

e, i

FCF Organization and Business Vision l

Tom Coleman, Vice President, Government Relations e

-u na n,

am=-- -

..I Framatome Technologies Group

=

Business Areas &

=

Parent Companies

" fMYNRM5 COGEMA i

i i

i i:

l 5

i l

hlome-Employeg &.

Frarbatome

~

M Fran l

Technol6gies, lhc.,

iCorporate. Services Cogsma Fuels L.H. Bahn

  • d J.E Hicks

- R.B. Hoffman e

t

  • Information Services
  • Integrated Outage Services
  • Control Components l
  • Engineering Services
  • ircole Detectors
  • Chem. & Enviror.. Tech.
  • Fuel-Related Services
  • Nuclear Waste Programs I
  • B&W Owners Group
  • Nuciecr Parts Center
  • Nuclear Valve Services
  • Diagnostic & Repair Services

= Simulation Services

  • Business Development w

~

Framatome Cogema Fuels l

mVision m Be the premier U.S. Nuclear supplier by delivering the best value to our customers l

mMission:

m Achieve technology leadership in the I

design and manufacture of high performance fuel and related products and l

services nGrow our fuel business by meeting future customer needs and leveraging the worldwide leadership and experience of Framatome and Cogema sinem 1314. ppt

Framatome Cogema Fuels Framatome Cogema Fuels Fran Albright R.B. Hoffman Execit.ive Secretary President m

Liaison Finance Officers Procurement Human Resourt.ss l

Lepel H.A. Hassan P.M. Clergue 3

Communications Resource &

Quality HealttVSafety &

Systems Management Licensing F.X. Masseth A.D. McKirn Manager Manager Business ar.d Business l

Government 1

Operations Techn %

r Intgah l

Relations t

M T.A. Coleman J.E. Matheson J.B. Andrews R.

r Vice President Vice President Vice President Vice President Manager a

1 a

2 mcm l314. ppt

A

/

f' 1

t 3

ki 0

b.

23 5

3 4

4

I DATE PRINTER 82/1tW2 LAST DATE MODinER 12/1097 *

^

FRAMATOME COGEMA FUELS QUALITY, HEALTH / SAFETY

& LICENSING I

A.D. MCKLM MANAGER K.M. STULTS SECRETARY l

l I

I

'^'^""U U#

M.K. COX G.F. ELLIOTT LR. MAYBERRY W.L 11BBS g

ENGINEER III MANAGER MANAGER MANAGER f

QUALITY AUDITS N ^

^

^

I O^

O^

^

& PROGRAMS 1

W

i

'~.

~

Resource and Systems Management r

Resource & Systems

-+;+T -c.

F.X. Masseth Menegw hm S.K. Clark M.R. Brandon uranium Menessr Secretary Manage Pelletizing Contract Manage FCF & Customer Uranium I

I l

i I

Uranium f

System &

Planning &

l F

Meherial Utilization &

Schedule invento;y i

inventGy &

I'*

Accountability C ec; 4 T.e.1 Managemer; j

Availabil3y P.A MM S.E. Carter P.E. Burneson R.K. Cothren E.H. Marshall j

Manager Meneger unneger l

Menegw i

Master Production Schedules Production Pitnning i PC and LAN Support Stores inventory Mgmt.

SNM Accountability & Control Uranium Utilization Plan Product Line Schedules inventory Management j Programming & Maint.

Shipping & Receiving Pellet Schedule Schedule Integration Materials Planning j of LMF AS400 T6ansportation & Containers Long Term Forecasts j FCFITCoordinator Near Term Product. Oversight Resource Demand Planning Mfg. System Leadership Mfg. System Training Proct roment FCF Lead S.A. Accurso J

..l Government Relations lVice President t _-_.

L I

Bill Decooman Hugh.Benton Supervisor Manger HLW Operations HLW Operations Lyn hburg

}as Vegas, NV

~ !

DATE PRINTED: 12/1E97 IAST DATE MODIF"JD 1IllIM7 s FQAMATOME COGEMA FUELS l

OPERATIONS l

J.E. MA11tESON JR.

l VICE PRESIDENT I

I V.D. HOLADAY D.M. MINOR

^

MANAGER

^

PROCESS ENGINEERING O

I I

I I

I J.S. RICKER J.S. WHITT T.S. Wit KERSON

^

^^

MANAGER MANAGER MANAGER PRODUCT ENGINEERING FACILITIES MANUFACTURING 1

E

llI

{i l

77 95 4

8 11/ n 2iI 1

M. D EH StD IR O P M E

VE ADAD TS A

1 YT SI EL CIB IVA T

I R L S Y I.

R P

E E l

K Y O S R CA R T

HE RO D L I

EC L E R

EC B. S E

H U

I MESA FF T

l l

Y YG G

O O

L T

1 N

O 1

S L

WD E EH E

R R N EI Y

O R

E GC SE AE M. N T D R N

NP E

A A H

A. C MIS G

S BI LV Y

C LA E

N T

A GN IRE N

E OREN SNGI AA G l

NN I

5 A E I

EMD L

E G

A U

O F

LE A

R M

E G

O C

E M

OT A

M A

R F

l fl' 1

Iil l1l ll l

l ll l

ll

l DATE PRLVIED: 12/1RST.

LAST DATE MODI 1GD-12/15N7 FOAM ATOME COGEMA FU ELS BUSINESS &

PRODUCT DEVELOPMENT R.W. GANTHNER VICE PRESIDENT C.E. CAREY SECRETARY I

I i

l I

P.E. BAKER EJ. COPM)LA D A.GOTTUSO A. POGOSIAN G.T. URQUHART PRODUCT MANAGER PROl>UCT MANAGER MANAGER FUEL PRODUCT SALES MANAGER ENGINEERING SERVICE CORE COMPONENT FUEL MANAGER BUSINESS DEVELOPMENT m

A 9

l Business Integration Management Clerical / Administrative Operations I

Business Business Oversight, Proposal Business l,

Strategy improvement

Cost, Management Integration i

Technology 1

4 and Risk 0

Support i

N 9 U

- RFP Review 1

(major)

Business and

- Obtains Marketing

- CIP & Metrics Output

-Team Awiits

- Proposa, 5-Yr,10-Yr Plan

- Team

-AFE Coordination i

Product

- Define Strategy:

- QST's Operating Plan imples:entation

- Cost of Quality o Generation Team i Development Strategic Plan

- CIP

- Cost Reduction (major)

Partnership Implementation Plan / Coordination e Writing I

Joint Venture

- Process

- Proposal Risk Review o Graphics Merger / Acquisition improvement

- NRC, DOE o Compliance tc RFP Resource and

- Metrics Interface /

=I Systems Coordination Coordination Management

-ISO 9000

- Mfg. Advisory Committee I

- Financial i

Advisory

Quality, Committee

- R&D Cornmi&*

i Health / Safety, 8 and Licensing i

i 1

i Government

)

i Relations I

1 bim697.p5

.