ML20198F875
ML20198F875 | |
Person / Time | |
---|---|
Site: | Washington Public Power Supply System |
Issue date: | 10/22/1975 |
From: | Cox T Office of Nuclear Reactor Regulation |
To: | Schwencer A Office of Nuclear Reactor Regulation |
Shared Package | |
ML20198F879 | List: |
References | |
CON-WNP-1097 NUDOCS 8605290127 | |
Download: ML20198F875 (1) | |
Text
I s,
d
. +
DISTRIBUTION:
LWR 2-3 Rdg / .
Docket flos.: 50-46 Docket Files (@)/
and 50-513 K0X OCT. 2 2 1975 A. Schwencer, Chief. Light Water Reactors Branch 2-3. DRL WNP EXAMINATION OF EXCAVATIONS e
Our SER, Section 2.5.2, page 2-34, states that "a staff geologist will examine the open excavations at the appropriate time."
Applicant has notified the LPM. Tom Cox, of dates the WNP-1 excavation 4 will be available for examination. LPM has accordingly informed R. Mc!!ullen, SAB.
After about 11/1/75. WNP-1 spray pond excavation will have been backffiled as necessary, the GSB will also have been backfilled, but in the containment excavation the Ringgold fonnation will still be exposed. The containment mudmat will be poured starting approximately 11/13/75.
. Copies of communications from applicant, dated 10/16 and 10/17, are attached.
.::ini s:cagW T. Cox, Project Manager Light Water Reictors Branch 2-3 Division of Reactor Licensing l
Attachment:
- 1. Ltr to R. Boyd dtd 10/16/75 '
from N. Strand
- 2. Record of Telephone Conversation to T. Cox from A. Hosler ccs: R. IfcMullen C. Stepp W. Gamill 0605290127 751022 o,,,.. x7886/ LWR 2-3__ UUUUOMO .. - _ _._
.u.m.... TCoxi m _.. ._. -- --
enve > .10/M../15. _ - --
Yoran AEC.lle (Rev. 9 93) ABCM 024o # v. e. novenmusme pointime oraisse sere.eae.see