Advises That Applicant Notified T Cox of Dates of Availability of Excavation for Exam,Per SER Section 2.5.2. Spray Pond Excavation Will Be Backfilled After 751101. Containment Mudmat Will Be Poured on or Around 751113
ML20198F875
Person / Time
Site: Washington Public Power Supply System
Issue date: 10/22/1975
From: Cox T
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20198F879 List:
References
CON-WNP-1097 NUDOCS 8605290127
Download: ML20198F875 (1)


Text

I s,

d

. +

DISTRIBUTION:

LWR 2-3 Rdg / .

Docket flos.: 50-46 Docket Files (@)/

and 50-513 K0X OCT. 2 2 1975 A. Schwencer, Chief. Light Water Reactors Branch 2-3. DRL WNP EXAMINATION OF EXCAVATIONS e

Our SER, Section 2.5.2, page 2-34, states that "a staff geologist will examine the open excavations at the appropriate time."

Applicant has notified the LPM. Tom Cox, of dates the WNP-1 excavation 4 will be available for examination. LPM has accordingly informed R. Mc!!ullen, SAB.

After about 11/1/75. WNP-1 spray pond excavation will have been backffiled as necessary, the GSB will also have been backfilled, but in the containment excavation the Ringgold fonnation will still be exposed. The containment mudmat will be poured starting approximately 11/13/75.

. Copies of communications from applicant, dated 10/16 and 10/17, are attached.

.::ini s:cagW T. Cox, Project Manager Light Water Reictors Branch 2-3 Division of Reactor Licensing l

Attachment:

1. Ltr to R. Boyd dtd 10/16/75 '

from N. Strand

2. Record of Telephone Conversation to T. Cox from A. Hosler ccs: R. IfcMullen C. Stepp W. Gamill 0605290127 751022 o,,,.. x7886/ LWR 2-3__ UUUUOMO .. - _ _._