ML20198F796

From kanterella
Jump to navigation Jump to search
Requests Response to Encl Util Inquiry Concerning Acceptability of Using Meb 3-1 Criteria & Reg Guide 1.46 to Evaluate Need for Hot Leg Loop Restraints on RCS
ML20198F796
Person / Time
Site: Washington Public Power Supply System
Issue date: 02/24/1978
From: Cox T
Office of Nuclear Reactor Regulation
To: Bosnak R, Pawlicki S
Office of Nuclear Reactor Regulation
References
CON-WNP-1158, RTR-REGGD-01.046, RTR-REGGD-1.046 NUDOCS 8605290095
Download: ML20198F796 (2)


Text

s 4

FEB 24 1978 a-Distribution y/6nclosure Docket Fil y Docket Nos. 50-460 /

LWR #3 Fire and 50-513

0. Parr M. Rushbrook T. Cox MEMORANDUM FOR: Robert J. Bosnak, Chief,. Mechanical Engineering Branch Division of Systems Safety Stefan S. Pawlicki, Chief, Materials Engineering Branch i

Division of Systems Safety

~

FROM:

Thomas H. Cox, Project Man;gsr, Light Water Reactors Branch No. 3, Division of Project Management i

THRU:

Olan D. Parr, Chief, Light Water Reactors Branch no. 3 Division of Project Manggement i

SUBJECT:

INQUIRY BY WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

CONCERNING USE OF MEB 3-1 AND REGULATORY GUIDE 1.46 i

WPPSS has forwarded an inquiry (enclosed) concerning the acceptability of i

using MEB 3-1 criteria to evaluate the need for hot leg loop restraints on the reactor coolant system. WPPSS wants NRC concurrence that the pipe beeak rules of MEB 3-1 may be used for reactor coolant piping.

I Since WPPSS has both WNP-1 and WHP-4 under construction, I believe we should

~

l respond with an assessment of the correctness of the WPPSS interpretation (asdescribedintheenclosure)withinacoupleofweeks. Plesse advise l

me on whether you will be able to respond by March 9,1978.

t Original Signed By:

T.caz Thomas Cox, Project Manager l

Light Water Redctors Branch No. 3 D'avision of Project Management l

Enclosure:

l Telecopy from WPPSS, dated February 22, 1978,

. Postulation of Breaks in the RCS Upp(er Hot Leg Loop Using 2.4 SM and Equations 10),

l (12), and (13) of MEB 3-1" r

l l

-- r:<.ce:

cc w/ enclosure:

J. Knight D. Tibbitts 1,~"_...;

R. Mattson W. Pike D. Vassallo S. Burwell l

0. Parr C. Stahle H. Si'ver l

8605290095 780224 PDR ADOCK 05000460 LWR #3:L LWR #':BC ovvieu w

~0Pa

'1 A

PDR

~

TCox:ce 4

...s.

. g 2/ 2 3 /78 2/ 23 /78 NRC PORM SIS (9 76) NROC 0240 W u. s.novsamment Paintine orricsa so,e-ene.sa4

O g..

A y '1d

~

DML:

Febiwry 22,1978 10:-

lom Cox - NRL I.<

FRON:

A.G. llusler - WPPSS POSTULAT10NOfEREAKSINlHERCS

.e UPPER t101 LEG LOOP USINC 2.4 6 N O

.I -

EquAT1065 (10), (12) NG (13) 0F Fift 3-1 In the WNP-1/4 PSM we connit to llegulatory Guide 1.46 which specifies the allosble stress range for ferritic steel as 2.0 Sra.

FIB 3-1 specifias an dlIUhable stre5s range Of 2.4 Sa for all materials (El.b (l),(a)).,

t further, for postulation of bre4Ls, PIB 3-1 allows calculated equation (10) stret.ses to eneed ?.4 5,,, provided, they are less than 3.0 Sm nd if the a

Cui is less thSn 0.1.

If greater than 3.0 Se, stresses calculated by.

equations (12) and (13) taken fr.dividually should be less than 2.4 % and Ct!f should be less tian 0.1.

Ifnot,breaisshallbepostulated.

(8.1,b t

(1)(b)).

I iki suth referentes tu equotion nua,bers and corresponding stress range allowi bles are n.ade in Regulatory Guide 1.46.

Also, M[B 3-1 invokes these rules soetif holly for Lies 1 piping between cont 31:icent isolation valves.

l l

We under star.J, hoaver, thdt the f4RC will allos application of the above to kr$ piping.

If this is true, we need not postulate split breaks in the

~

l upper hot leg nf the Id 5 (candy cane); the hot leg bug restraints provided l

to restrun out of-plate movecent due to the split breaks my be eliminated.

l k eliminate these ii5 restraints iur E -l we need NP.C concurrence that the pipe bred rules of P.tB 3-1 cay te used for prir.ary coolant piping; specifi-telly the use of the 2.4 S stress limit on ferritic and the use of y

equ3tions (10). (12) 6nj (13).

Rules regarding nuater of break locations at types of breds will follow those listed in PIB 3-1 for Class 2 and 3 pipinc 1

- -