Advises That NRC Acceptance of Util 850107 Process Control Program Re Waste Solidification Process Intended to Be on Interim Basis for Use W/Tech Spec 6.14.Future Rev Should Address Compliance w/10CFR61
ML20198F352
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/12/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
LSO5-85-11-016, LSO5-85-11-16, NUDOCS 8511140332
Download: ML20198F352 (3)


Text

+

  1. 0V 121985

-y. Docket No. 50-155 LS05-85-ll-016 Jl _ -Mr. Kenneth W. Berry-Director, Nuclear Licensing

. Consumers Power Company 1945 West Parnall Road

-Jackson, Michigan 49201

Dear Mr. Berry:

Re: Big Rock Point Plant

~

On August 26, 1985, the Comission issued Amendment No. 77 to Facility Operating License No. DPR-6 for the Big Rock Point Plant in response to your application dated January 7,1985 as revised by letter dated March 14, 1985. In addition, the Comission approved, as a reference document in the January 7, 1985 submission, a " Process Control Program" (PCP) which delineates the waste solidification process. This approval-was based on your documented methodology, which was found to generally comply with current NRC criteria.

The staff's acceptance of the PCP, however, was and is intended to be on an interim basis for use with Big Rock Point Technical Specification 6.14 The acceptability of the PCP is based on currently available guidelines, but a future revision should address compliance with 10 CFR Part 61 when revised guidance becomes available from the NRC.

If you have any question regarding the PCP or its interim approval, please contact your Project Manager, Mr. Thomas S. Potella.

Sincerely, ensmal sinand t, John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing cc: See next page DISTRIBUTION 1 6 2; RFell NRC.PDR TBarnhart (a) local PDR WJohns, RIII Library ORB #5 Rdg CMiles, OPA HThompson LHarmon

.0 ELD MVirgilio EJordan WMeinke BGrimes FCongel JPartlow CWillis TPotella CJamerson ACRS (10) [\ oI DL:0RB#5- DL:0RB#5 d DL:0RB#5

, CJamerson( TRotella:tm JZwolinski 11/j /85  ! i /u /85 t y / P/85 8511140332 851112

. PDR ADOCK 05000155

'o* UNITED STATES j  ! o NUCLEAR REGULATORY COMMISSION 3 E WASHINGTON, D. C. 20555 s.,.....j November 12, 1985 Docket No. 50-155 LS05-85-ll-016 Fr. Kenneth W. Ferry

-Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201

Dear Mr. Berry:

SUBJECT:

PROCESS CONTROL PROGRAM Re: Big Rock Point Plant On August 26, 1985, the Commission issued Amendment No. 77 to Facility Operating License No. DPR-6 for the Big Rock Point Plant in response to your application dated January 7,1985 as revised by letter dated March 14, 1985. In addition, the Commission approved, as a reference document in the January 7, 1985 submission, a " Process Control Program" (PCP) which delineates the waste solidification process. This approval was based on your documented methodology, which was found to generally comply with current NRC criteria.

The staff's acceptance of the PCP, however, was and is intended to be on an interim basis for use with Big Rock Point Technical Specification 6.14 The acceptability of the PCP is based on currently available guidelines, but a future revision should address compliance with 10 CFR Part 61 when revised guidance becomes available from the NRC.

If you have any cuestion regarding the PCP or its interim approval, please.

contact your Project Manager, Mr. Thomas S. Rotella.

Sincerely, w

(.

John A. Zwolinski, Chief Opera ing Reactors Branch No. 5 Division of Licensing cc: See next page

(

I Mr. Kenneth W. Berry Consumers Power Company Big Rock Point Plant cc:

Mr. Thomas A. McNish, Secretary

-Consumers Power Company 212 West Michinan Avenue Jackson, Michigan 49201-Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Big Rock Point Plant ATTN: Mr. David P. Hoffman Plant Superintendent Poute 3 -

Post Office Box 591 Charlevoix, Michigan 49720 Mr. I. Lee Moerland Chairman, Board of Comissioners P. O. Box 218 Charlevoix, Michigan 49720 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Pegional Administrator Nuclear Regulatory Comission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Nuclear Facilities and Envirorrental Monitoring Section Office Division of Radiological Health

. P. O. Box 30035 Lansing, Michigan 48909 Resident Inspector Big Rock Point Plart c/o U.S. NRC RR #3, Box 600 Charlevoix, Michigan 49720