ML20198F292

From kanterella
Jump to navigation Jump to search
Requests Review of Official Erda/Wppss Agreement on Leased Property for Facilities.Overall Staff Conclusions Will Be Documented in Sser to Be Issued Before 750902 Radiological Safety Hearing
ML20198F292
Person / Time
Site: Washington Public Power Supply System
Issue date: 07/24/1975
From: Cox T
Office of Nuclear Reactor Regulation
To: Grimes B, Houston R
Office of Nuclear Reactor Regulation
Shared Package
ML20198F276 List:
References
CON-WNP-1084 NUDOCS 8605280464
Download: ML20198F292 (1)


Text

(-

p.-

a

(

DISTRIBUTIO' i

Docket F es (2) l Dochet Nos.: 50-460 I.E 2-Rdg U E E 'c,

T.Cox and 50-513

'~

D. Crimes, Chief. Accident Analysic Eranch, DTR R. W. Houston, Chief, Industrial Security & Enargency Planning, DRL Thru A. Schwancer, Chief, Light Unter Reactors Branch 2-3. D"J.

,ERDA/WPPSS 1.C.':: 'O.:!T ON' LEASED PROPERTY FOR WNP-1,4 An official ERDA/'.!PPSS agreement has been cdbnitted by U?PSS for staff revicv and approval (sca 17.;P-1,4 SER, P. 2-2).

As this approval is reluired to go to a radiological safety hearing nov scheduled for Septenber 2,1975. I would c.ppreciate your early raview of the agree =ent, uhich has been distributed to your offices.

Please note that certain rights reserved by ERDA in the ar, rec ent may undermina the applicant's ability to exercisa continuous control over personnel and property uithin the exclusion area, or nay result in the installation of potential safety hazards within the c::clu: ion area, without advance notice to cither 1.7PSS or tha Unc, I belicvo these

(

considerations are pri=arily matters for AAB and ISEP evaluation.

OELD is conducting its own evaluation of the doct=ent. A cceting with tha applicant's attorney is tentatively scheduled for Tuasday, July 29, 1975, at which tica preli=inary co= cents vill ba discussed. Overall staff conclusions vill be docunanted 1n an SER aupplcnent to be issuad befora the radiological safety hearing.

.w r4.1['.':;..}

T. Cox, Project Manager '

Light Water Reactora Branch 2-3 Division of Ecactor Licensing ccs:

V. Mooro R. Vad Nicf E. Kctchen "L. Soffsr

~

s x7886/ LWR 2-3

.e TCox:rm 8605280464 750812 PDR ADOCK 05000460 E

PDR

r --

+ + -

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos.: 50-460 and 50-513 AU3.121975 J. Gallo, Chief Hearing Counsel, Office of Executive Legal Director MANAGEMENT ACTION ON WNP-1,4 DOCKET This memo is to request your effort in establishing,a rad. safety hearing date for this docket as soon after 9/1/75 as possible, but in any case soon enough that an ASL3 partial decision or order permitting additional LWA-2 work can be issued before 11/1/75. On 11/1/75, Applicant will have completed all work authorized under the LWA-1 and LWA-2_ issued on 8/1/75.-

The radiological safety review is complete, except for two remaining outstanding safety issues (not including the Appendix I evaluation) which are expected to be resolved and documented by 9/2/75. These issues are the ECCS final evaluatio'n and evaluation of an ERDA/WPPSS agreement covering Applicant authority to control exclusion area activities.

Current staff schedules for Appendix I resolution 1./

predict completion no earlier than 11/4/75, a full two months after all other rad. safety issues are closed.

It is my understanding that additional LWA-2 work beyond that already authorized will require the ASLB to convene a hearing.

If a hearing is not convened until the Appendix I evaluation is complete, we could not respond to the Applicant's need for additional work authorization by 11/1/75.

I recognize that a' full rad. safety hearing held in September may require that the hearing record be held open to achieve final disposition of the Appendix I matter. However, all of the rad. safety review except. Appendix I could be aired in September and on the basis of that examination the Board could be asked to authorize additional safety-related work as described in.10 CFR 50.10 (e)(3). This effort can be expected to result in the desired authorization by the time it is needed, by 11/1/75. It clso would avert the two month suspension of construction activities that would obtain if we simply wait for the Appendix I matter to be concluded on the schedule new forecast before going to hearing.

F s+

.The WNP-1,4 facility is a " golden plant".2./.

This action to maintain the current momentum of the licensing process is, in my view, reasonable and justified in this case.

In addition to the direct benefit to the Applicant and const=er public in eliminating an avoidable construction suspension, there is the recognized benefit of expeditiously co=pleting a licensing action soon af ter the actual technical review of Applicant's submittals is complete.

I t.

D A. Gianbusso, Director Division.of R G Licensing Office of Nuclear Reactor iegulation

References:

1.

Memo, D. Muller to A. Giambusso dtd 7/21/75, Appendix I Priority List 2.

Memo, R. Boyd to F. Schroeder, LWR ads, D. Muller dtd 10/16/74, Schedule /L!orkload Considerations Resultine from Announced Delays ces:

R. Heineman V. A. Moore D. Muller R. Tedesco s

H. Denton A. Schwencer E. Ketchen

.J.

Norris

\\

<c y

/9 9

9*b N *.%o X

M n.

sy e