ML20198F270
| ML20198F270 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 08/12/1975 |
| From: | Cox T Office of Nuclear Reactor Regulation |
| To: | Grimes B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20198F276 | List: |
| References | |
| CON-WNP-1083 NUDOCS 8605280458 | |
| Download: ML20198F270 (1) | |
Text
_______-___________ _____________________
1
- (,A DISTRIBUTION:
LUR 2-3 Rdg Docket Nos.: 50-460 Docket Files (2) 4 ""d TCox and 50-513
/4.g ; g r
R.
B. Grimes Chief, Accident Analysis Branch, DTR Thrut A. Schwencer, Chief, Light Water Reactors Branch 2-3, DRL EVALUATION REPORT ON WPPSS/ERDA AGREEtENT The ERDA/WPPSS agressent on the WNP-1,4 docket is one of only two y.,,
?>
outstarting issues (other than Appendix I final evaluation) as described in the 8/12/75 note to J. Gallo from A. Ciambusso (copy attached). Your review and report on the acceptability of this document to assure Applicant authority under 10 CFR 100.3(a) is needed in order to assure that it does not become the critical path work affort on the way to a scheduled CP decision on this docket.'
The formal ERSA/WPPSS agreement was docketed and distributed to your branch on 7/18/75. A copy of a 7/24 memo on this subject is also attached.
A draft agreement was given to Len Soffer on 6/13/75. Your response is requeste'das soon as possible, but not later than 8/18/75.
c4_1:a1 Ugni by
~ -
T. Cox, Project Manager Light Water Reactors Branch 2-3 Division of Reactor Licensing Attr.chmente:
1.
Memo to J. Gallo from A. Giambusso dated 8/12/75
' ~
2.
Hemo to B. Crimes from T. Cox dated 7/24/75 ces:
V. Ifoore E. Ketchen L. Soffer B605280458 750812 PDR ADOCK 05000460 A
PDR C LVI
- R o,,,,,, :c7886/ LWR 2 3
.... 7 2.y.L_.
.u...,
..Cox: r:2 ASchwe. er _
H/ /75 8/d/7'5 Form AEC 318 (Eev. 9 53) AECht 0240
- u. a; aovannassay rainerene orreces ser4 se e.see
..