ML20198F076
| ML20198F076 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/22/1998 |
| From: | Scherer A SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9812280042 | |
| Download: ML20198F076 (2) | |
Text
..
', 'U 50UTHERN CAlHORNIA A. Edward Scherer 8"
EDISON t%L., m An LDlh0N If71.RN4110\\Al"' Company December 22, 1998 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 ESF Timing Technical Specification thange Proposed Technical Specification Change NPT-10/15-454 San Onofre Nuclear Generating Station Units 2 and 3
References:
(1)
Letter dated May 29, 1996, from Dwight E. Nunn (SCE) to Document Control Desk (NRC), same subject (2)
Letter dated September 23, 1998, from James W.
Clifford (NRC) to Harold B. Ray (SCE),
Subject:
" Request For Additional Information For Load Sequencer Time Delay Relay Amendment (TAC Nos. M95865 and M95866)"
By Reference 1, Southern California Edison (SCE) requested amendments to the Facility Operating Licenses for San Onofre Nuclear Generating Station Units 2 and 3 to revise the acceptance criteria for the Agastat time delay relays used in the Engineered Safety Features load sequencers in Surveillance Requirement 3.8.1.18.
The purpose of the present letter is to withdraw our May 29, 1996 request for license amendments. Withdrawal at this time will allow the NRC to better focus its resources on issues of greater import to SCE.
SCE intends to revise and resubmit our request in 1999.
Our resubmittal will include the additional information requested by Reference 2.
\\
O i
9812280042 981222 PDR ADOCK 05000361 o\\
P PDR P. O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-168-7575
l
\\
Document Control Desk )
l l
l If you have any questions or would like additional information concerning this subject, please feel free to contact me or Mr. J. L. Rainsberry at (949) 368-7420.
Sincerely,
\\
4 i
1 cc:
E. W. Merschoff, Regional Administrator, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 l
J. W. Clifford, NRC Project Manager, San Onofre Units 2 and 3 4