ML20198F037

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 85-32 Re Seismic Separation Between Bldgs.Initially Reported on 850917.Final Rept Delayed Until 851115 Due to Extensive Investigation & Evaluation
ML20198F037
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/28/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-33852-TDS, DER-85-32, NUDOCS 8511140218
Download: ML20198F037 (2)


Text

_ _ _ _ _

Arizona Nuclear Power Project P.O. BOX 52034 e PHOENIX. ARIZONA 85072-2034 October 28, 1985 ANPP-33852-TDS /TPS U. S. Nuclear Regulatory Commission Region V hs 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 e6 Attention:

Mr. D. F. Kirsch, Acting Director s

Division of Reactor Safety and Projects

Subject:

Time Extension for Report - DER 85-32 1

D (o

A 50.55(e) Potentially Reportable Deficiency Relation to Seismic Separation Between Buildings File: 85-019-026; D.4.33.2

Reference:

(A) Telephone conversation between A. Hon and T. Siegfried on September 17, 1985.

(B) ANPP-33719 dated October 15, 1985 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by Knvember 1, 1985.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 15, 1985, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, Ic4

&nt A

E. E. Van Brunt, Jr. /

Executive Vice President Project Director EEVB/TRB/1df 8511140218 851028 DR ADOCK 05000528 PDR I &

,Th.N?

o ANPP-33852-TDS/TPS October 28, 1985 Mr. D. F. Kirsch DER 85-32 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 D. B. Kerner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. R. Bynum J. M. Allen D. Canady A. C. Gehr G. A. Hierzer W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde B. T. Patker J. Provosoli D. N. Stover J. D. Houchen J. E. Kirby J. G. Haynes Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway Suite 1500 Atlanta, Georgia 30339 I