ML20198E030

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/85-45 on 850930-1004.No Violations or Deviations Identified
ML20198E030
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/06/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20198E035 List:
References
NUDOCS 8511130126
Download: ML20198E030 (3)


See also: IR 05000424/1985045

Text

n

yetf&

.

u.

,t

-

.

November 6,1985

~feorgiaPowerCompany

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta,-GA 30302

Gentlemen:

SUBJECT: REPORT N0. 50-424/85-45

On September 30 - October 4,1985, NRC inspected activities authorized by NRC

Construction Permit No. CPPR-108 for your Vogtle Unit 1 facility.

At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

-Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by VLBrownlee)

Virgil L. Brownlee, Chief

Reactor. Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-424/85-45

. Sc w/ encl:

v'R. E. Conway, Senior Vice President

.I.NuclearPower

O. Foster, Vice President

and General Manager Vogtle Project

vfl. H. Gregory, III, General

Manager, Vogtle Nuclear Construction

J. Bockhold,. Jr. , Vogtle

Plant Manager

(cont'dcc-seepage 2)

'

8521130126 851106

PDR

ADOCK 05000424

1

I'

<

-.y_

.;,<

.

1

Georgia P,ower Company l-

2

November 6, 1985

?). cont'dcc)

L. T. Gucwa,' Chief

'

. Nuclear Engineer.

~ d uble A.-Thomas,-

Vice President-Licensing Vogtle

Project- .

Jd Groover, Quality-

.d.AssuranceSiteManager

W. Hayes,-QA Manager

4. T. Beckham, Vice President

& General Manager'- Operations

_.d. A.: Bailey, Project Licensing

'

v

Manager.

vGeorge F. Trowbridge, Esq.- .

Shaw, Pittman, Potts and Trowbridge-

d ruce W. Churchill,.Esq.

Shaw, Pittman, Potts and Trowbridge

A rnest.L. B1ake, Jr.,,Esq.

Shaw', Pittman, Potts and Trowbridge

dames _E. Joiner,Troutman,' Sanders,

Lockerman-and Ashmore.

vdames G. Ledbetter, Comissioner

Department of-Human ~ Resources

_dharles' H. Badger, Office of-

-Planning and Budget, Management

Review Division

_ deppish Kirkland, III, Counsel

Office of the Consumer's-Utility

Council

Mouglas C. Teper, Georgians Against-

Nuclear Energy

NaurieFowler,Esq.,LegalEnvironmental

.

Assistance Foundation

dim Johnson, Executive Director

Educational Campaign for a Prosperous

-Georgia

_

'

MortonB.Margulies,Esq., Chairman

'

Administrative Judge, Atomic Safety

-and Licensing Board Panel

,

A)r. Oscar H. Paris, Administrative Judge

Atomic Safety and Licensing Board Panel

Justave A. Linenberger, Jr., Administrative

,

-Judge, Atomic Safety and Licensing Board

,

Panel

Nillie Pirner Garde, Citizens

Clinic Director, Government-

Accountability Project'

l

bec w/ encl:

(See page 3)

. .-

.

. - .

.

3 ,.

,V

t

Georgia-Power Company

3

Novenber 6,1985

bec w/ encl:

4. Reis. ELD

. M. Sinkule, RII

A RC Resident Inspector

Document. Control Desk

. State of Georgia

,

a

..

/

,

_

t

RII

RII

RII

cg

CJ

n

MSi

e

-10/

85

10/ /85

10/h /85

!!NM

.

e