ML20198D514
| ML20198D514 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/04/1985 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20198D518 | List: |
| References | |
| NUDOCS 8511120359 | |
| Download: ML20198D514 (2) | |
See also: IR 05000430/2009005
Text
.
.
...
-_
. = _ . .
..
O
1
.
,
.
4 1985
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
4
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
l
This refers to the special safety inspection conducted by Messrs. J. Neisler
and R. Mendez of this office on April 30 through September 5, 1985, of
activities at Braidwood Station, Units 1 and 2, authorized by NRC Construction
,
,
Permit No. CPPR-132 and CPPR-133 and to the discussion of our findings with
Mr. D. L. Shamblin on August 30, 1985.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
,
examination of procedures and representative records, observations, and
,
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Appendix.
A written response
l
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosure will be placed in the NRC's Public Document
,
. Room.
The responses directed by this letter (and the accompanying Notice) are
'
not subject to the clearance procedures of the Office.of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
1
-e will gladly discuss any questions you have concerning this inspection.
i
Sincerely,
i
i
C'**s h i SI:n:d by'J.'J,';,* ,,q m
85
.
.,
J. J. Harrison, Chief
e
.
Engineering Branch
,
i
1
Enclosures:
1. -Appendix, Notice
>
of Violation
2.
Inspection Reports
No. 50-456/85021(DRS);
No. 50-457/85022(DRS)
,
See Attached List For Distribution
-
MMOL
-
1
,
.
.
Commonwealth Edison Company
2
4 1985
Distribution
cc w/ enclosures:
D. L. Farrar Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
J. F. Gudac, Plant Manager
C. W. Schroeder, Licensing and
Compliance Superintendent
DPE/ Document Control Desk (RIDS)
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
[
General's Office, Environmental
i
Control Division
i
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
i
H. S. Taylor, Quality Assurance
Division
!
E. Chan, ELD
J. Stevens, LPM, NRR
!
The Honorable Herbert Grossman, ASLB
The F7eorable A. Dixon Callihan, ASLB
The Ior.orable Richard F. Cole, ASLB
-
.
l
l
[
l
i
RIII
RIII
RIf
RI g
i
,GV
(Odd
4hh
Mendez/jk
Williams
deil
. Lig$
jo% son
tle
H ri
i
1/0}/85
gaf
jg
g,
-
l
-
- - -
-
-
- . - -
-
, - _
- -
-
- -