Application for Amends to Licenses NPF-35 & NPF-52,modifying TS Requirement 4.8.2.1.1.d & Associated Bases to Allow 18 Month Svc Test of 125-volt Vital Intrumentation & Control Power Sys Batteries to Be Conducted During Power Operations
ML20198D268
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/14/1992
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198D271 List:
References
NUDOCS 9205190292
Download: ML20198D268 (4)


Text

.

ll l

nua ha n comr m usruum Cataat>a kdrar Crumt.wDeprtim!

t u e fusednt 1MI Corscord Rsad (m3W113Nd Offu e

,' krt SC:9r45 t M't %31,14 610 s

DUKCPOWER

' May 14,1992 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk

. Washington, D.C. 20555

Subject:

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Proposed Technical Specification Amer.dment Deletion of Shutdown Requirement for Conducting Service Test of 125 Volt DC Vital Instrumentation and Control Power System Batteries (TS 3/4.8.2 and Bases) i Gentlemen:

Please find attached a proposed technical specification amendment submittal which will modify Technical Specification Surveillance Requiiement 4.8.2.1.1.d and the associated Bases to allow the 18-month service test of the 125-volt vital instrumentation and control

. power system batteries to be conducted during power operation as opposed to during shutdown as presently required by the technical specifications.

Attachment I contains the proposed markup to the affected technical specifications pages. contains the appropriate background information, technical discussion, and safety analysis in support of the proposed change. ' Pursuant to 10 CFR 50.91, Attachment 3

. contains the required No Significant Hazards Consideration determination, whereby the impact of the proposed amendment is reviewed against tne standards contained in 10 CFR 50.92. Attachment 3 also contains an Environmental Impact Arialysis,~ whereby the proposed amendment is reviewed against the criteria of 10 CFR 51.22 for environmental considerations. - A copy of this amendment request is being provided to the appropriate South l

Carolina state official.-

l Per a telephone conversation between Duke Power Company and NRC personnel on May 4, L

1992, it is requested that this amendment request be approved no later than August 24,1992

'(the date the grace period expires for conducting the service test on the next battery). This is to avoid having to shut down Unit 2 in order to conduct the test on battery 2EBD. Should

)

Unit 2 be forced to shut down between now and August 24,1992 and the shutdown is of L

sufficient duration for conducting the test, it will be conducted while the unit is shut down.

9205190292 920514

- [)/> f DR ADOCK 05000413 v

PDR 5

}

w mn

. -... - -. = - -. - _ -.......- -

k Document Control Desk Page 2 May 14,1992

-In such an event, Duke Power Company would still like to pursue the technical specification amendment request, but the requested approval date of August 24,1992 wov.id no longer

. apply.

Siiould you have any questions concerning this amendment request, please call L.J. Rudy at

-l (803) 831-3084.

Very truly yours, Ik. h.

M.S. Tuckman

- U R/s i

Attachments-Ac (W/ Attachments)-

S.D. Ebneter, Regional Administrator

- Region 11 W.T. Orders, Senior Resident inspector R.E. Martin ONRR Heyward Shealy, Chief

' Bureau of_ Radiological Health, SC American Nuclear Insurers M&M Nuclear Consultants INPO Records Center

+

l l

Document Control Desk Page 3 May 14,1992 M.S. Tuckman, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Catawba Nuclear Station License Nos. NPF-35 and NPF-52 and that all statements and matters set forth therein are true and correct to the best of his knowledge.

l

~

W s

M.S. Tuckman, Vice President I

Subscribed and sworn to before me this 14th day of May,1992.

$1/Av w 1 b s snr Nogry'Public

/

My commission expires:

hlov 21 RM i

h P

i Document Control Desk

- Page 4 Alay 14,1992-bxe (W/ Attachments):

A.V. Carr R.C. Futrell L.J. Rudy A.S. Bhatnager J.D. Finch J.W. Caldwell A.W. Gooch J.E. Thomas R.A. Dickard J.D. Glasser J.D. Wylie hi.E. Patrick - ONS R.O. Sharpe - hiNS R.L. Gill, Jr.

NChfPA /

NCEMC PhiPA SREC QV Tech Sves NRC Coord Document Conitol File CN 801.01 Group File CN-801.01 Corporate Records I

_ _